Replacement windows cost: what to budget and why

Replacement windows cost depends on frame material, style, size, glazing and the work around each opening. Published figures, what moves the price, and how to turn a quote into a full budget.

An old green wooden window with peeling paint in a white wall
Contents

Key points

  • Energy Saving Trust says a set of A-rated windows for a semi-detached house typically costs around £4,800 (page updated May 2026).
  • Frame material moves the price most: in FMB Home Picks prices for November 2026, a 900 x 1,200 mm casement window was about £615 in uPVC, £800 in aluminium and £1,850 in timber.
  • A window quote is not the whole budget: add making good, sills, lintels, scaffolding, waste, blinds and the certificate.
  • In England and Wales replacement windows fall under building regulations; a competent person scheme installer can self-certify the work.
  • Compare quotes on the same specification: frame, glass, opening type, colour, handles and fitting method.

How much do replacement windows cost?

Replacement windows cost depends on frame material, style, size, glazing and how many you fit. Energy Saving Trust says a set of A-rated windows for a semi-detached house typically costs around £4,800. Per window, FMB Home Picks listed a 900 x 1,200 mm casement at about £615 in uPVC, £800 in aluminium and £1,850 in timber (November 2026).

Those figures are starting points, not quotes. This guide shows what moves the price, what the published figures cover, and how to turn a window quote into a full budget that includes the work around each opening.

Replacement window prices by material and style

FMB Home Picks, the consumer site of the Federation of Master Builders, publishes per-window prices for common sizes. These are its figures, with prices stated as correct in November 2026 (FMB Home Picks):

Window (frame)Smaller sizeLarger size
Casement, uPVC£525 (600 x 900 mm)£670 (1,200 x 1,200 mm)
Casement, aluminium£700£870
Casement, timber£1,630£1,975
Sash, uPVC£805 (600 x 900 mm)£915 (900 x 1,200 mm)
Sash, timber£2,450£2,775
Tilt and turn, uPVC£670 (800 x 800 mm)£835 (1,200 x 1,200 mm)
Tilt and turn, aluminium£875£1,085

For a whole house, FMB Home Picks' guide to double glazing a three-bed house puts a semi-detached home with about nine windows at around £7,350 in uPVC, £12,850 in aluminium and £18,100 in timber.

Tip

Use published prices to check whether a quote is in the right range, not to set your budget. Your windows are a particular size, in a particular wall, at a particular height, and only a survey of your openings gives a price for them.

What drives the cost of replacement windows

Six things move the price more than anything else:

  1. Frame material. uPVC is usually cheapest, aluminium sits in the middle and timber costs the most, as the table shows.
  2. Style and opening. Casements are simplest. Sash, tilt and turn, bay and bow windows have more parts and more labour.
  3. Size and number. Bigger panes cost more, and so does every extra window.
  4. Glazing. Energy Saving Trust says triple glazing is around 20% more expensive than double glazing (Energy Saving Trust, May 2026). Laminated, acoustic or solar control glass adds more.
  5. Access. Upper floors may need scaffolding or a tower, which is often priced separately.
  6. The opening itself. A sound opening takes a new frame quickly. A failed lintel, crumbling reveal or rotten sill turns a fitting job into a building job.

Watch out

The opening is the part nobody can price from outside. Until the old frame is out, nobody knows for certain what the lintel and reveals look like. Keep a contingency line for it, rather than assuming every opening is sound.

What a window budget needs beyond the windows

A quote for "supply and fit" can leave out the jobs that make the room usable again. Give each of these its own line:

Budget lineWhat it coversOften missed
WindowsFrames, glass, handles, trickle ventsColour or finish upgrades
DoorsFront, back and patio doors if done togetherThresholds and locks
FittingRemoving old frames, fixing and sealing new onesSecond visit for one late window
SillsInternal and external sillsStone or marble sills ordered separately
Making goodPlaster around reveals, filling, decoratingRepainting the whole wall
StructureLintels or reveal repairs found once frames are outNot known until opening up
AccessScaffolding or a towerHire for longer than planned
WasteTaking away old frames and glassSkip if not included
Blinds and curtainsFitting to new frame sizesNew tracks and poles
PaperworkCertificate of complianceGuarantee registration
ContingencyUnknownsEverything above

Our guide to the home renovation budget shows how a windows line sits inside a whole-house budget, and our guide to sizing a contingency shows how to set the reserve from your own risks.

Country rules and prices

The method is the same everywhere: list every window, price the same specification from several installers, and add the work around the openings. Rules and published prices differ by country, so they sit in the boxes below.

In the UK (England and Wales)

GOV.UK lists "replace windows and doors" among the jobs that might need building regulations approval. You do not need to apply yourself if the installer is registered with a competent person scheme: they can self-certify the work and give you a certificate within 8 weeks of completion, which shows up in solicitors' searches when you sell. GOV.UK adds that without approval you will not have the certificates you may need when you sell. If you live in a listed building or a conservation area, Energy Saving Trust advises checking with your local planning office before replacing windows. Scotland and Northern Ireland have their own building rules.

In the US

The Journal of Light Construction's 2025 Cost vs Value Report prices a project replacing 10 existing 3 x 5 foot double-hung windows with insulated, low-E vinyl windows at a national average job cost of $22,073, and the same job in wood at $26,781 (2025). These are national averages for a defined project; local permit rules and prices vary by state and city, so check with your local building department.

In Italy

Mekozo's founder, Jonathan Smith, who films his villa renovation on Operation Sicily, gives in his 2026 renovation cost breakdown his own estimates of €350 to €1,200 for a standard double-glazed window and €5,000 to €12,000 for window and door replacement on a typical 80 to 120 square metre property in western Sicily. They come from his own renovation, not an independent survey. Whether replacement windows need a building notification depends on the work and the property, so ask your geometra to classify the full scope before you order.

How to compare window quotes like for like

Two quotes for the same kitchen in Mekozo, close up: £5,500 accepted and £6,200 received, each with what it includes and excludes

Mekozo puts quotes side by side, with what each includes and excludes and its timing, so you can see which installer has left out the sills, the making good or the waste before you agree a price.

Try it free for 30 days, no card needed

Two window quotes can differ by thousands simply because they describe different windows. Before comparing prices, make sure every installer is pricing the same job.

  1. Write one specification. Frame material, colour inside and out, glazing (double or triple, laminated or toughened, any solar control), opening type, handles and locks.
  2. List every opening. Room, width, height, floor level and opening direction, so nobody misses a small window.
  3. Ask for a breakdown. Windows, doors, fitting, sills, making good, scaffolding, waste and VAT as separate lines.
  4. Ask what is excluded. Lintels, reveal repairs, plastering and decorating are the usual gaps.
  5. Check the paperwork. In England and Wales, ask whether the installer is registered with a competent person scheme and when you will get the certificate.
  6. Check the lead time and payment stages. Made-to-measure windows are ordered in advance, so ask when the deposit is due and when the rest is paid.

Tip

When one quote is much lower than the others, look first for a missing line before assuming it is better value. Our guide to comparing builders' quotes on the same scope shows how to line them up.

Replace the windows or repair them?

Not every old window needs replacing. Energy Saving Trust notes that if condensation forms between the panes, the double glazed unit can sometimes be replaced rather than the whole window, and that secondary glazing can be an option where original windows must be kept, for example in a listed building (Energy Saving Trust, May 2026). It says well installed and maintained double glazing can last 20 to 35 years.

Signs it may be time to replace, from the same source:

  • Condensation between the panes
  • Draughts around closed windows
  • Discolouration of the frames
  • Windows that are hard to open or close

Ask installers for both prices where it applies: replacing the sealed units and replacing the whole window.

When to fit windows in a renovation

On a bigger renovation, windows sit in the middle of the order of work, not at the end:

  1. Structural work first. Lintels, openings and any enlarged openings are done before frames are measured.
  2. Measure and order. Made-to-measure frames have a lead time, so order once the openings are final.
  3. Board up if needed. If old frames come out before plastering, temporary boards keep weather and animals out.
  4. Fit before final finishes. Frames go in before final plaster, decorating and flooring around them.
  5. Leave tiled rooms until the tiling is done if the frame sits against tiles.

Our home renovation checklist puts the whole order of work in sequence.

On the Operation Sicily villa

From the villa in Sicily. At Jonathan's villa, the old metal windows came out long before the new ones went in. The first one had no visible fixings and was set into concrete, and once it was out the lintel above it needed replacing too: one job became two (Episode 58). The openings were boarded up with timber frames and OSB to keep out the weather and rodents while the plasterers worked. For the new windows, he asked window companies across Italy, Poland and Germany for quotes. Price mattered but was not a deal-breaker, and he changed details along the way, from colours and glass to handles and opening directions. Everything was made to measure: thermally broken aluminium, tilt and turn opening, 33.1 laminated safety glass with a 16mm argon cavity and 70/35 solar control glazing. One window waited: the bathroom window was left until the wall tiles were done, with the installers coming back in a few weeks to fit it (Episode 88). Each of those is a line worth tracking: the lintels, the boarding, the specification changes and the return visit. His real-world breakdown of renovation costs in Sicily puts purchases like this in context.

Playing loads YouTube’s external player.

Watch directly on YouTube ↗

Replacement windows budget checklist

  • Every opening listed with room, size, floor and opening direction
  • One specification written for frames, glass, colour, handles and opening
  • Doors included or excluded on purpose
  • At least three quotes on the same specification, each broken down
  • Sills, making good, scaffolding and waste priced
  • A contingency line for lintels and reveals
  • Rules checked for your country and property, including listed status
  • Certificate and guarantee on the list before the final payment
  • Deposit, lead time and payment stages agreed in writing

For the wider plan, see our guide to planning the big jobs on an older house, what a new roof costs, and how to estimate the cost of renovating a whole house. To keep the windows inside a whole-house budget, with quotes, payments and the certificate in one place, see the renovation budget tracker and how to compare quotes on more than price in Mekozo.

This guide explains a budgeting method. Figures are published averages and starting prices from the named sources, not quotes; get written prices for your own windows.

Questions people ask

How much does it cost to replace all the windows in a three-bedroom house?

FMB Home Picks puts double glazing a three-bedroom semi with about nine windows at around £7,350 in uPVC, £12,850 in aluminium and £18,100 in timber. Energy Saving Trust says a set of A-rated windows for a semi-detached house typically costs around £4,800. Your own figure depends on the number, size and style of the windows, so get quotes on one specification.

Is it cheaper to replace all windows at once?

Doing them together usually means one survey, one set of access equipment and one round of making good, and installers price a whole order rather than single visits. It also lets you match frames, colours and handles. If the budget will not stretch, replace the windows in the worst condition first and keep the same specification for the rest.

Do I need building regulations approval for replacement windows?

In England and Wales, GOV.UK lists replacing windows and doors among the jobs that might need building regulations approval. You do not need to apply yourself if the installer is registered with a competent person scheme, who will give you a certificate within 8 weeks of completion. Scotland and Northern Ireland have their own rules.

How long do double glazed windows last?

Energy Saving Trust says high-quality double glazing that is installed properly and well maintained can last 20 to 35 years, and sometimes longer. Condensation between the panes, draughts or windows that are hard to open are signs that units or windows may need replacing.

Can I replace just the glass instead of the whole window?

Often, yes. If the frame is sound and only the sealed unit has failed, which shows as misting between the panes, Energy Saving Trust notes that the double glazed unit can be replaced rather than the whole window. It is a smaller job, so ask for both prices.

Sources

  1. Energy Saving Trust, Energy efficient windows and doors · Last updated 20 May 2026
  2. Federation of Master Builders (FMB Home Picks), How much do new windows cost? 2026 UK prices · Checked 18 November 2026
  3. Federation of Master Builders (FMB Home Picks), Cost to double glaze a three-bed house · Checked 18 November 2026
  4. GOV.UK, Building regulations approval: when you need approval · Checked 18 November 2026
  5. GOV.UK, Building regulations approval: use a competent person scheme · Checked 18 November 2026
  6. Journal of Light Construction, 2025 Cost vs Value Report: window replacement · 2025
  7. Operation Sicily, How much does it really cost to renovate a house in Sicily? (2026 real-world breakdown) · 2026, checked 18 November 2026
  8. Operation Sicily, Episode 88: New windows and doors fitted at my Sicilian villa · Checked 18 November 2026
  9. Operation Sicily, Episode 58: Removing old metal windows and boarding up · Checked 18 November 2026
Jonathan Smith opening the gate of the villa in Sicily

About the author:

Jonathan Smith is the founder of Mekozo and Operation Sicily. Jonathan bought an abandoned villa in Sicily and is rebuilding it on camera, every week. Mekozo is the app Jonathan built to keep that renovation's money in one picture.

Related from Operation SicilyHow much does it really cost to renovate a house in Sicily? (2026)

Real renovation experience and regional guidance from Operation Sicily.

Blog

Related reading

A roofer at work on a tiled roof behind scaffolding and safety netting
Planning a renovation

New roof cost: what to budget and what drives it

A new roof costs far more than the tiles. Published figures for pitched and flat roofs, what drives the price, the extras to price separately and how to hold a contingency for what stripping reveals.

A builder repairing an old brick wall by hand
Planning a renovation

Renovating an old house: what to check and budget for first

An old house rewards patience. Check the structure, roof, damp, services and paperwork before you plan finishes, do the work in the right order, use materials that suit how the house was built and give the unknowns their own budget.

All Blog posts →

Bring the whole picture home.

Budgets, quotes, payments, documents and decisions in one place

30 days free. No card needed.

Monthly, with no annual plan. The Terms of membership set out the details.