I'm Jonathan Smith. I bought an abandoned villa in Sicily and I'm rebuilding it myself, on camera, every week. Mekozo is the app I built to keep that renovation's money in one picture.
01 / 10Where it began: the iron gates of a villa nobody wanted.
As featured in
My story has been featured across the UK national and regional press.
The receipts
Figures from operationsicily.com, November 2026.
paid for the villa, listed at €100,000
€21,500
empty before I collected the keys
20 years
weekly episodes, filmed by me
92
views on YouTube
8.2M
people following the build
73,700+
Why I film everything
Anyone can say they understand renovation. I'd rather show you.
Every quote, every delivery, every setback and every small win from this villa is on film, one honest episode at a time. You can watch me get it right, and watch me get it wrong. Judge the person building Mekozo by the work, not by a sales page.
“I wanted a challenge. I wanted to learn new things, spend real time outdoors, meet different people, and build something that actually mattered. Moving to Sicily answered all of it at once.”
Jonathan Smith
I'm originally from near Manchester. For over fifteen years I worked in hospitality, and for a long time I loved it. Eventually the routine set in: the same cycle, the same conversations, the same track that someone else had laid out.
The search started online, mostly out of curiosity. I looked at Greece first, then Portugal and Spain. Then Sicily came up and something stopped me. It felt mysterious in a way I hadn't expected, and it still had its own everyday life, away from the crowds.
I looked at the €1 home schemes too, but those houses were gutted, structurally compromised and came with renovation bills far bigger than the price. Then I found the villa.
01
01 · The listing
A villa nobody wanted for five years.
It had been empty for twenty years and on the market at €100,000 for five of them. I offered €20,000, expecting a negotiation. The agent called back the same day: €21,500.
A large detached villa near Mazara del Vallo, with a round stone tower and around 1,000 square metres of land, not far from the sea.
“It's insane and it's a big detached villa. You wouldn't be able to get a garage for that in Manchester.”
Collecting the keys felt like a victory. Walking back in five weeks later felt like something else. The previous owners' furniture was still there from twenty years before.
Every window needed replacing. Every floor. Every pipe. It was a full rebuild, not a renovation in the traditional sense.
“The sheer scale of the work ahead hit me like a ton of bricks. That was the moment I thought: have I completely lost the plot?”
I had no professional building experience. I left school with basic GCSEs. What I had was a tight budget, a willingness to learn and a plan to do as much of the work myself as I could.
The water well, the electrics, the walls, the windows, the terraces, the floors. Some weeks bring a breakthrough. Other weeks, the plumbing wins. I film all of it.
“A finished floor can make a job look straightforward; the episode shows the planning, cuts and mistakes that came first.”
The cuts and the bruises are easy to see. The money isn't.
Quotes arrived in messages. Prices ended up on scraps of paper. Deposits felt like progress, then the extras arrived. Keeping the whole picture together became a job of its own.
So I built the tool I needed: one place for every quote, price, payment and document, so the total is never a surprise. That tool is Mekozo.
“I bought a €21,500 villa in Sicily. I needed to stop it becoming a €200,000 project. Mekozo is the app I built to keep the plans and the money in one picture.”
The villa is where Mekozo was born, and where it works hardest.
I built Mekozo for my own villa renovation here in Sicily. Every quote, price, payment and document from the build goes into it, so I can see the full total at any time, not just the deposit I paid last week.
When a job grows, an extra arrives or the plan changes, it is the first place I look to see what that does to the money. The camera shows the work. Mekozo shows what the work is really costing.
Every quote in one listSide by side, on the same scope, so the cheapest is not the only thing I see.
Estimated, agreed, paid, still to payThe four numbers that keep a €21,500 villa from becoming a €200,000 project.
Documents with the jobReceipts, guarantees and photos kept with the work they belong to.
The family can see it tooInvite the people you are building it for, at no extra cost.
Mekozo's costs screen, shown with an example project.
The house before me
I thought I was starting a renovation. I'd stepped into a story.
From local records and conversations with my neighbours, the villa was built in the late 1960s by a Sicilian farming family: part farmhouse, part modernist experiment, with its curved front, tall tower and sweeping arches. Some time in the 1990s it fell silent. Shutters were rolled down, furniture left in place, documents boxed and stacked.
Among the dust I found a stack of carefully kept letters and certificates. One name kept appearing: Antonia Di Gregorio, born in Mazara del Vallo in 1899, a teacher who spent her life in small village schools, through war and rebuilding. I still don't know exactly how she was connected to the house, but her story has become part of it for me.
“Plates on the sideboard, chairs around the table, clothes, books, photographs, as if somebody had locked the door one day and never come back.”
“Most suppliers don't have websites. A lot of it involves driving around, asking locals, and gradually building up a network of who stocks what and where.”
Jonathan Smith
Quotes, prices and contacts came from everywhere. Mekozo keeps them with the job they belong to.
“You don't need perfect timing, you don't need to be an expert, and you definitely don't need unlimited money. You just need to start.”
Jonathan Smith, founder of Mekozo and Operation Sicily
Who it's for
A home for my boys, and a different kind of childhood.
I have two sons, Hugo and Eithan. The plan is for the whole family to move to Sicily for good once the villa is habitable. One of the reasons behind all of this was giving the boys more time outdoors, learning how things actually work.