Planning a renovation

Kitchen renovation budget: what to allow for, line by line

A kitchen budget is far more than the units. Here is every line to allow for, the published UK figures behind them, and how to keep the budget honest once work starts.

A kitchen budget: units, worktops and appliances, with fitting not priced yet
Contents

Key points

  • A kitchen budget covers far more than the units: worktops, appliances, fitting, plumbing, electrics, gas, extraction, flooring, walls, waste, living costs and a contingency.
  • In UK prices collected by Which? in May 2025, 12 kitchen units alone ranged from about £1,500 to £9,000 across seven retailers.
  • Which? says labour is roughly 20% to 30% of the final cost if you do none of the installation yourself (BCIS data).
  • Changing the layout costs more than changing the units, because pipes, waste, gas and circuits move with the sink, hob and appliances.
  • Mark every line as estimate, quote, agreed price or paid, and keep unknown lines visible until they have a figure.

A kitchen renovation budget covers far more than the units: worktops, appliances, fitting, plumbing, electrics, flooring, decorating, waste and a contingency. In UK prices collected by Which?, 12 kitchen units alone ranged from about £1,500 to £9,000, and labour adds roughly 20% to 30% of the final cost. List every line, price it, then add a contingency.

No single published total fits every kitchen, because the size, any change of layout and the quality you choose move the figure so far. That is why the honest answer is a figure built line by line from your own kitchen.

This guide answers how much a new kitchen costs, gives you the full list of lines with the published UK figures behind them, and shows how to keep the budget honest once work starts.

How much does a new kitchen cost?

How much it costs to renovate a kitchen depends on three things: how much of the layout changes, the quality of the units and worktops, and how much work sits around them. Which? bases its prices on a 15 square metre, 12-unit kitchen in a semi-detached house, and its figures show where the money goes (Which?, April 2026):

  1. Units: about £1,500 to £9,000 for 12 units across seven retailers, at prices collected in May 2025, including VAT.
  2. Appliances: from about £50 for a microwave to £290 for a Best Buy washing machine, each, at prices listed in November 2025.
  3. Labour: roughly 20% to 30% of the final spend if you do none of the installation yourself, based on Building Cost Information Service (BCIS) data.
  4. Everything around the units: one kitchen retailer told Which? to expect around 30% of the budget to go on plumbing, flooring, electrics and other expenses.

So a price for a new kitchen only means something once you know which of these lines it covers. The rest of this guide builds your own figure line by line, which is the only honest answer to how much your kitchen will cost.

Kitchen renovation budget: every line to include

LineWhat it coversOften missed
UnitsBase, wall and tall units, doors, handles, plinths, end panelsCornices, pelmets, filler pieces
WorktopsWorktop run, upstands, cut-outsJoints, edging, templating fees
SplashbackTiles, glass or stoneFitting and sealing
Sink and tapSink, tap, waste and trapBoiling water tap supply
AppliancesOven, hob, extractor, fridge-freezer, dishwasher, washing machineInstallation and removal of old ones
FittingAssembling and fixing units, worktops, appliancesSecond visit for snags
PlumbingNew or moved water and waste pipesMoving the sink to an island
ElectricsSockets, lighting, appliance circuitsNew circuits, consumer unit work
GasHob connection or moving the supplyGas Safe engineer visit
ExtractionExtractor and ducting to outsideDrilling through a solid wall
FlooringFloor finish and preparationLevelling the subfloor
Walls and ceilingPlastering, making good, decoratingRepairs behind the old units
WasteSkip or waste removalDisposing of old appliances
Living costsEating out, temporary kitchenWeeks longer than planned
ContingencyUnknownsEverything above

Step 1: decide the scope before you price it

The biggest cost driver is not the units; it is how much you change. Write down which of these apply:

  • Same layout, new units. Plumbing and electrics stay roughly where they are.
  • New layout. The sink, hob or appliances move, so pipes, waste, gas and circuits move too.
  • Structural change. A wall comes out, an opening is made or a window moves.

Watch out

Moving a sink a short distance can mean a new waste route through a wall or floor. Moving a hob can mean a new gas run and a new extractor route. Price the services for the new layout, not the old one.

Our guide to writing a renovation scope shows how to describe the job so every quote covers the same work.

Step 2: price each line

Units

Which? secret-shopped seven kitchen retailers in May 2025 for a 12-unit kitchen, including handles, cornices, plinths, pelmets and end panels but not worktops, sinks, taps or appliances. Prices, rounded to the nearest £500 and including VAT and sale discounts, ranged from about £1,500 to £9,000 depending on the retailer and range (Which?, April 2026). Some of those prices included discounts of 50% or more, so the same kitchen can cost very different amounts depending on when you buy.

Appliances

Which? lists starting prices for appliances it rates as Great Value or Best Buys, as listed online in November 2025:

ApplianceGreat Value fromBest Buy from
Single oven£160£190
Hob£100£200
Cooker hood£140£230
Microwave£50£50
Fridge-freezer£180£180
Washing machine£240£290

These are entry points, not averages. Built-in and premium appliances cost more, so price the exact models you want.

Fitting and labour

If you do no part of the installation yourself, Which? says labour makes up approximately 20% to 30% of the final spend, based on Building Cost Information Service (BCIS) data. It adds that labour costs tend to be higher for bespoke kitchens, which need more precision. Ask every fitter to break the price down: units, worktops, appliances, plumbing, electrics, tiling and making good.

Everything around the units

One kitchen retailer told Which? to expect around 30% of a kitchen budget to go on plumbing, flooring, electrics and other expenses. Whatever the share in your kitchen, give each of those its own line so it cannot be squeezed out of the total.

In the UK (England and Wales)

GOV.UK lists jobs that might need building regulations approval, including replacing fuse boxes and connected electrics, installing or replacing a heating system, and replacing windows and doors. You do not need to get approval yourself if the work is done by someone registered with a competent person scheme. For gas, Gas Safe Register says only Gas Safe registered engineers can legally do gas work, whether on appliances, flues or pipework. Scotland and Northern Ireland have their own building rules.

Step 3: turn the list into a budget with contingency

Two quotes for the same kitchen in Mekozo, close up: £5,500 accepted and £6,200 received, each with what it includes and excludes

Mekozo lines up quotes for the same kitchen side by side, with what each includes and excludes, its timing and which one is used in your figures.

Try it free for 30 days, no card needed

Once every line has a figure, mark how solid it is:

  1. Estimate. Your own guess or a published figure.
  2. Quote. A written price for that line from a supplier or trade.
  3. Agreed. A quote you have accepted.
  4. Paid. Money that has gone.

Then add a contingency for the unknowns: what is behind the old units, the state of the floor and walls, and anything still not decided. Our guide to renovation contingency shows how to size it from your own risks rather than a guess.

Tip

A quote for "supply and fit kitchen" is not a budget. Ask for the same breakdown from every fitter so you can compare like for like. Citizens Advice suggests a quote should have a fixed total, a breakdown of the work and materials, separate costs for each part, how long the price is valid and whether it includes VAT.

Worked example: how a kitchen budget is laid out

This shows the structure, not a recommended spend. Replace every figure with your own quotes.

LineFigureStatus
Units (12)Your chosen rangeQuote
Worktop and upstandsYour chosen materialQuote
Sink, tap, wasteYour choiceEstimate
AppliancesSix appliances priced by modelEstimate
FittingFrom fitter's breakdownQuote
Plumbing changesFrom plumberQuote
Electrics and lightingFrom electricianQuote
Gas connectionFrom Gas Safe engineerQuote
Extractor ductingFrom fitter or builderUnknown
Flooring and preparationSupplier and fitterQuote
Tiling and decoratingFrom tradesEstimate
Waste removalSkip or collectionEstimate
Living costs during the workYour weekly estimate times the weeksEstimate
ContingencySized from your risksSet aside

Watch out

A line marked "unknown" is not zero. Leave it visible in the total until you have a figure, so the budget does not look smaller than it is.

Keeping a kitchen renovation on budget

The most reliable ways to protect the budget are about decisions, not discounts:

  • Keep the layout if you can, so services stay where they are.
  • Fix the specification before you get quotes, including appliance models and worktop material.
  • Order long-lead items early and record each order and payment the day it happens. An invoice is the bill for agreed work; record it, then the payment against it, as our guide to keeping agreed prices, invoices and payments apart shows.
  • Separate upgrades from unknowns. A better worktop is a choice to price, not a call on the contingency.
  • Price changes before they happen. Every change after ordering costs more than the same decision made before.

Track every order and payment as it happens. Use the kitchen renovation checklist to put the jobs in order.

On the Operation Sicily villa

From the villa in Sicily. The kitchen at the villa Mekozo's founder, Jonathan Smith, is renovating shows how many jobs sit around the units. Before the kitchen could go in, the room was replanned: the old double glass doors were removed and the opening reconfigured, which meant new concrete lintels and repairs to the surrounding stone, as he records on Operation Sicily (the real timeline of the villa). Jonathan core drilled through a stone wall for the extractor (Episode 48), and the floor was tiled and grouted and the last sockets fitted before the fitters arrived. The units themselves were ordered and paid for months earlier because of a three month lead time. On the day, the fitters installed tall units, base units, marble worktops and splashback, a built-in oven and microwave, a fridge-freezer, a washing machine and a five-ring gas hob (Episode 92). Each of those is a separate line in a kitchen budget, and so is every job that came before them. His real-world breakdown of renovation costs in Sicily covers costs for an Italian project.

Playing loads YouTube’s external player.

Watch directly on YouTube ↗

Kitchen budget checklist

  • Scope written: same layout, new layout or structural change
  • Every line from the table above priced or marked unknown
  • Appliances priced by model, not by type
  • Fitting quotes broken down the same way
  • Services priced for the new layout
  • Building regulations and Gas Safe needs checked
  • Living costs during the work included
  • Contingency sized from your own risks
  • Every order and payment recorded as it happens

For the wider plan, see our guide to how to plan a renovation, from scope to quotes and budget, our guide to the bathroom renovation budget, and how to compare builders' quotes on the same scope. To keep the kitchen inside a whole-house budget, see the renovation budget tracker and how to compare quotes on more than price in Mekozo.

This guide explains a budgeting method. Figures are published averages and starting prices, not quotes; get written prices for your own kitchen.

Questions people ask

How much does a new kitchen cost in the UK?

There is no single figure, because size, layout changes and quality drive the total. In UK prices collected by Which? in May 2025, a 12-unit set of kitchen units alone ranged from about £1,500 to £9,000 across seven retailers, before worktops, appliances or fitting. Build your own figure from a line-by-line list: units, worktops, appliances, fitting, plumbing, electrics, flooring, decorating and a contingency.

What percentage of a kitchen budget is labour?

Which? says that if you do none of the installation yourself, labour makes up roughly 20% to 30% of the final cost, based on Building Cost Information Service data. Bespoke kitchens tend to cost more to fit because they need more precision.

What are the hidden costs of a kitchen renovation?

The costs people miss are usually around the units: moving plumbing or electrics, new circuits, gas work, an extractor duct through the wall, making good walls and ceilings, flooring under and around the units, skip hire and waste, and eating out while the kitchen is out of action.

Is it cheaper to keep the same kitchen layout?

Usually, yes. With the same layout the plumbing and electrics stay roughly where they are, while a new layout moves pipes, waste, gas and circuits along with the sink, hob and appliances. Even moving a sink a short distance can mean a new waste route through a wall or floor, so price the services for the layout you actually want.

How can I keep a kitchen renovation on a budget?

Keep the existing layout so plumbing and electrics stay where they are, decide your specification before you ask for quotes, compare quotes on the same scope, and hold a contingency for what you find behind the old units. Track every order and payment as it happens so the total never surprises you.

Sources

  1. Which?, How much does a new kitchen cost in 2026? (BCIS data; unit prices collected May 2025; appliance prices November 2025) · 26 April 2026
  2. GOV.UK, Building regulations approval: when you need approval · Checked 18 November 2026
  3. Gas Safe Register, Gas safety information for home buyers and sellers · Checked 18 November 2026
  4. Citizens Advice, Before you get work done on your home (England) · Checked 18 November 2026
  5. Operation Sicily, Episode 92: Italian kitchen reveal at my Sicilian villa · Checked 18 November 2026
  6. Operation Sicily, Episode 48: Core drilling a stone wall for a kitchen extractor fan · Checked 18 November 2026
  7. Operation Sicily, The real timeline of a Sicilian villa renovation · Checked 18 November 2026
Jonathan Smith opening the gate of the villa in Sicily

About the author:

Jonathan Smith is the founder of Mekozo and Operation Sicily. Jonathan bought an abandoned villa in Sicily and is rebuilding it on camera, every week. Mekozo is the app Jonathan built to keep that renovation's money in one picture.

Related from Operation SicilyHow much does it really cost to renovate a house in Sicily? (2026)

Real renovation experience and regional guidance from Operation Sicily.

Blog

Related reading

A kitchen checklist: layout agreed and sockets and plumbing ticked, worktop still to measure
Planning a renovation

Kitchen renovation checklist: plan it in the right order

A kitchen pulls in more trades than any other room. The decisions to make before you order, the order of work from strip-out to worktops and appliances, the checks at each stage and what to collect before the last payment.

All Blog posts →

Bring the whole picture home.

Budgets, quotes, payments, documents and decisions in one place

30 days free. No card needed.

Monthly, with no annual plan. The Terms of membership set out the details.