Bathroom renovation budget: what to allow for, line by line

A bathroom budget covers far more than the suite. Here is every line to allow for, the published UK figures and rules behind them, and how to keep the budget honest once the old bathroom comes out.

A newly fitted bathroom with a freestanding bath, a towel rail and a window over the rooftops
Contents

Key points

  • A bathroom budget covers far more than the suite: strip out, shower, taps, tiling, flooring, plumbing, electrics, ventilation, fitting, waste, living costs and a contingency.
  • Which? says a basic bath, sink and toilet from a DIY store costs around £300, while a higher-end suite can cost well into the thousands, before fitting, tiling or decorating.
  • Moving the toilet, bath or shower adds cost, because the supplies and waste pipe move too; a wet room needs waterproofing and may need new drainage.
  • In England, electrical work around a bath or shower is notifiable under Approved Document P unless a competent person scheme electrician self-certifies it.
  • Mark every line as estimate, quote, agreed price or paid, and test pipework before it is tiled over.

A bathroom renovation budget covers far more than the bath, basin and toilet: shower, taps, tiling, flooring, plumbing, electrics, ventilation, fitting, waste and a contingency. Which? says a basic DIY store suite costs around £300 and a higher-end one well into the thousands, before any installation. List every line, price it, then add a contingency.

This guide answers how much a new bathroom costs, gives you the full list of lines with the published UK figures and rules behind them, and shows how to keep the budget honest once the old bathroom comes out.

How much does a new bathroom cost?

How much it costs to renovate a bathroom depends on four things, and Which? figures show where each one moves the total (Which?, December 2025; Which?, January 2026):

  1. The suite and fittings: around £300 for a basic bath, sink and toilet from a DIY store, and well into the thousands for a higher-end suite from a specialist.
  2. The size of the room: Which? and the Building Cost Information Service (BCIS) price a new bathroom separately for a terraced bathroom of about 3.5m², a semi-detached of about 4m² and a detached of about 6.5m².
  3. The layout: moving the plumbing or the waste pipe adds cost compared with fitting a new suite in the same positions.
  4. The trades: tilers, electricians and, for a wet room, a builder for waterproofing and drainage all add their own lines.

So a price for a new bathroom only means something once you know which of these it covers. The rest of this guide builds your own figure line by line.

Bathroom renovation budget: every line to include

LineWhat it coversOften missed
Strip outRemoving the old suite, tiles and flooringRepairs to walls and floor underneath
SuiteBath, basin, toiletWall-hung toilet frame and false wall
ShowerValve, head, enclosure or screen, trayPump or electric shower supply
Taps and wastesBasin and bath taps, wastes, trapsRecessed valves need precise setting
FurnitureVanity unit, cabinets, mirrorFixings and worktop
TilingWall and floor tiles, adhesive, grout, trimsPreparation, tile levelling, sealant
FlooringTiles, vinyl or other finishLevelling or replacing boards
PlumbingHot and cold supplies, waste pipesMoving the toilet waste or soil pipe
HeatingRadiator or heated towel railUnderfloor heating and its controls
ElectricsLighting, shaver socket, fan, shower circuitNotification and certificate
VentilationExtractor fan and ducting to outsideDrilling through a solid wall
Walls and ceilingPlastering, boarding, paintingMoisture-resistant board
WasteSkip or waste removalDisposing of the old suite
Living costsUsing another bathroom, or going withoutWeeks longer than planned
ContingencyUnknownsEverything above

Step 1: decide the scope before you price it

The biggest cost driver is how much you change. Write down which of these applies:

  • Refresh. Same suite, new taps, regrouting, paint, lighting.
  • Like for like. New suite in the same positions, new tiles and flooring.
  • New layout. The toilet, bath or shower moves, so the pipes and waste move too.
  • Wet room or structural change. Waterproofing, floor falls, new drainage or a wall moved.

Which? says that moving plumbing or your waste pipe will add to the cost compared with installing a new suite and toilet in the same position as the current ones (Which?, January 2026). It adds that a heavy, luxury bath might need a reinforced floor, and that converting a bathroom into a wet room will need waterproofing and might need new drainage, which usually means a builder as well as a plumber.

Watch out

A wall-hung toilet hides its frame and pipes behind a false wall. Which? notes that the false wall slightly changes the shape of the room and can be more disruptive to install. Price the frame, the wall and the extra labour as their own lines.

Our guide to writing a renovation scope shows how to describe the job so every quote covers the same work.

Step 2: price each line

The suite and fittings

Start with the items you choose. A basic bath, sink and toilet from a DIY store costs around £300, Which? says, and a higher-end suite from a specialist bathroom company can cost well into the thousands. Stone tiles, underfloor heating, new lighting, designer heated towel rails, natural stone baths and glass basins all raise the price, while standard fittings such as acrylic baths and basic electric showers keep costs down.

Price each fitting by model, not by type. "A shower" can mean a simple electric unit or a set of recessed valves with a fixed head and a hand shower, and the fitting time differs as much as the price.

Fitting and labour

Which? worked with the Building Cost Information Service (BCIS) to publish typical price ranges for a new bathroom by size: a terraced house bathroom of about 3.5m², a semi-detached of about 4m² and a detached of about 6.5m². Those ranges include removing the existing bathroom, installing a bath, basin, WC and vanity unit, fittings, flooring, wall tiling and decoration (Which?, December 2025). The figures sit behind a Which? membership, but the list of what they include is a useful checklist for your own quotes.

Which? lists the things that change what fitting costs:

  • where you live
  • the age and condition of the property
  • ease of access to the plumbing
  • how long the job takes
  • the quality of fittings and fixtures
  • whether the fitter is disposing of waste
  • whether tilers, electricians or other specialists are needed

It suggests getting at least three quotes if the company you bought the bathroom from is not fitting it, and asking fitters to break their quotes down.

Tip

In a September 2023 Which? survey of 1,129 members who had bought a bathroom suite or furniture in the previous ten years, the most common ways people had tried to cut costs were finding their own fitter (31%), sourcing components themselves (26%), buying components from different stores (20%), negotiating (19%) and finding alternatives to expensive materials (7%). If you supply items yourself, make sure the fitter's quote says so, and that delivery dates suit the fitting schedule.

Electrics and ventilation

Bathrooms are where electrical rules are strictest, so give the electrics their own line rather than folding them into "fitting". Which? also suggests adding or upgrading an extractor fan while renovating, to reduce moisture and condensation.

In the UK (England)

Under Approved Document P (2013 edition), electrical work is notifiable if it is the installation of a new circuit, the replacement of a consumer unit, or any addition or alteration to existing circuits in a special location. In a room with a bath or shower, the special location is the space up to 2.25 metres above the floor and within 0.6 metres of the edge of the bath or shower tray, or within 1.2 metres of the shower head where there is no tray. Work by an electrician registered with a competent person scheme can be self-certified; otherwise it is certified by a registered third party or a building control body. Wales, Scotland and Northern Ireland have their own rules, as do other countries.

Step 3: turn the list into a budget with contingency

Costs & spending in Mekozo, close up: whole project £8,300 plus one unpriced item, paid £2,000, still to pay £3,500, £12,000 in the plan

Mekozo's Costs & spending view shows the bathroom's costs so far, what is paid, what is agreed but still to pay, any line not yet priced, and the money in your plan, contingency included.

Try it free for 30 days, no card needed

Once every line has a figure, mark how solid it is:

  1. Estimate. Your own guess or a published figure.
  2. Quote. A written price for that line from a supplier or trade.
  3. Agreed. A quote you have accepted.
  4. Paid. Money that has gone.

Then add a contingency for the unknowns: what is behind the old tiles, the state of the floor and the pipes, and anything not yet decided. Our guide to renovation contingency shows how to size it from your own risks rather than a guess.

Tip

A quote for "supply and fit bathroom" is not a budget. Citizens Advice suggests a quote should have a fixed total price rather than a daily rate, a breakdown of the work and materials, separate costs for each part, how long the price is valid, whether it includes VAT and when the price can go up. Our guide to comparing quotes on the same scope shows how to line them up.

Worked example: a bathroom budget line by line

This shows the structure, not a recommended spend. Replace every figure with your own quotes.

LineFigureStatus
Strip out and wasteFrom fitterQuote
Bath, basin, toiletYour chosen modelsEstimate
Shower valve, head and screenYour chosen modelsEstimate
Taps and wastesYour chosen modelsEstimate
Vanity unit and mirrorYour choiceEstimate
Wall and floor tilesArea plus waste allowanceQuote
PlumbingFrom plumber, for the new layoutQuote
Electrics, fan and certificateFrom electricianQuote
Towel rail or radiatorYour choice plus fittingEstimate
Tiling labourFrom tilerQuote
Plastering and decoratingFrom tradesEstimate
Floor repairsAfter strip outUnknown
ContingencySized from your risksSet aside

Watch out

A line marked "unknown" is not zero. Leave it visible in the total until you have a figure.

Keeping a bathroom renovation on budget

  • Keep the layout so the waste and supplies stay where they are.
  • Fix every fitting before you get quotes, including valve types and tile sizes.
  • Set out valves and wastes against the finished surface, not the bare wall.
  • Test before you cover. Pipework that is pressure tested before tiling is cheaper to fix than pipework behind finished tiles.
  • Separate upgrades from unknowns. A better shower is a choice to price, not a call on the contingency.
  • Record each order and payment the day it happens, keeping the agreed price, invoices and payments apart. An invoice is the bill for agreed work; record it, then the payment against it.

Use the bathroom renovation checklist to put the jobs in order.

On the Operation Sicily villa

From the villa in Sicily. The bathroom at the villa Mekozo's founder, Jonathan Smith, films for Operation Sicily shows how much of a bathroom budget sits inside the walls. Every valve is recessed: the shower, the shower head, the bath taps, the basin taps and a bidet spray, because the geometra needed either a bidet or a bidet spray to sign the bathroom off. To set each valve at the right depth for the finished tiles, Jonathan made a mock tile from the dimensions of the tiles already ordered, then flushed all the new pipework and held it under pressure before the chases were filled (Episode 79). The extractor fan needed its own hole core drilled through the wall (Episode 50). The vanity unit became a line of its own: the wooden units he liked were around €1,200, so he built one from stone blocks instead. The same episode shows why a contingency matters. A toilet waste pipe meant to sit 25cm from the finished wall had been laid at 35cm, so it was capped off and tiled over, with a new route planned out through the external wall (Episode 90). His real-world breakdown of renovation costs in Sicily covers costs for an Italian project.

Playing loads YouTube’s external player.

Watch directly on YouTube ↗

Bathroom budget checklist

  • Scope written: refresh, like for like, new layout or wet room
  • Every line from the table above priced or marked unknown
  • Fittings priced by model, not by type
  • Fitting quotes broken down the same way
  • Plumbing priced for the new layout
  • Electrics and ventilation priced separately, with notification checked
  • Contingency sized from your own risks
  • Every order and payment recorded as it happens

For the wider plan, see our guide to getting quotes and setting a renovation budget, our guide to the kitchen renovation budget and how to compare builders' quotes. To keep the bathroom inside a whole-house budget, see the renovation budget tracker and how to build a whole-project budget in Mekozo.

This guide explains a budgeting method. Figures are published guides and starting prices, not quotes; get written prices for your own bathroom.

Questions people ask

How much does a new bathroom cost in the UK?

There is no single figure: the size, the layout and the fittings drive the total. Build it from your own list rather than one figure: suite, shower, taps, furniture, tiling, flooring, plumbing, electrics, ventilation, fitting, waste removal and a contingency. As a very rough guide, Which? says a basic bath, sink and toilet from a DIY store costs around £300, while a higher-end suite can cost well into the thousands, before installation, tiling or decorating.

What makes a bathroom renovation more expensive?

Which? lists where you live, the age and condition of the property, access to the plumbing, how long the job takes, the quality of fittings, waste disposal and whether tilers or electricians are needed. Moving the plumbing or the waste pipe adds cost compared with keeping the suite where it is.

What hidden costs are there in a bathroom renovation?

Most sit behind the old tiles and under the floor: rotten boards, old pipework, a waste pipe in the wrong place or wiring that needs bringing up to standard. Waste removal, making good walls and ceilings, and managing without a bathroom while the work is done also catch people out. Hold a contingency for them, priced separately from any upgrades.

How can I keep a small bathroom renovation on a budget?

Keep the bath, basin and toilet where they are so the pipes and waste stay put, choose standard fittings where they do the job, decide every item before you ask for quotes, and get quotes broken down so you can compare them like for like. Track every order and payment as it happens.

Is a wet room more expensive than a standard bathroom?

It can be. Which? says converting a bathroom into a wet room needs waterproofing and might need new drainage, which usually means a builder as well as a plumber. Price the waterproofing, floor falls and drainage as separate lines.

Sources

  1. Which?, How much does a new bathroom cost in 2026? (BCIS data; member survey September 2023) · 31 December 2025
  2. Which?, 6 things you should know when redoing your bathroom · 13 January 2026
  3. GOV.UK, Electrical safety: Approved Document P (England, 2013 edition) · Checked 18 November 2026
  4. Citizens Advice, Before you get work done on your home (England) · Checked 18 November 2026
  5. Operation Sicily, Episode 79: Fitting recessed shower valves and pressure testing · Checked 18 November 2026
  6. Operation Sicily, Episode 90: Sealing an exposed limestone wall and a DIY vanity unit · Checked 18 November 2026
  7. Operation Sicily, Episode 50: Core drilling for a bathroom extractor fan · Checked 18 November 2026
Jonathan Smith opening the gate of the villa in Sicily

About the author:

Jonathan Smith is the founder of Mekozo and Operation Sicily. Jonathan bought an abandoned villa in Sicily and is rebuilding it on camera, every week. Mekozo is the app Jonathan built to keep that renovation's money in one picture.

Related from Operation SicilyHow much does it really cost to renovate a house in Sicily? (2026 real-world breakdown)

Real renovation experience and regional guidance from Operation Sicily.

Blog

Related reading

A question about a renovation and the answer: a rough planning figure to check with your builder
Planning a renovation

AI for home renovation: what it can and cannot do

AI can help you plan a renovation, read a quote, explain a figure and test a what-if. It cannot see your house, price your job reliably or replace a surveyor, builder or registered engineer. How to use it well, and how to check what it tells you.

A bathroom checklist: pipes and drains and waterproofing ticked, fan and lighting still to check
Planning a renovation

Bathroom renovation checklist: the order of work, step by step

A bathroom is a small room with a long list of trades in a strict order. The decisions to make before anyone starts, the sequence of work from strip-out to silicone, the checks at each stage and what to collect before the last payment.

A room under renovation with the wall opened up to show new wiring and pipes
Planning a renovation

Cost to rewire a house: what to budget and what to expect

A full rewire is priced by the size of the house, but the bill depends on access, the condition of the walls and what you add. Published figures, the extras to price separately and how to budget the job, including the plastering and decorating afterwards.

All Blog posts →

Bring the whole picture home.

Budgets, quotes, payments, documents and decisions in one place

30 days free. No card needed.

Monthly, with no annual plan. The Terms of membership set out the details.