Replacement windows cost: what to budget and why
Replacement windows cost depends on frame material, style, size, glazing and the work around each opening. Published figures, what moves the price, and how to turn a quote into a full budget.
A new roof costs far more than the tiles. Published figures for pitched and flat roofs, what drives the price, the extras to price separately and how to hold a contingency for what stripping reveals.

A new roof's cost depends on its size, shape, covering, access and what is found under the old covering. In a Which? survey of trusted roofers in November 2025, a new tiled roof on an average three-bedroom house cost £7,000 to £21,000 excluding VAT. A new felt flat roof on a single garage was £1,400 to £3,500.
The range is wide because no two roofs are the same. This guide shows what the published figures cover, what moves the price, the extras that quotes often leave out, and how to build a roof budget with a contingency for what stripping the old covering reveals.
These are the most useful published figures, each from a named source with its date. Treat them as a check on quotes, not as your budget.
| Job | Price | Source |
|---|---|---|
| New tiled roof, average three-bedroom house | £7,000 to £21,000 (excl. VAT) | Which?, survey of Trusted Traders, November 2025 |
| New felt flat roof, single garage (6 x 3 m), existing structure kept | £1,400 to £3,500 (excl. VAT) | Which?, November 2025 |
| New flat roof, single garage, new boards and EPDM or PVC | £1,950 to £4,000 (excl. VAT) | Which?, November 2025 |
| Strip and retile, two-bedroom terrace (about 60 m²) | £7,500 to £12,500 | FMB, November 2025 |
| Strip and retile, three-bedroom semi (about 80 m²) | £10,000 to £15,000 | FMB, November 2025 |
| Strip and retile, four-bedroom detached (about 120 m²) | £15,000 to £20,000 | FMB, November 2025 |
Sources: Which? (article updated 21 October 2026) and the Federation of Master Builders' new roof cost guide, which quotes figures from a firm of chartered surveyors. Which? adds that prices are likely to be at the upper end of the scale in London and the South East.
Tip
Roofers often give an estimate rather than a fixed quote, because, as Which? notes, they may not be able to see the condition of the structure until the tiles or slates are off. Ask how any extra work found will be priced before you agree.
The FMB's roofing materials guide (prices updated October 2026) gives supply-only examples. They exclude labour, battens, underlay, fixings, scaffolding and waste.
| Covering | Supply-only example | Typical use |
|---|---|---|
| Concrete interlocking tiles | About £25 per m² | Modern homes, extensions |
| Plain clay tiles | About £1.97 each, around 60 per m² | Victorian and Edwardian homes, cottages |
| Natural slate | About £4.74 per 500 x 250 mm slate | Period properties, heritage work |
| Fibre-cement slate | About £42 per m² | A lighter slate-style finish |
| EPDM membrane kit | About £31.55 per m² | Flat roofs, dormers, garages |
Watch out
The cheapest tile does not always make the cheapest roof. The FMB points out that a small plain tile can need around 60 pieces per square metre against 10 or 11 for a large interlocking tile, so more pieces have to be positioned, cut and fixed.
Ask every roofer to confirm, line by line, what is included. The FMB suggests checking for these:
| Line | What it covers |
|---|---|
| Stripping and disposal | Removing the old covering, skip or licensed waste carrier |
| Underlay, battens and fixings | Breathable membrane, graded battens, nails and clips |
| Ridges, hips, verges and valleys | Dry-fix or mortar systems at every junction |
| Flashings | Around chimneys, rooflights and walls |
| Scaffolding | Hire period, any licence, temporary weather protection |
| Insulation | Upgrading while the roof is open |
| Gutters, fascias and soffits | Replacing them while the scaffold is up |
| Roof windows | New or replacement rooflights and flashing kits |
| Structural repairs | Decking, rafters or battens found to be damaged |
| Guarantees and VAT | Product warranties, workmanship guarantee, VAT shown |
Doing gutters, fascias and insulation while the scaffold is already up avoids paying for access twice. Our guide to comparing builders' quotes on the same scope shows how to line up quotes so the same lines are in each.
The method is the same everywhere: describe the roof, get quotes on the same specification, price the extras and hold a contingency. The rules and published prices differ, so they sit in these boxes.
In the UK (England and Wales)
GOV.UK lists "replace roof coverings on pitched and flat roofs" among the jobs that might need building regulations approval. Which? says significant roof work must either be done by a roofer registered with a roofing competent person scheme, who can self-certify the work, or you must notify your local authority's building control before work begins. The FMB adds that approval may be needed if structural alterations are made, a large part of the roof is replaced, or the new covering is 15% or more heavier than the old one. Listed buildings and conservation areas can restrict materials and colours. Scotland and Northern Ireland have their own building rules.
In the US
The Journal of Light Construction's 2025 Cost vs Value Report gives a national average job cost of $31,871 for its defined asphalt shingle roof replacement project, and $51,865 for the metal roof version (2025). Permits and prices vary by state and city, so check with your local building department.
In Italy
Mekozo's founder, Jonathan Smith, who films his villa renovation on Operation Sicily, gives in his 2026 renovation cost breakdown his own estimate of €6,000 to €18,000 for roof repair or replacement on a typical 80 to 120 square metre property in western Sicily, and €120 to €170 as a roofer's day rate. These are his figures from his own renovation, not an independent survey, so treat them as one owner's experience. The breakdown advises asking which parts need repair or replacement, how access and scaffolding will work, and comparing the waterproofing, insulation and drainage included rather than the headline price. Ask your geometra whether the work needs a building notification.
Which? says repairing a roof is almost always much more cost effective than replacing it, unless the repair is unlikely to solve the problem or will not last. A new roof may make sense where there is structural damage or extensive leaks. Its survey of Trusted Traders (November 2025, excluding VAT) gives some typical repair prices:
| Repair | Price |
|---|---|
| Replace one to six broken or missing standard tiles | £75 to £400 |
| Replace a single ridge tile | £80 to £300 |
| Clean all gutters, front and back | £75 to £350 |
Signs to have the roof looked at, from the same source:
Watch out
Do not climb onto the roof to inspect it yourself. The FMB cites the Health and Safety Executive, which says almost one in five deaths in construction work involves roof work. A competent roofer can inspect safely.

Mekozo's Costs & spending view shows the roof's costs so far, what is paid and still to pay, any line not yet priced, and the money in your plan, so extra work found under the tiles has somewhere to go.
Try it free for 30 days, no card neededTie each payment to a stage you can check, such as the scaffolding up, the old covering stripped and the new roof finished, as our guide to how to pay a contractor explains.
On the Operation Sicily villa
From the villa in Sicily. When Jonathan viewed the villa he went on to buy, there was no staining on the ceilings, which suggested the roof was sound (Episode 9). It is a flat roof of about 100 square metres, reached through a doorway at the top of the tower that had been walled up and had to be knocked through (Episode 42). The roof had to be waterproofed before any solar panels could go up, so he bought a two-part liquid system: a fibre reinforced waterproof membrane and a reflective coat on top, two 20kg tubs (Episode 75). Even so, his cost breakdown records that roof sections which appeared sound turned out not to be, and needed unplanned spending. That is why a roof budget needs a contingency even when the roof looks fine from inside.
Playing loads YouTube’s external player.
Watch directly on YouTube ↗For the wider plan, see our guide to planning the big jobs on an older house, what replacement windows cost, and what to check first when renovating an old house. To fit the roof into a home renovation budget and keep it there, see the renovation budget tracker and how to build a whole-project budget in Mekozo.
This guide explains a budgeting method. Figures are published averages and examples from the named sources, not quotes; get written prices for your own roof.
In a survey of Which? Trusted Traders in November 2025, replacing the whole tiled roof on an average three-bedroom house cost £7,000 to £21,000 excluding VAT, with prices likely to be at the upper end in London and the South East. Where your roof falls in that range depends on its size, pitch, covering and scaffolding, so compare at least three itemised quotes on the same specification.
The roof's size, pitch and complexity, the covering you choose, and scaffolding usually move the price most. Hips, valleys, dormers, chimneys and rooflights all add cutting and flashing work. Repairs to battens, rafters or decking found once the old covering is off can add more.
In England and Wales, GOV.UK lists replacing roof coverings on pitched and flat roofs among jobs that might need approval. Which? says significant roof work must either be done by a roofer registered with a roofing competent person scheme, who can self-certify, or you must notify building control before work begins. Scotland and Northern Ireland have their own rules.
Which? says repairing is almost always much more cost effective than a new roof, unless the repair is unlikely to solve the problem or last. A new roof may make sense when there is structural damage or extensive leaks. Have the roof inspected and get more than one opinion before deciding.
The Federation of Master Builders suggests around 10% to 15% when the existing covering is stripped and hidden defects may be uncovered. Roofers may give an estimate rather than a fixed quote for the same reason, so ask how any extra work will be priced.
Real renovation experience and regional guidance from Operation Sicily.

Replacement windows cost depends on frame material, style, size, glazing and the work around each opening. Published figures, what moves the price, and how to turn a quote into a full budget.

An old house rewards patience. Check the structure, roof, damp, services and paperwork before you plan finishes, do the work in the right order, use materials that suit how the house was built and give the unknowns their own budget.

Size your renovation contingency from the real unknowns in your project, keep upgrades out of it, and watch what is left after every change.