
What to look for when buying an old house
Old houses are built differently from modern ones. What to check element by element, which permissions to confirm, the survey to ask for and how to turn what you find into a budget before you offer.
An old house rewards patience. Check the structure, roof, damp, services and paperwork before you plan finishes, do the work in the right order, use materials that suit how the house was built and give the unknowns their own budget.

When renovating an old house, find out what the building needs before you plan what you want. Check the structure, roof, damp, drainage, electrics, plumbing and any hazardous materials first, then do the work in order: make it sound and dry, renew the services, and leave finishes until last. Give the unknowns their own budget.
Old houses are rarely expensive because of the kitchen you choose. They become expensive when a problem nobody priced appears halfway through, or when finished work has to be pulled out to reach something underneath. This guide covers the checks to make first, the order that protects your money, what old houses tend to hide and how to budget for it.
If you have not bought yet, our guide to what to look for when buying an old house covers the viewing, and our house survey checklist covers the survey.
Work through these before you draw up a scope or ask for a single quote. Each one either changes the order of work or adds a line to the budget.
| Check | What you are looking for | Who checks it |
|---|---|---|
| Structure | Cracks, movement, bulging walls, failed lintels, sagging floors | Building surveyor, structural engineer if needed |
| Roof | Slipped or missing coverings, rot in timbers, leaks, failed flashings | Surveyor, roofer |
| Damp and drainage | Its cause: gutters, downpipes, ground levels, leaks, past cement repairs | Surveyor experienced with traditional buildings |
| Timber | Rot and active woodworm in roof, floors and joinery | Surveyor, timber specialist |
| Electrics | Age and condition of wiring, fuse box, earthing | Registered electrician (inspection report) |
| Plumbing and heating | Old pipework, lead pipes, boiler age, water pressure | Plumber, heating engineer |
| Waste water | Mains connection or a private system, its condition and legality | Drainage specialist, local authority |
| Hazardous materials | Asbestos, lead paint | Asbestos surveyor |
| Paperwork | Listing, conservation area, past approvals, what was built without permission | Local authority, your conveyancer or local professional |
The HomeOwners Alliance (updated 4 September 2026) puts a full structural survey at £500 to £1,500 and says it is the best way to find out whether there is damp, structural work or a rewire to do. Our guide to finding out when your house was built and researching its history can help you understand how it was built and what has been changed.
Watch out
The Health and Safety Executive says asbestos can be found in any building built before the year 2000. Have suspect materials checked by a professional before anyone drills, sands, strips or demolishes, and keep the survey result with your records.
The order matters more in an old house than a new one, because each stage can damage or undo the one after it. A sensible sequence:
Jonathan puts it plainly, from his own experience: starting finishes before the building is stable and dry is one of the most common renovation mistakes, and typically means repeating the finishing work later. Our home renovation checklist turns this order into a step-by-step plan, and our scope of works guide shows how to write it down so builders price the same job.
Most damp and decay in an old house starts with water getting in from above or not getting away below. Blocked gutters, broken downpipes and slipped tiles are cheap to fix early and expensive to ignore. Our guide to what a new roof costs covers the bigger job if repairs are not enough.
Historic England (updated 24 June 2025) explains that most traditional buildings use natural materials such as earth, stone, brick and timber, which absorb, store and later release moisture. Lime mortars, renders and plasters keep those properties. It lists inappropriate past alterations and repairs, such as cement render that cracks, among the causes of gaps and moisture problems.
Tip
Before choosing plaster, render, paint or insulation for solid walls, ask what the wall is made of and how it dries. A cheaper modern product that traps moisture can cost more than it saves.
The HomeOwners Alliance quotes AXA Insurance at £1,000 to £2,000 for a specialist to treat dry rot, before the cost of repairing or replacing damaged timber, and £450 to £800 for professional woodworm treatment of the average loft in a three-bedroom home. It advises checking for sawdust around the holes, to tell an active infestation from an old one.
Old wiring is not automatically unsafe. Electrical Safety First ties the answer to the condition of the installation, and recommends owner-occupiers have it checked by a registered electrician every ten years. The Electrical Installation Condition Report tells you whether you face repairs, a partial rewire or a full one. Our guide to the cost to rewire a house covers published prices and the making good that follows.
Rural and farmhouse properties may have a private waste water system rather than a mains connection, and some have no mains water or power at all. Find out what is there, whether it works and what replacing it would mean before you plan anything else. Jonathan's own breakdown warns that rural mains connections can be expensive, slow and in some cases unavailable.
The HomeOwners Alliance notes that underpinning can cost up to £50,000 in the worst case, but that the Royal Institution of Chartered Surveyors estimates it is necessary in fewer than 10% of cases. Cracks need explaining by someone qualified, not guessing at.
A farmhouse brings the old house checks plus a few of its own. Add these to the list:
The method is the same everywhere: survey, make sound and dry, renew services, then finish. Permission rules differ, so they sit in these boxes.
In the UK (England and Wales)
GOV.UK says the Building Regulations 2010 cover the construction and extension of buildings, and lists alterations that might need building regulations approval, including replacing fuse boxes and connected electrics, installing a bathroom that involves plumbing, replacing windows and doors, replacing roof coverings, and installing or replacing a heating system. It adds that without approval you will not have the certificates of compliance you may need when you sell. Listed buildings and conservation areas have extra controls, so ask your local authority before work starts. Scotland and Northern Ireland have their own systems.
In Italy
Jonathan's cost breakdown advises sorting out the legal position before spending money on building work: building amnesty status, cadastral accuracy and planning compliance, confirmed in writing by your geometra. It notes that some maintenance is free building work, while other work needs a CILA, SCIA or a permission.
Elsewhere
Check with the local planning or building department where the property is. Do not assume one country's rules apply in another.


Mekozo's Costs & spending view shows your renovation costs room by room or by piece of work, and flags anything not yet priced, so the essentials are budgeted before the finishes.
Try it free for 30 days, no card neededFor an abandoned property in Sicily, Jonathan's own breakdown gives €60,000 to €120,000 or more for a full structural renovation of 80 to 120 square metres. See how to read cost per square metre figures without being misled. Our guide to how much it costs to renovate a house gives published UK ranges for the main jobs, and our full house renovation guide shows how to plan it room by room.
On the Operation Sicily villa
From the villa in Sicily. Jonathan bought his villa for €21,500 after it had been abandoned for decades. In Episode 14, he sets out the order he budgets in: a structural survey first, structure, plumbing and electrics before finishes, labour, materials, and permits and fees as separate lines, and a backup fund of 10% to 15%. The old house still had surprises. A single cesspit test decided whether the system could stay or cost upwards of €12,000 to replace; it passed (Episode 57). When the old kitchen window came out, the concrete lintels above it were found cracked by rusting rebar and had to be replaced (Episode 59). Every wall and ceiling was finished in mineral and lime based plaster so that all of them stay breathable. His cost breakdown now suggests holding back 20% to 25% of the build cost on an abandoned property, more than the backup fund first planned.
Playing loads YouTube’s external player.
Watch directly on YouTube ↗For the wider plan, see our guide to planning work on an older home and, if you are still deciding, our guide to buying a fixer-upper. To keep every line, quote and found problem in one place, see the renovation budget tracker and how to build a whole-project budget in Mekozo.
This guide explains a planning and budgeting method. It is not a survey or professional advice; have your own house inspected by qualified people.
Find out what the building needs before deciding what you want. Get a full survey, make the house safe and weathertight, then deal with structure, roof, damp and drainage before electrics, plumbing and heating. Finishes such as plaster, flooring, kitchens and decorating come last, so they are not damaged by the work that comes before them.
There is no reliable single figure, because condition decides the cost. In the UK, the HomeOwners Alliance (September 2026) puts a full structural survey at £500 to £1,500 and dry rot treatment at £1,000 to £2,000, says underpinning can reach £50,000 in the worst case, and suggests a contingency of around 10%. Price each package from quotes, starting with what the survey finds.
Not automatically. Electrical Safety First's guidance on when a house should be rewired turns on the condition of the installation rather than its age. An Electrical Installation Condition Report from a registered electrician tells you whether it needs repairs, a partial rewire or a full one.
Historic England explains that traditional walls of stone, brick, earth or timber with lime mortars and plasters absorb and release moisture. Cement renders and impermeable finishes can stop that drying and lead to damp and decay. Ask a surveyor or builder experienced with traditional buildings which materials suit your walls before you repair them.
It can be, if the price you pay leaves room for the work the building needs and you have time to do it in the right order. Work out the full cost before you commit: the purchase, the essential repairs, the improvements you want and a contingency. If the essential work alone does not fit the budget, it is a warning sign.
It depends on the work, the building and the country. In England and Wales, GOV.UK lists jobs such as replacing fuse boxes and connected electrics, replacing windows, roof coverings or a heating system among those that might need building regulations approval, and listed buildings and conservation areas have extra controls. Check with your local authority, or the equivalent body where the house is, before work starts.
Real renovation experience and regional guidance from Operation Sicily.

Old houses are built differently from modern ones. What to check element by element, which permissions to confirm, the survey to ask for and how to turn what you find into a budget before you offer.

There is no honest single figure for renovating a house. Here is how to build your own estimate from the size, the depth of work and the finish, using named, dated figures for each job.

Size your renovation contingency from the real unknowns in your project, keep upgrades out of it, and watch what is left after every change.
Budgets, quotes, payments, documents and decisions in one place
30 days free. No card needed.
Monthly, with no annual plan. The Terms of membership set out the details.