Blog

Good decisions begin with a wider view.

Property buying and renovation guides: practical, step-by-step reading for buying, renovating and looking after a home.

Guides by stage

Choosing a propertyViewings, wish lists and comparing homes14 guides →Buying a property you have foundBuying costs, steps, timelines and offers7 guides →Planning a renovationBudgets, estimates, scopes and quotes24 guides →Renovation work underwayPayments, changes and snagging10 guides →Managing your homeRecords, maintenance and home documents9 guides →

All guides

A weathered old house front with shutters and metal doors in an Italian town
Choosing a property

1 euro houses in Italy: what they really cost

A 1 euro house in Italy comes with a deposit, a notary, taxes on the deed, design and permits, and a renovation with a deadline. Every cost heading, a method to budget one, and the official sources to check.

14 min read · 18 November 2026

A question about a renovation and the answer: a rough planning figure to check with your builder
Planning a renovation

AI for home renovation: what it can and cannot do

AI can help you plan a renovation, read a quote, explain a figure and test a what-if. It cannot see your house, price your job reliably or replace a surveyor, builder or registered engineer. How to use it well, and how to check what it tells you.

11 min read · 18 November 2026

A run-down room with peeling paint, a broken window and a hole in the wall
Choosing a property

Buying a fixer-upper: the real cost before you offer

A house that needs work is only a bargain if the price reflects the work. A step-by-step method to price a fixer-upper before you offer, what to check first and how to decide whether to buy, renovate or walk away.

13 min read · 18 November 2026

Appliance warranties: the boiler covered for years, the oven ending soon and the washing machine ended
Managing your home

Appliance manuals and warranties: how to organise them

How to find a lost appliance manual, what to keep for a warranty claim, and a simple way to file every manual and warranty with the item it covers, so the next breakdown starts with the paperwork to hand.

12 min read · 18 November 2026

A newly fitted bathroom with a freestanding bath, a towel rail and a window over the rooftops
Planning a renovation

Bathroom renovation budget: what to allow for, line by line

A bathroom budget covers far more than the suite. Here is every line to allow for, the published UK figures and rules behind them, and how to keep the budget honest once the old bathroom comes out.

13 min read · 18 November 2026

A buying checklist: offer accepted and survey booked ticked, contract still to check
Buying a property

Buying a house checklist: every step from offer to keys

The steps to buying a house, in order, with a checklist for each: getting ready, the offer, the legal work, the survey, exchange, completion and the first weeks after you get the keys.

13 min read · 18 November 2026

An old stone farmhouse with shutters in the French countryside
Choosing a property

Buying a house in France: the costs and steps to plan for

A plain guide to the steps and cost headings of buying a house in France, with the official French and UK sources for each one, so you can plan the whole purchase before you sign anything binding.

16 min read · 18 November 2026

A bathroom checklist: pipes and drains and waterproofing ticked, fan and lighting still to check
Planning a renovation

Bathroom renovation checklist: the order of work, step by step

A bathroom is a small room with a long list of trades in a strict order. The decisions to make before anyone starts, the sequence of work from strip-out to silicone, the checks at each stage and what to collect before the last payment.

12 min read · 18 November 2026

An old stone farmhouse with wooden shutters near Rieti, Italy
Choosing a property

Buying a house in Italy: the costs and steps to plan for

A plain guide to the steps and cost headings of buying a house in Italy, with the official Italian sources and first-hand notes from Jonathan Smith's own purchase on Operation Sicily, so you can plan the whole purchase before you sign anything binding.

15 min read · 18 November 2026

A narrow old street of peach-coloured houses with green shutters in a southern French town
Buying a property

Buying a property abroad: costs and documents under control

Buying abroad means a different legal system, a different language and costs you will not meet at home. The checks to make before you pay anything, every cost to budget, the documents to keep and how to stay in control when you are not there.

13 min read · 18 November 2026

Still have a question?

Tell us what you are trying to do. We will help you find the next step.

Contact support →

Bring the whole picture home.

Budgets, quotes, payments, documents and decisions in one place

30 days free. No card needed.

Monthly, with no annual plan. The Terms of membership set out the details.