How much does it cost to renovate a house? Estimate yours
There is no honest single figure for renovating a house. Here is how to build your own estimate from the size, the depth of work and the finish, using named, dated figures for each job.
A home renovation budget is a spending limit, a scope and a list of every cost, with a contingency on top. Eight steps to set one, the lines people miss, and how to keep it honest once work starts.

Set a home renovation budget in eight steps: decide your spending limit, write the scope room by room, list every cost line, price each line from published figures, replace them with written quotes, add professional fees, permissions and living costs, hold a contingency, then compare the total with your limit and adjust the scope before work starts.
A budget is not one number. It is a limit, a scope and a list of lines, each with a figure and a status. This guide takes you through the steps, the lines people miss, and how to keep the budget honest once the builders arrive. It explains a budgeting method; it does not cover borrowing or tax.
| Step | What you do | What you end up with |
|---|---|---|
| 1. Set the limit | Decide the most you can spend | A ceiling for the whole project |
| 2. Write the scope | Room by room, what changes | A scope of works |
| 3. List every line | Labour, materials, fees, living costs | A complete cost list |
| 4. Price from published figures | Named, dated sources | A first estimate |
| 5. Get written quotes | Same scope to every trader | Real prices |
| 6. Build the working budget | Status for every line, contingency | A budget you can track |
| 7. Check it against the limit | Cut, phase or confirm | A budget that fits |
| 8. Track it as work happens | Agreed price, final cost, paid | No surprises |
Start with the most you can spend on the whole project, including the contingency, from money you know you will have when each payment falls due. Then fit the scope to that figure. Working the other way, from a wish list to a total, is how budgets drift.
Tip
Write the limit at the top of the budget and keep it there. Every decision later is easier when the ceiling is visible.
List each room and area, and what will change in it. Put must-haves first and upgrades on a separate list. Jonathan, who films his villa renovation on Operation Sicily, puts structural repairs, plumbing and electrics first, and premium finishes and decorative upgrades on a separate list (Episode 14).
| Room or area | Must-have work | Upgrades if the budget allows |
|---|---|---|
| Whole house | Rewire, heating, roof repair | Underfloor heating |
| Kitchen | New units, plumbing, electrics | Stone worktop |
| Bathroom | New suite, tiling, ventilation | Walk-in shower |
| Outside | Drainage repair | New patio |
Our guide to writing a renovation scope shows how to describe the work so every quote prices the same job, and our home renovation checklist puts the work in the right order.
Give every cost its own line. A cost without a line is a cost that gets forgotten.
| Line | What it covers | Often missed |
|---|---|---|
| Labour | Every trade, room by room | Return visits, making good |
| Materials | Everything the trades fit | Delivery, waste, accessories |
| Professional fees | Architect, engineer, surveyor, designer | Revisions and site visits |
| Permissions and fees | Planning, building control, party wall | Inspection fees after the work |
| Site costs | Scaffolding, skips, toilet, protection | Hire running longer than planned |
| Services | New connections, meter moves | Lead times from suppliers |
| Fixtures and appliances | Kitchen, bathroom, lighting | Installation and removal of old |
| Finishes | Flooring, tiling, decorating | Preparation and levelling |
| Living costs | Rent, storage, eating out, travel | Weeks longer than planned |
| VAT | Shown on every quote | Quotes that leave it out |
| Changes | Anything added after quotes | Every "while you are at it" |
| Contingency | The unknowns | Being used for upgrades |
In the UK (England)
Citizens Advice says you usually need planning permission from your local council for something new, a major change such as an extension, or a change of use, and that you usually pay a fee when you apply. Building control bodies also usually charge a fee when you apply, and you might pay another when they inspect the work. GOV.UK explains when you need planning permission and when you need building regulations approval. Scotland, Wales and Northern Ireland have their own rules.
Before you have quotes, use named, dated sources for a first figure, and mark it as an estimate. Our cost guides give published figures for common jobs:
For the whole house, our guide to how much it costs to renovate a house shows how to estimate the total.
In Italy
Jonathan's own 2026 renovation cost breakdown gives typical ranges for western Sicily, from €25,000 to €45,000 for a light renovation of a property in reasonable structural condition to €60,000 to €120,000 or more for a full structural renovation of one in poor condition, with line items for roofs, rewiring, plumbing and finishes.
Send the same written scope to every trader. Citizens Advice suggests trying to get written quotes from at least 3 different traders, and says a quote should include:
Citizens Advice also explains that a quote is a fixed price while an estimate is a rough guess, so you might end up paying more on an estimate. Our guide to comparing builders' quotes on the same scope shows how to line them up.
Watch out
Citizens Advice warns to be cautious if one price is a lot lower than the others. It could mean the trader is not quoting for exactly the same work.

Mekozo's Costs & spending view shows the whole project so far, what is paid, what is agreed but still to pay, any line not yet priced, and how it compares with the money in your plan.
Try it free for 30 days, no card neededGive every line a status, and keep the statuses apart. Our guide to keeping agreed prices, invoices and payments apart explains why.
Then add the contingency as its own line. Size it to the risk, not to a habit. Jonathan sets a backup fund of 10 to 15% on top of labour, materials, permits and fees, and says that on an abandoned property he would hold back 20 to 25% of the build cost. For roof work, the Federation of Master Builders suggests around 10% to 15% when the old covering is stripped and hidden defects may appear (FMB, September 2026). Our guide to how much renovation contingency to allow shows how to set yours from your own list of risks.
Add up every line plus the contingency and compare it with your limit from step 1.
Our guide to renovating a house on a budget covers ways to bring the total down without creating surprises later.
Price and agree each variation or extra (change order) in writing before the work goes ahead, as our guide to variations and extras explains.
On the Operation Sicily villa
From the villa in Sicily. Before the work started at Jonathan's villa, bought for €21,500, he set out nine steps for budgeting a renovation: a structural survey first, must-haves before upgrades, labour, materials and permits and fees as separate lines, a backup fund of 10 to 15%, three to five quotes, timing, doing the preparation himself, negotiating, knowing which jobs to leave to professionals, and monitoring spending regularly so overspending shows early (Episode 14). The unknowns came anyway: undocumented drainage, electrical back boxes plastered over and forgotten, and roof sections that looked sound but were not, all needed unplanned spending, which is why he would now hold back 20 to 25% on an abandoned property. One test on the old cesspit decided whether a replacement costing upwards of €12,000 was needed; it passed (Episode 57). He keeps lines like these visible until they are settled, rather than hiding them inside one total.
Playing loads YouTube’s external player.
Watch directly on YouTube ↗For the wider plan, see our guide to setting the scope and budget before work starts. To set up the budget room by room and track it from estimate to paid, see the renovation budget tracker and how to build a whole-project budget in Mekozo.
This guide explains a budgeting method. It is not financial or tax advice; figures are published examples from the named sources, not quotes for your project.
Decide the most you can spend, write the scope room by room, list every cost line including fees, permissions and living costs, price each line from published figures and then written quotes, add a contingency, and compare the total with your limit. If it is over, cut or phase the scope rather than squeezing the contingency.
On its own line, outside every job, so you can see what is left after each new commitment. Size it to the risk: Jonathan Smith of Operation Sicily sets a backup fund of 10 to 15% on top of labour, materials, permits and fees. Our guide to renovation contingency shows how to size yours from a list of risks.
The usual gaps are professional fees, planning and building control fees, scaffolding and skips, making good after the trades, moving services, temporary living costs, storage, and changes made after work starts. Give each its own line so it cannot be absorbed into the total.
Citizens Advice suggests trying to get written quotes from at least 3 different traders before you decide. Jonathan Smith of Operation Sicily gets three to five quotes and prioritises quality and reliability over the cheapest price. Give every trader the same written scope so the quotes are comparable.
Fix the scope and specification before quotes, keep changes on a separate list with their own prices, pay in stages tied to finished work, and record every order and payment as it happens. Review the budget against what has been agreed and paid at least weekly while work is on site.
Real renovation experience and regional guidance from Operation Sicily.

There is no honest single figure for renovating a house. Here is how to build your own estimate from the size, the depth of work and the finish, using named, dated figures for each job.

Size your renovation contingency from the real unknowns in your project, keep upgrades out of it, and watch what is left after every change.

A kitchen budget is far more than the units. Here is every line to allow for, the published UK figures behind them, and how to keep the budget honest once work starts.