Buying a property

Moving house checklist, and what moving really costs

Everything to do before, on and after moving day, week by week, and what the move itself costs in the UK: removals, packing, storage and the overlap between two homes.

Packed moving boxes stacked by a window in an empty room
Contents

Key points

  • Start a moving house checklist about eight weeks before moving day: book removals, sort and pack room by room, and plan who to tell.
  • Which? removals quotes collected in May 2026 for a 12 mile move within London ran from £540 for a one-bedroom flat to £1,553 for a four-bedroom house.
  • Keep removals bookings flexible until the completion date is fixed, because it can move.
  • On moving day, read the meters at both homes and give the readings to your suppliers.
  • In the first week, test the alarms, update your address and start a record of the house.

A moving house checklist starts about eight weeks before moving day: book removals, pack room by room, tell everyone your new address, and plan the day down to meter readings and keys. Moving costs more than the van: packing, storage, the overlap between two homes and the first week's spending all add up.

This guide gives you the checklist week by week, then the costs line by line, so the move and the budget are planned together.

Moving house checklist: eight weeks to go

As soon as you have an accepted offer and a likely completion date:

  • Get removals quotes, or price van hire if you have little to move
  • Decide whether you want packing done for you
  • Check notice periods on anything you need to end: tenancy, broadband, contracts
  • Start sorting: keep, sell, give away, recycle
  • Measure large furniture and the doors and stairs at the new home
  • Start a list of everyone who needs your new address
  • Put every moving cost on one list, with a status for each

Our guide to how long it takes to buy a house explains why the completion date can move, so keep removals bookings as flexible as you can until dates are fixed.

Watch out

A moving date is not certain until buyer and seller have agreed it and it is fixed in the contract. Booking removals for a date that has not been agreed can mean paying to change it.

Four weeks to go

  • Confirm removals for the agreed date, in writing
  • Book time off work for moving day and the day after
  • Arrange childcare and pet care for the day
  • Order boxes, tape and labels, or confirm the packing service
  • Pack rooms and items you will not need before the move
  • Use up food in the freezer
  • Arrange broadband at the new home

Two weeks to go

  • Tell your energy and water suppliers your moving date
  • Tell both councils for council tax: the one you are leaving and the new one
  • Update your bank, cards, employer, GP, dentist and insurers
  • Arrange post redirection
  • Check buildings and contents insurance start on the right day
  • Return anything borrowed, collect anything lent

The week before

  • Pack everything except an essentials box
  • Label boxes by room at the new home, not the old one
  • Defrost the freezer if it is moving
  • Confirm key collection with your conveyancer or agent
  • Confirm timings and parking with the removals company
  • Charge phones and keep chargers in the essentials box

Moving day

  1. Read the meters at the old home and photograph them.
  2. Walk every room, cupboard and loft before the van leaves.
  3. Leave keys and manuals as agreed with the buyer or agent.
  4. Collect keys for the new home once completion is confirmed.
  5. Read the meters at the new home and photograph them.
  6. Check the stop valve, fuse box and boiler are where you expect.
  7. Unpack the essentials box and make the beds first.

In the UK (England)

Citizens Advice says to give your electricity and gas supplier at least 48 hours' notice before you move, read your meters on the day you move out and give the readings to your supplier, and give a forwarding address for the final bill, which you will have 28 days to pay. At the new home, contact the current supplier and give them meter readings from the day you move in. If the new home has a prepayment meter, contact the supplier straight away and try not to top it up until you have, so you do not pay off a previous occupant's debt. Advice differs in Scotland, Wales and Northern Ireland.

The first week in the new home

  • Confirm every supplier has your move-in readings
  • Register with a GP and dentist if you have moved area
  • Update the address on your driving licence and vehicle log book
  • Register to vote at the new address
  • Test smoke and carbon monoxide alarms
  • Find out bin collection days
  • Start a record of the house: manuals, warranties, certificates and meter readings

In the UK (Great Britain)

GOV.UK says it does not cost anything to change the address on your driving licence, that you must also change the address on your vehicle log book (V5C), and that you can be fined up to £1,000 if you do not tell DVLA when your address changes. Northern Ireland has a different process.

For everything else to do in the first week, see our new home checklist. Our guide to keeping a useful home record shows how to start that record on day one, and our home maintenance checklist gives you the first checks to put in it.

What moving really costs

Costs & spending in Mekozo, close up: whole project £8,300 plus one unpriced item, paid £2,000, still to pay £3,500, £12,000 in the plan

Mekozo's Costs & spending view adds every moving and buying cost to one total and shows what is paid and what is still to pay as completion day gets closer.

Try it free for 30 days, no card needed

The van is the cost people picture, and the buying costs behind the move, such as tax, legal fees, the survey and any estate agent, are usually far larger; our guide to the costs of buying a house covers them line by line. This section covers the move itself.

Removals and packing

Which? collected removals quotes in May 2026 for a move in July 2026 to an equal-sized property 12 miles away within London:

PropertyHiring a vanRemovals companyWith packing by the removals company
One-bedroom flat (ground floor)£91£540£899
Two-bedroom house£75£779£1,220
Three-bedroom houseNot recommended£1,409£2,075
Four-bedroom houseNot recommended£1,553£2,307

Van hire prices were for a 12-hour same-day hire in London. Prices vary by location, distance, how much you own and whether you need packing, so treat these as a guide and get quotes for your own move.

The costs people forget

  • Lender fees, if borrowing.
  • Overlap costs. Two homes' bills, or rent, for a few days or weeks.
  • Storage. If the dates do not line up.
  • Time off work. Moving day and the day after.
  • Cleaning. The home you leave and the one you arrive in.
  • First-week spending. Takeaways, curtains, light bulbs, keys cut, a new lock.
  • Work on the new home. Anything that cannot wait, such as a boiler or electrics found faulty.

Tip

Give every moving cost a status: estimate, quote, agreed price or paid. A list of estimates looks smaller than it is; a list of quotes and payments tells you what is really left to find before completion.

A moving budget, line by line

LineFigureStatus
Buying costs (tax, legal fees, survey, any agent)From our guide to the costs of buying a houseEstimate
Lender fees, if borrowingFrom your lenderQuote
Removals and packingFrom the removals companyQuote
StorageIf neededEstimate
Overlap costsYour bills times the overlapEstimate
First-week spendingYour estimateEstimate
Urgent work on the new homeFrom a trade, if knownUnknown

Watch out

A line marked "unknown" is not zero. Keep it in the total until you have a figure.

On the Operation Sicily villa

From the villa in Sicily. When Mekozo's founder, Jonathan Smith, moved from the UK to Sicily, the move did not line up neatly with the house he was renovating. He had hoped to be living in the villa by Christmas, but delays pushed that back by months, and his advice on Operation Sicily, where he films the villa renovation, is to plan where you will live in the meantime (Moving to Sicily in 2026). In the same guide, he lists the one-time costs of relocating that sit on top of monthly living costs: visa application fees and documents, removal or shipping, temporary accommodation during the transition, setting up utilities in a new property, and vehicle registration or purchase. A move abroad adds lines, but the lesson carries to any move: the gap between leaving one home and living in the next has its own costs, and they belong on the list from the start. The short film moving from the UK to Sicily to restore a villa is where his story begins.

Playing loads YouTube’s external player.

Watch directly on YouTube ↗

Moving house checklist: the short version

  • Removals quoted and booked once the date is fixed
  • Sorting and packing started eight weeks out
  • Every moving and buying cost on one list, with a status
  • Suppliers, councils, bank, employer, GP and DVLA told
  • Meters read and photographed at both homes
  • Keys, manuals and paperwork handed over and collected
  • A record of the new home started in the first week

For the whole buying stage, see our guide to buying a home, from offer to moving day, our guide to how long it takes to buy a house, our buying a house checklist for every step from offer to keys, and the costs of buying a house. Mekozo keeps the new home's warranties, manuals and paperwork together from the day you move in; before then, see how to build a whole-project budget with every moving and buying cost in one list.

This guide explains a moving method. Figures are published averages, not quotes, and nothing here is legal, tax or financial advice.

Questions people ask

How much does it cost to move house in the UK?

The move itself is removals, packing, any storage and the overlap of bills between two homes. Which? collected removals company quotes in May 2026 for a 12 mile move within London in July 2026: £540 for a ground floor one-bedroom flat, £779 for a two-bedroom house, £1,409 for three bedrooms and £1,553 for four. The buying costs behind the move, such as tax and legal fees, are a separate list.

How much does packing cost when moving house?

In the same Which? quotes, adding packing by the removals company took the price to £899 for a one-bedroom flat, £1,220 for a two-bedroom house, £2,075 for three bedrooms and £2,307 for four. Prices vary by location, distance and how much you own, so get quotes for your own move.

When should I start planning a house move?

Start as soon as you have an accepted offer, and firm up once you have a likely completion date. Book removals, give notice on anything you need to end, and start sorting and packing about eight weeks out, then work down the list week by week.

Who do I need to tell when I move house?

Your energy and water suppliers, both councils for council tax, your bank and card providers, employer, GP and dentist, insurers, broadband and phone providers, and DVLA for your driving licence and vehicle log book. In Great Britain, GOV.UK says it costs nothing to change the address on your driving licence.

What should I do with the energy meters on moving day?

Citizens Advice says to give your supplier at least 48 hours' notice, read the meters on the day you move out and give the readings to your supplier, and give a forwarding address for the final bill. At the new home, read the meters on the day you move in and contact the current supplier.

Sources

  1. Which?, The cost of buying a house (removals and van prices May 2026) · 28 May 2026
  2. Citizens Advice, Moving home: dealing with your energy supply (England) · Checked 18 November 2026
  3. GOV.UK, Change the address on your driving licence · Checked 18 November 2026
  4. Operation Sicily, Moving to Sicily in 2026: the honest pros, cons and costs · Checked 18 November 2026
  5. Operation Sicily, Moving from the UK to Sicily to restore a villa · Checked 18 November 2026
Jonathan Smith opening the gate of the villa in Sicily

About the author:

Jonathan Smith is the founder of Mekozo and Operation Sicily. Jonathan bought an abandoned villa in Sicily and is rebuilding it on camera, every week. Mekozo is the app Jonathan built to keep that renovation's money in one picture.

Related from Operation SicilyMoving to Sicily in 2026: the honest pros, cons and costs

Real renovation experience and regional guidance from Operation Sicily.

Blog

Related reading

All Blog posts →

Bring the whole picture home.

Budgets, quotes, payments, documents and decisions in one place

30 days free. No card needed.

Monthly, with no annual plan. The Terms of membership set out the details.