Buying a property

Buying a house checklist: every step from offer to keys

The steps to buying a house, in order, with a checklist for each: getting ready, the offer, the legal work, the survey, exchange, completion and the first weeks after you get the keys.

A buying checklist: offer accepted and survey booked ticked, contract still to check
Contents

Key points

  • The home buying process runs in the same order almost everywhere: budget, search, offer, legal work and checks, a binding contract, completion, then moving in.
  • In England and Wales, an accepted offer is subject to contract; the government's How to buy a home guide says to instruct a legal representative as soon as your offer is accepted.
  • A lender's valuation is not a survey: GOV.UK says it does not protect you if something goes wrong with the property.
  • If a survey finds significant issues, GOV.UK says you can ask the seller to fix them, renegotiate or withdraw your offer.
  • Keep every cost, document and date in one place from the first viewing, so nothing is missed at exchange or completion.

What are the steps to buying a house?

The steps to buying a house are: set your budget and gather documents, search and view, make an offer, instruct a solicitor, arrange funding, get a survey, let the legal work and searches run, review the results, exchange contracts, complete and collect the keys, then move in and update your records. Each step has its own checklist.

This guide takes you through the home buying process in order, with a checklist at every step. The method works anywhere; where the rules differ by country, they sit in labelled boxes. For how long each stage usually takes, see our guide to how long it takes to buy a house.

The home buying process at a glance

StepWhat happensWho is involved
1. Get readyBudget, full costs, documents, fundingYou, any lender or adviser
2. Search and viewWish list, viewings, notes, comparisonsYou, estate agents
3. Make an offerOffer, negotiation, acceptanceYou, the agent, the seller
4. Instruct a legal representativeSolicitor, conveyancer, notary or lawyerYou, your legal representative
5. Arrange fundingSavings, sale proceeds, any borrowing confirmedYou, any lender
6. Legal workSearches, property information, questionsBoth legal representatives
7. Survey or inspectionCondition of the homeYou, a surveyor or inspector
8. Review and decideFindings, costs, renegotiationYou, your legal representative
9. Binding contractExchange of contracts or signingBoth sides
10. CompletionMoney paid, keys releasedBoth legal representatives, the agent
11. Move inMeters, locks, insurance, address changesYou
12. After the moveRegistration, taxes, keeping the recordsYour legal representative, you

Know what you can spend in total, not just on the price. Our guide to the costs of buying a house lists every cost beside the price.

  • Total budget: price plus buying costs, moving and any early repairs
  • Where the money is coming from: savings, a sale, any borrowing
  • If you are borrowing, get advice from a qualified adviser before you view
  • Documents gathered (see below)
  • A wish list of must-haves and nice-to-haves

In the UK (England and Wales)

The government's How to buy a home guide says to get your documents together early: proof of identity such as a passport or driving licence, proof of address such as a bank statement or utility bill no more than 3 months old, and proof of the source of your funds, such as your last 3 months' payslips or tax returns if you are self-employed.

Step 2: search and view

Use the same checklist at every viewing so you can compare homes fairly. Our guide to questions to ask when viewing a house has a full viewing checklist, and our guide to comparing houses shows how to weigh them against your wish list.

  • Viewing notes and photos for every home
  • Questions to the agent: how long on the market, why the seller is moving, is there a chain
  • Questions about past work: have the necessary consents been obtained?
  • A second viewing at a different time of day
  • A rough cost of any work the home needs, before you offer

Tip

The government's guide suggests asking the agent for the material facts about the property, how long it has been on the market and, if more than 3 months, why they think it is not selling.

Step 3: make an offer

Base your offer on what the home is worth to you once every cost is counted. Our guide to how much to offer on a house covers how to set and justify a figure.

  • Offer made in writing, with any conditions stated
  • Your position explained: chain-free, sale agreed, funding ready
  • Acceptance confirmed in writing by the agent
  • Ask that the home is taken off the market

In the UK (England and Wales)

An accepted offer is "subject to contract": either side can still withdraw until contracts are exchanged. The government's guide mentions that some sellers will enter a reservation agreement to show they are committed.

In Scotland

The process and timing of offers are different, with legal steps that can bind sooner. See mygov.scot on making an offer, and note that RICS says sellers in Scotland must provide a Home Report.

  • Solicitor, licensed conveyancer, notary or lawyer chosen
  • Written quote with fees, VAT and disbursements
  • Their client care letter and identity checks completed
  • Details of the seller's legal representative passed on

In the UK (England and Wales)

The government's guide says to instruct a legal representative as soon as your offer has been accepted, and, if you have special requirements such as running a business from home, to ask them to check before you make your offer.

Step 5: arrange your funding

  • Funds confirmed and ready for the deposit and completion
  • Any borrowing confirmed, with a qualified adviser
  • Dates when each payment is due written down

Watch out

A lender's valuation is not a survey. The government's guide says a valuation does not protect you if something goes wrong with the property, and may not even include a physical inspection.

Costs & spending in Mekozo, close up: whole project £8,300 plus one unpriced item, paid £2,000, still to pay £3,500, £12,000 in the plan

Mekozo's Costs & spending view adds every buying cost to one total and shows what is already paid, what is still to pay and what has no price yet.

Try it free for 30 days, no card needed

This is usually the longest stage. Your legal representative checks the title, orders searches and raises questions with the seller's side.

  • Searches ordered (the government's guide says local authority searches are organised by your legal professional)
  • Seller's property information forms received
  • Questions raised about anything unclear: boundaries, past work, certificates
  • Leasehold details checked if it is a flat or leasehold house: lease length, service charge, ground rent
  • Your own questions sent through your legal representative, in writing

Keep a list of every question and its answer. It saves time later and is useful when you sell.

Step 7: get a survey or home inspection

A survey (called a home inspection in the US and Canada) tells you about the home's condition. Our house survey checklist explains what one covers, what it leaves out and how to act on the report.

  • The right level of survey or inspection booked for the home and your plans
  • Specialist tests booked if needed: electrics, gas, drains, structure
  • Report read and every finding listed with its urgency
  • Quotes obtained for anything serious

In the UK

The government's guide says you should strongly consider having a survey, carried out by a trained professional such as a member of RICS, which explains the three levels of RICS Home Survey. It says that if significant issues are found, you can ask the seller to fix them before you buy, renegotiate your offer to take account of the cost, or withdraw your offer.

Step 8: review everything and decide

Before you commit, put the results of steps 5 to 7 side by side.

  • Search results and legal report reviewed with your legal representative
  • Survey findings and repair quotes added to your total cost
  • Any renegotiation agreed in writing
  • Insurance arranged to start when you become responsible for the home
  • Completion date discussed with the seller and any chain
  • Removals provisionally booked for that date

Step 9: exchange contracts or sign the binding contract

  • Contract read and signed
  • Deposit transferred to your legal representative in good time
  • Completion date fixed
  • Removals confirmed

In the UK (England and Wales)

Once contracts are exchanged, the sale is legally binding and the completion date is fixed. If you are buying a new build, the government's guide warns that many developers ask you to exchange and pay a deposit by a deadline, so make sure your lender and legal representative can meet it.

In Italy

The purchase is completed by a deed signed in front of a notary, and the notaries' council explains the steps, from purchase proposal and preliminary contract to the deed, and the taxes on the purchase. The buying a house in Sicily checklist by Mekozo's founder, Jonathan Smith, who films his villa renovation on Operation Sicily, goes through each stage from his own purchase.

Step 10: completion and the keys

  • Final statement from your legal representative checked
  • Balance of funds transferred in time
  • Confirmation that completion has happened
  • Keys collected
  • Meter readings taken and photographed

Step 11: moving in

Our moving house checklist covers the move itself, and our guide to moving in covers the first weeks after. On the day and in the first week:

  • Change the locks if you want to be sure who has keys, as the government's guide suggests
  • Tell the council for council tax and move your electoral roll registration
  • Update your address with banks, employers and others
  • Find the stopcock, fuse box and meters
  • Note anything the seller has left or taken that differs from what was agreed

Step 12: after the move

In the UK (England and Wales)

The government's guide says that after the move your legal representative registers the change of ownership with HM Land Registry and settles other payments, including Stamp Duty Land Tax in England or Land Transaction Tax in Wales.

  • Confirmation of registration received
  • Every buying document filed: contract, transfer, searches, survey, certificates, guarantees
  • Final buying costs recorded against your budget
  • A home record started for the house: what you bought, its condition and any work planned

Our guide to keeping a home record explains what to keep and why buyers value it when you sell.

On the Operation Sicily villa

From the villa in Sicily. Jonathan's own purchase followed the same steps, in Italian form. He spent three months on the search with more than 50 viewings, and walked away from two deals when the documents and plans revealed problems the sellers had not mentioned (Episode 8). The villa he chose was advertised at €100,000; he bought it for €21,500, and the notary (€1,500), the estate agent (€1,500) and the taxes (€4,500) came on top (Episode 9). His Italian tax code, the codice fiscale, had to be in place before the purchase, and it took under six weeks from agreeing the price to signing the final deed at the notary. Keeping the costs, documents and steps of a purchase like this in one place is exactly what the checklist above is for.

Playing loads YouTube’s external player.

Watch directly on YouTube ↗

Buying a house checklist: the short version

  • Budget, full costs and documents ready
  • Homes viewed and compared with the same checklist
  • Offer made in writing and accepted
  • Legal representative instructed
  • Funding confirmed
  • Searches and legal questions answered
  • Survey or home inspection done and findings priced
  • Everything reviewed, any renegotiation agreed
  • Contracts exchanged or binding contract signed
  • Completion, keys and meter readings
  • Moved in, address changes made
  • Registration confirmed and documents filed

For the earlier stages, see our house hunting checklist, and for everything after you have found a home, our guide to the legal work, survey and completion. To keep every cost of the purchase together, see how Mekozo keeps every buying cost in one list.

This guide explains the usual steps in plain terms. It is not legal or financial advice; your legal representative will tell you exactly what applies to your purchase.

Questions people ask

How long does buying a house take?

It depends on the chain, the legal work, the survey and any borrowing, so plan in months rather than weeks from an accepted offer to completion, on top of the time spent searching. The legal work between offer and exchange usually takes longest. Our guide to how long it takes to buy a house breaks down each stage.

What documents do I need to buy a house?

GOV.UK's How to buy a home guide lists proof of identity such as a passport or driving licence, proof of address such as a recent bank statement or utility bill, and proof of where your money is coming from, such as recent payslips or tax returns. Your solicitor and any lender will tell you exactly what they need.

When should I get a solicitor when buying a house?

The government's guide says to instruct a legal representative as soon as your offer has been accepted. If you have special requirements, such as wanting to run a business from home, it suggests asking them to check these before you make your offer.

Do I need a survey to buy a house?

A survey is not a legal requirement in England and Wales, but GOV.UK says you should strongly consider one, because a lender's valuation is not a survey and does not protect you if something goes wrong. In Scotland, RICS notes that sellers must provide a Home Report.

What happens on completion day?

The money is transferred to the seller's solicitor, the sale completes and the keys are released, usually through the estate agent. Afterwards, the government's guide says your legal representative registers the change of ownership with HM Land Registry and settles other payments, such as Stamp Duty Land Tax in England.

What should I do after buying a house?

Read the meters, change the locks if you want to be sure who has keys, tell the council for council tax and the electoral roll, update your address with banks and others, and set up insurance. Then keep the purchase documents together, because you will need them again when you renovate or sell.

Sources

  1. GOV.UK (Ministry of Housing, Communities and Local Government), How to buy a home · Last updated 6 September 2019, checked 18 November 2026
  2. RICS, House surveys (UK): the costs, types and benefits of an RICS Home Survey · Checked 18 November 2026
  3. mygov.scot, Making an offer (Buying a home: the legal process) · Checked 18 November 2026
  4. Consiglio Nazionale del Notariato, Buying a home · Checked 18 November 2026
  5. Operation Sicily, Episode 8: Why I bought a villa in Trapani, Sicily · Checked 18 November 2026
  6. Operation Sicily, Episode 9: How much I paid for my villa in Sicily · Checked 18 November 2026
  7. Operation Sicily, The real timeline of a Sicilian villa renovation · Checked 18 November 2026
  8. Operation Sicily, Buying a house in Sicily checklist · Checked 18 November 2026
Jonathan Smith opening the gate of the villa in Sicily

About the author:

Jonathan Smith is the founder of Mekozo and Operation Sicily. Jonathan bought an abandoned villa in Sicily and is rebuilding it on camera, every week. Mekozo is the app Jonathan built to keep that renovation's money in one picture.

Related from Operation SicilyBuying a house in Sicily checklist

Real renovation experience and regional guidance from Operation Sicily.

Blog

Related reading

All Blog posts →

Bring the whole picture home.

Budgets, quotes, payments, documents and decisions in one place

30 days free. No card needed.

Monthly, with no annual plan. The Terms of membership set out the details.