Choosing a property

What to look for when buying an old house

Old houses are built differently from modern ones. What to check element by element, which permissions to confirm, the survey to ask for and how to turn what you find into a budget before you offer.

An empty room in an old house with peeling wallpaper and a damaged floor
Contents

Key points

  • Look hardest at the roof, walls and damp, structural movement, timbers, wiring, plumbing and drainage, and at the permissions for past work.
  • Older buildings differ from modern ones, Historic England says, so judge them by how they were built, not by modern standards alone.
  • For older buildings, RICS recommends a Level 3 survey, and GOV.UK says a house built before 1919 needs a surveyor qualified to assess that kind of construction.
  • A valuation is not a survey: Historic England explains that a lender's valuation involves only a brief inspection, so an older home needs a survey of its own.
  • Check whether the house is listed or in a conservation area before you plan any changes, because that affects what you can alter inside and out.

What should you look for when buying an old house?

When buying an old house, look hardest at the roof and chimneys, the walls and any damp, signs of structural movement, timber decay, the age of the wiring, plumbing and drainage, and the paperwork for past alterations. Then check whether it is listed or in a conservation area, and get a survey from someone who knows older buildings.

This guide goes through each of those, explains why old houses need a different kind of look, and shows how to turn what you find into a budget before you make an offer. It helps you know what to ask; it does not replace a survey.

Why an old house needs a different kind of look

Historic England puts it simply: buying and living in an older building can be extremely rewarding, but older buildings differ from modern ones.

Many were built with solid walls, lime mortars and plasters, and timber that was meant to stay dry by letting moisture move through the building and out again. A modern house relies more on barriers: cavities, membranes and sealed finishes. That difference matters when you look at an old house, for two reasons:

  • Some things that look like faults are normal. Uneven floors, slightly out-of-true walls and old timbers can be centuries old and stable.
  • Some modern "fixes" cause problems. Cement render, cement pointing or impermeable paint on a wall built to breathe can trap moisture and create the damp they were meant to cure.

Historic England also notes that old houses are often branded as draughty and energy inefficient, but that, properly repaired and maintained, they can perform well. The question is not whether the house is old, but whether it has been looked after in a way that suits how it was built.

What to look for, element by element

You will not diagnose an old house at a viewing, but you can spot the signs that tell you what to ask the surveyor. Take photos with something for scale, and note where each one was taken.

ElementWarning signs to look forQuestion to ask
Roof and chimneysSlipped or missing tiles, a sagging ridge, leaning stacks, staining on top-floor ceilingsWhen was the roof last overhauled, and by whom?
Gutters and downpipesOverflowing joints, staining below them, plants growingWhere does the rainwater go?
WallsCracks wider than a hairline, bulges, crumbling or cement pointing on old brick or stoneHas the wall been rendered or repointed, and with what?
DampTide marks, musty smells, flaking plaster, mould behind furnitureWhat causes it, and has anything been "treated"?
StructureSloping floors, doors that will not close, diagonal cracks above openingsHas the house been monitored or underpinned?
Timbers and pestsSoft or powdery wood, holes, fungus, droppingsWhen was the roof space last inspected?
Windows and doorsRotten frames, failed lintels, cracks at cornersAre the windows original, and what are they made of?
ElectricsOld fuse boxes, round-pin sockets, cloth-covered cable, too few socketsWhen was the house last rewired, with a certificate?
Plumbing and heatingOld pipework, weak water pressure, an ageing boilerWhat are the pipes made of, and when was the boiler serviced?
DrainageSmells, slow drains, a private system such as a septic tankWhere do the drains go, and when were they last checked?

Roof, chimneys and rainwater

The roof keeps an old house alive. Most serious decay in old buildings starts with water: a slipped slate, a blocked gutter or a leaking valley that has been running into a wall for years. Look at the roof from the street and the garden, look at the top-floor ceilings, and if you can see into the roof space, look for daylight, wet timbers and droppings.

Walls, damp and repairs

Look at what has been done to the walls as much as at the walls themselves. Hard cement pointing or render on soft brick or stone, plastic paint on lime plaster, and sealed floors laid over old earth or stone can all hold moisture where it does harm. A damp-proofing certificate is not proof that a damp problem is solved; ask what the cause was.

Watch out

Be wary of anyone offering a damp treatment before the cause is known. In an older building the answer is often a gutter, a raised ground level outside, or the wrong material on the wall, not a chemical injection. Ask a surveyor experienced in older buildings to find the cause first.

Structure and movement

Old houses often have historic movement that stopped long ago. What matters is whether it is still moving. Fresh, sharp-edged cracks, cracks that are wider at one end, doors and windows that have started to stick, and gaps opening between walls and ceilings are worth a specialist's opinion.

Services: wiring, plumbing and drainage

Services wear out long before walls do, and they are hidden in the fabric, so the cost to replace them includes making good the plaster and floors afterwards. Ask when each was last replaced and for the certificate. A private drainage system, such as a septic tank or cesspit, needs its own check: what it is, where it discharges and whether it still works.

Hazardous materials

Older houses can contain materials that need care during any work, such as asbestos in later 20th-century additions or lead in old paint and pipes. They do not stop a purchase, but they affect how work is done and what it costs.

In France

The seller must provide a lead report if the home was built before 1 January 1949, and an asbestos report if the building permit was issued before 1 July 1997, according to Service-Public.fr. Other countries have their own rules, so ask your legal adviser what reports the seller must give you where you are buying.

Permissions: listing, conservation areas and past work

An old house has usually been altered many times. Two questions matter: what are you allowed to change now, and was everything done before you allowed?

In the UK

Check whether the property is listed or in a conservation area, and whether any trees are protected. Historic England says you can find out from the local authority, and recommends contacting it as soon as possible if you want to make alterations. GOV.UK's how to buy guide suggests checking the National Heritage List, because listing may affect your ability to make changes inside and outside the property. Your conveyancer's local authority searches will also show listed and conservation area status.

For past work, ask for the permissions and certificates for every extension, conversion, new window and rewiring. Work done without them can need regularising before you can sell, or before you can do your own work. Abroad, this can be a bigger question still: in Italy, many older houses have unrecorded changes, which is why our guide to buying a house in Italy puts a check of the building against the plans before any signature.

If you want to know more about the house's past, our guides to when your house was built and finding the history of your house show where to look. A house's history often explains its alterations.

The survey an old house needs

A viewing tells you what to ask; a survey tells you the answer.

  • Choose the right level. For older buildings, Historic England says RICS recommends a Level 3 survey. RICS describes it as its most comprehensive Home Survey, suited to larger, older or run-down properties and to buyers planning major works.
  • Choose the right surveyor. GOV.UK notes that properties built before 1919 are constructed differently, so make sure your surveyor is qualified to assess them.
  • A valuation is not a survey. If you are borrowing, any valuation is for the lender: Historic England explains that it advises the lender on the property's value as security, involves a brief inspection and is not a survey.
  • Ask for repair options and priorities. Historic England says a Level 3 survey can describe visible defects and potential hidden problems, outline repair options and the consequences of doing nothing, and comment on whether the energy improvements suggested in the EPC are appropriate.
  • Follow up the specialists. If the surveyor recommends a drains survey, an electrical test or a timber specialist, book them before you commit.

Our house survey checklist covers the survey process in more detail, and our guide to questions to ask when buying a house lists what to ask the surveyor afterwards.

Turn what you find into a budget before you offer

Costs & spending in Mekozo, close up: whole project £8,300 plus one unpriced item, paid £2,000, still to pay £3,500, £12,000 in the plan

Mekozo's Costs & spending view adds the buying costs and a first estimate of the work to one total, and flags what is not yet priced, so the old house is judged on its whole cost.

Try it free for 30 days, no card needed

An old house is a fair buy when its price reflects the work. That only works if the work has a figure.

  1. List every finding from your viewings and the survey, element by element.
  2. Mark each one as known (with a quote), estimated or unknown.
  3. Get written quotes for the big items: roof, structure, damp causes, rewiring, drainage.
  4. Add the knock-on work. A rewire means replastering; new drains mean digging up the garden.
  5. Add a contingency for what you cannot see. Old houses hide things. Our guide to sizing a contingency shows how to set one from your own risks.
  6. Add the costs of buying and any time living elsewhere.
  7. Compare the total with the price. Then decide what to offer, or whether to walk away.

For a full method, our guides to buying a fixer-upper and to how much it costs to renovate a house show how to build the figure. If you go ahead, deal with the roof, structure, damp and services before anything cosmetic, as our guide to renovating an old house explains.

On the Operation Sicily villa

From the villa in Sicily. When Mekozo's founder, Jonathan Smith, first viewed his villa in western Sicily, the signs were good: solid walls with no structural cracks, no peeling paint or damaged plaster, and no ceiling staining to suggest a failing roof, as he recalls in Episode 9 of Operation Sicily, where he films the renovation. Other things only showed later. The rodent infestation was far worse than the photos had shown. The house had been built without permits and regularised under a building amnesty (Episode 11). One test on the old cesspit decided whether it could stay or would need replacing at a cost of upwards of €12,000; it passed. And when the kitchen window came out, the concrete lintels above it were cracked by rusting steel (Episode 59). Every wall and ceiling was later finished in mineral and lime based plaster so they stay breathable, and his guide to traditional lime mortar and Sicilian stonework covers what restoring the old walls involved. The lesson for any old house: record what you see, and keep a line in the budget for what you cannot.

Playing loads YouTube’s external player.

Watch directly on YouTube ↗

Insurance and running costs

In the UK

Historic England says a standard home insurance policy might not be adequate for a listed building, and that the cost of rebuilding a listed building is likely to be higher than for a standard property. It suggests getting advice from a specialist insurance broker, or telling your insurer the property is listed.

Old houses also need regular care: gutters cleared, roofs checked and timber kept dry. Budget a yearly figure for maintenance from the start, rather than waiting for something to fail.

Buying an old house checklist

At the viewing

  • Roof, chimneys, gutters and downpipes looked at from outside
  • Top-floor ceilings and roof space checked for staining, daylight and damp timber
  • Walls checked for cracks, bulges and the type of pointing or render
  • Damp signs noted room by room, with photos
  • Floors, doors and windows checked for movement
  • Fuse box, sockets, boiler and water pressure checked
  • Drains and any private drainage system located

Questions and documents

  • Age of the house and the main alterations
  • Listed or conservation area status, and protected trees
  • Permissions and certificates for past work
  • Dates and certificates for rewiring, boiler service and roof work
  • Any reports the seller must provide where you are buying

Before you offer

  • Level 3 survey or equivalent, from a surveyor experienced with older buildings
  • Specialist checks the surveyor recommends
  • Written quotes for the major items
  • Contingency set for what cannot be seen
  • Insurance checked for the type of building
  • Whole cost compared with the price

For the earlier stages, see our guide to house hunting and comparing homes and the questions to ask when viewing a house. In Mekozo you can record each house in Viewing Mode, with its checklist, photos and notes, and keep the findings with its purchase costs; see how to compare properties without losing your priorities.

This guide explains what to ask and look for. It is not legal or survey advice; use a qualified surveyor and conveyancer.

Questions people ask

Is it worth buying an old house?

It can be, if you go in knowing what it will cost to put right and to keep. Historic England says buying and living in an older building can be extremely rewarding, but that older buildings differ from modern ones. The key is a proper survey and a budget for the unknowns before you offer.

What are the most common problems with old houses?

The common ones are roof and chimney wear, damp, timber decay and pests, structural movement, old wiring, old plumbing and drainage, and past alterations done without permission. Many are fixable, but each one needs a price before you decide what to offer.

What survey do I need for an old house?

In the UK, RICS recommends its most thorough survey, the Level 3 survey, for older buildings. GOV.UK adds that properties built before 1919 are constructed differently, so make sure your surveyor is qualified to assess them. A lender's valuation, if you are borrowing, is not a substitute.

Is damp normal in an old house?

Some moisture movement is normal in older solid-walled buildings, which were built to let walls breathe. Damp becomes a problem when water gets in through the roof, gutters or ground, or when modern materials trap moisture. Ask a surveyor experienced in older buildings to find the cause before anyone sells you a treatment.

Can I make changes to a listed building?

Only with the right consent. Historic England advises checking whether a property is listed or in a conservation area before you buy, and contacting the local authority as soon as possible if you plan alterations. Listing can affect changes inside as well as outside.

How do I find out how old a house is?

Start with the seller, the deeds and the listing entry if there is one, then check maps and local records. Our guide to finding out when your house was built goes through each source step by step.

Sources

  1. Historic England, Thinking of buying an older building? · Published 21 November 2012, checked 18 November 2026
  2. Historic England, Energy efficiency and old houses · Checked 18 November 2026
  3. GOV.UK (Ministry of Housing, Communities and Local Government), How to buy a home · Last updated 6 September 2019, checked 18 November 2026
  4. RICS, House surveys (UK): the costs, types and benefits of an RICS Home Survey · Checked 18 November 2026
  5. Service-Public.fr, Quels sont les diagnostics immobiliers à fournir en cas de vente d'un logement? · Checked by Service-Public.fr 7 March 2025, checked 18 November 2026
  6. Operation Sicily, Episode 9: How much I paid for my villa in Sicily · Checked 18 November 2026
  7. Operation Sicily, Episode 11: Italian building amnesty and my villa · Checked 18 November 2026
  8. Operation Sicily, Episode 57: Testing a cesspit soakaway system · Checked 18 November 2026
  9. Operation Sicily, Episode 59: Removing a kitchen window with failed lintels · Checked 18 November 2026
  10. Operation Sicily, Episode 70: Lime plaster before and after at the abandoned villa · Checked 18 November 2026
  11. Operation Sicily, Traditional lime mortar and Sicilian stonework · Checked 18 November 2026
Jonathan Smith opening the gate of the villa in Sicily

About the author:

Jonathan Smith is the founder of Mekozo and Operation Sicily. Jonathan bought an abandoned villa in Sicily and is rebuilding it on camera, every week. Mekozo is the app Jonathan built to keep that renovation's money in one picture.

Related from Operation SicilyTraditional lime mortar and Sicilian stonework

Real renovation experience and regional guidance from Operation Sicily.

Blog

Related reading

A builder repairing an old brick wall by hand
Planning a renovation

Renovating an old house: what to check and budget for first

An old house rewards patience. Check the structure, roof, damp, services and paperwork before you plan finishes, do the work in the right order, use materials that suit how the house was built and give the unknowns their own budget.

A run-down room with peeling paint, a broken window and a hole in the wall
Choosing a property

Buying a fixer-upper: the real cost before you offer

A house that needs work is only a bargain if the price reflects the work. A step-by-step method to price a fixer-upper before you offer, what to check first and how to decide whether to buy, renovate or walk away.

All Blog posts →

Bring the whole picture home.

Budgets, quotes, payments, documents and decisions in one place

30 days free. No card needed.

Monthly, with no annual plan. The Terms of membership set out the details.