Planning a renovation

Renovating an old house: what to check and budget for first

An old house rewards patience. Check the structure, roof, damp, services and paperwork before you plan finishes, do the work in the right order, use materials that suit how the house was built and give the unknowns their own budget.

A builder repairing an old brick wall by hand
Contents

Key points

  • Start with the building, not the finishes: structure and roof, then damp and drainage, then electrics, plumbing and heating, and only then plaster, floors and kitchens.
  • Commission a full survey before you plan the work; the HomeOwners Alliance put a full structural survey at £500 to £1,500 (September 2026).
  • Historic England explains that traditional materials such as lime, stone, brick and timber absorb and release moisture, so sealing them with the wrong modern finish can trap damp.
  • The HSE says asbestos can be found in any building built before 2000; have it checked before drilling, sanding or demolition.
  • Give the unknowns their own budget line: the HomeOwners Alliance suggests around 10%, and Mekozo's founder, Jonathan Smith, who films his villa renovation on Operation Sicily, holds 20% to 25% on an abandoned property.

What to check first when renovating an old house

When renovating an old house, find out what the building needs before you plan what you want. Check the structure, roof, damp, drainage, electrics, plumbing and any hazardous materials first, then do the work in order: make it sound and dry, renew the services, and leave finishes until last. Give the unknowns their own budget.

Old houses are rarely expensive because of the kitchen you choose. They become expensive when a problem nobody priced appears halfway through, or when finished work has to be pulled out to reach something underneath. This guide covers the checks to make first, the order that protects your money, what old houses tend to hide and how to budget for it.

If you have not bought yet, our guide to what to look for when buying an old house covers the viewing, and our house survey checklist covers the survey.

The checks to make before you spend

Work through these before you draw up a scope or ask for a single quote. Each one either changes the order of work or adds a line to the budget.

CheckWhat you are looking forWho checks it
StructureCracks, movement, bulging walls, failed lintels, sagging floorsBuilding surveyor, structural engineer if needed
RoofSlipped or missing coverings, rot in timbers, leaks, failed flashingsSurveyor, roofer
Damp and drainageIts cause: gutters, downpipes, ground levels, leaks, past cement repairsSurveyor experienced with traditional buildings
TimberRot and active woodworm in roof, floors and joinerySurveyor, timber specialist
ElectricsAge and condition of wiring, fuse box, earthingRegistered electrician (inspection report)
Plumbing and heatingOld pipework, lead pipes, boiler age, water pressurePlumber, heating engineer
Waste waterMains connection or a private system, its condition and legalityDrainage specialist, local authority
Hazardous materialsAsbestos, lead paintAsbestos surveyor
PaperworkListing, conservation area, past approvals, what was built without permissionLocal authority, your conveyancer or local professional

The HomeOwners Alliance (updated 4 September 2026) puts a full structural survey at £500 to £1,500 and says it is the best way to find out whether there is damp, structural work or a rewire to do. Our guide to finding out when your house was built and researching its history can help you understand how it was built and what has been changed.

Watch out

The Health and Safety Executive says asbestos can be found in any building built before the year 2000. Have suspect materials checked by a professional before anyone drills, sands, strips or demolishes, and keep the survey result with your records.

The right order of work for an old house

The order matters more in an old house than a new one, because each stage can damage or undo the one after it. A sensible sequence:

  1. Make it safe and secure. Clear the house, make it lockable and deal with anything dangerous.
  2. Make it weathertight. Roof, gutters, downpipes, and windows or temporary boarding, so the building can start to dry.
  3. Fix the structure. Lintels, cracked walls, floors and roof timbers, with professional input where needed.
  4. Deal with damp at its cause. Drainage, ground levels, leaks and unsuitable past repairs, before any new plaster goes on.
  5. First fix services. Electrics, plumbing, heating and drainage while floors are up and walls are open.
  6. Insulation and ventilation. Chosen to suit how the walls handle moisture.
  7. Plaster and floors. Once services are in and tested, and walls are dry enough.
  8. Second fix and kitchens and bathrooms. Sockets, switches, sanitaryware and fitted units.
  9. Decorating and the garden. Last, so nothing is damaged by the trades before. Work out how much paint you need room by room.

Jonathan puts it plainly, from his own experience: starting finishes before the building is stable and dry is one of the most common renovation mistakes, and typically means repeating the finishing work later. Our home renovation checklist turns this order into a step-by-step plan, and our scope of works guide shows how to write it down so builders price the same job.

What old houses hide

Roofs and rainwater

Most damp and decay in an old house starts with water getting in from above or not getting away below. Blocked gutters, broken downpipes and slipped tiles are cheap to fix early and expensive to ignore. Our guide to what a new roof costs covers the bigger job if repairs are not enough.

Walls that need to breathe

Historic England (updated 24 June 2025) explains that most traditional buildings use natural materials such as earth, stone, brick and timber, which absorb, store and later release moisture. Lime mortars, renders and plasters keep those properties. It lists inappropriate past alterations and repairs, such as cement render that cracks, among the causes of gaps and moisture problems.

Tip

Before choosing plaster, render, paint or insulation for solid walls, ask what the wall is made of and how it dries. A cheaper modern product that traps moisture can cost more than it saves.

Timber problems

The HomeOwners Alliance quotes AXA Insurance at £1,000 to £2,000 for a specialist to treat dry rot, before the cost of repairing or replacing damaged timber, and £450 to £800 for professional woodworm treatment of the average loft in a three-bedroom home. It advises checking for sawdust around the holes, to tell an active infestation from an old one.

Electrics and plumbing

Old wiring is not automatically unsafe. Electrical Safety First ties the answer to the condition of the installation, and recommends owner-occupiers have it checked by a registered electrician every ten years. The Electrical Installation Condition Report tells you whether you face repairs, a partial rewire or a full one. Our guide to the cost to rewire a house covers published prices and the making good that follows.

Drainage and utilities

Rural and farmhouse properties may have a private waste water system rather than a mains connection, and some have no mains water or power at all. Find out what is there, whether it works and what replacing it would mean before you plan anything else. Jonathan's own breakdown warns that rural mains connections can be expensive, slow and in some cases unavailable.

Movement and structure

The HomeOwners Alliance notes that underpinning can cost up to £50,000 in the worst case, but that the Royal Institution of Chartered Surveyors estimates it is necessary in fewer than 10% of cases. Cracks need explaining by someone qualified, not guessing at.

Renovating an old farmhouse

A farmhouse brings the old house checks plus a few of its own. Add these to the list:

  • Water supply: mains, a well or a borehole, and its quality and reliability
  • Waste water: a private system's location, condition and whether it meets current rules
  • Power: the capacity of the connection, or what an off-grid system would need
  • Access: whether lorries, skips and a digger can reach the house
  • Outbuildings: what is permitted, what is safe and what you actually need
  • Land and boundaries: what is included in the sale and who maintains tracks and walls
  • Permission: whether past changes were approved, and what any change of use needs

Country rules

The method is the same everywhere: survey, make sound and dry, renew services, then finish. Permission rules differ, so they sit in these boxes.

In the UK (England and Wales)

GOV.UK says the Building Regulations 2010 cover the construction and extension of buildings, and lists alterations that might need building regulations approval, including replacing fuse boxes and connected electrics, installing a bathroom that involves plumbing, replacing windows and doors, replacing roof coverings, and installing or replacing a heating system. It adds that without approval you will not have the certificates of compliance you may need when you sell. Listed buildings and conservation areas have extra controls, so ask your local authority before work starts. Scotland and Northern Ireland have their own systems.

In Italy

Jonathan's cost breakdown advises sorting out the legal position before spending money on building work: building amnesty status, cadastral accuracy and planning compliance, confirmed in writing by your geometra. It notes that some maintenance is free building work, while other work needs a CILA, SCIA or a permission.

Elsewhere

Check with the local planning or building department where the property is. Do not assume one country's rules apply in another.

How to budget for an old house renovation

Example renovation finance: estimates, paid amounts and agreed costs still to payCosts & spending in Mekozo, close up: whole project £8,300 plus one unpriced item, paid £2,000, still to pay £3,500, £12,000 in the plan

Mekozo's Costs & spending view shows your renovation costs room by room or by piece of work, and flags anything not yet priced, so the essentials are budgeted before the finishes.

Try it free for 30 days, no card needed
  1. Start from the survey. List every defect it found as a line, even if you do not yet have a price.
  2. Group the work in order. Structure and roof, damp and drainage, services, then finishes.
  3. Separate must-do from nice-to-have. Price the essential work first and see whether it fits before adding improvements.
  4. Mark every line. Rough estimate, written quote or agreed price, so you can see how firm the total is.
  5. Price access and preparation. Scaffolding, skips, clearing and protection are real lines in an old house.
  6. Add a separate contingency. The HomeOwners Alliance suggests setting aside around 10% of the total for unexpected costs. Jonathan holds back 20% to 25% of the build cost on an abandoned property, from his own experience. Our guide to sizing a renovation contingency shows how to set yours from the risks you can name.
  7. Add living costs. Rent or accommodation while the house is not habitable, and travel if you are managing from a distance.
  8. Update it as you open up. Replace estimates with quotes, and move found problems out of the contingency into their own lines.

For an abandoned property in Sicily, Jonathan's own breakdown gives €60,000 to €120,000 or more for a full structural renovation of 80 to 120 square metres. See how to read cost per square metre figures without being misled. Our guide to how much it costs to renovate a house gives published UK ranges for the main jobs, and our full house renovation guide shows how to plan it room by room.

On the Operation Sicily villa

From the villa in Sicily. Jonathan bought his villa for €21,500 after it had been abandoned for decades. In Episode 14, he sets out the order he budgets in: a structural survey first, structure, plumbing and electrics before finishes, labour, materials, and permits and fees as separate lines, and a backup fund of 10% to 15%. The old house still had surprises. A single cesspit test decided whether the system could stay or cost upwards of €12,000 to replace; it passed (Episode 57). When the old kitchen window came out, the concrete lintels above it were found cracked by rusting rebar and had to be replaced (Episode 59). Every wall and ceiling was finished in mineral and lime based plaster so that all of them stay breathable. His cost breakdown now suggests holding back 20% to 25% of the build cost on an abandoned property, more than the backup fund first planned.

Playing loads YouTube’s external player.

Watch directly on YouTube ↗

Old house renovation checklist

  • Full survey done, and every defect listed
  • Asbestos checked before any drilling, stripping or demolition
  • Listing, conservation and past permissions checked
  • House made safe, secure and weathertight
  • Structural problems explained and repaired by qualified people
  • Damp traced to its cause and fixed before plastering
  • Electrics inspected, and a decision made on rewiring
  • Plumbing, heating and drainage checked and planned
  • Materials chosen to suit how the walls handle moisture
  • Budget grouped in order of work, with each line marked estimate, quote or agreed
  • Separate contingency set and living costs included
  • Finishes planned last

For the wider plan, see our guide to planning work on an older home and, if you are still deciding, our guide to buying a fixer-upper. To keep every line, quote and found problem in one place, see the renovation budget tracker and how to build a whole-project budget in Mekozo.

This guide explains a planning and budgeting method. It is not a survey or professional advice; have your own house inspected by qualified people.

Questions people ask

What should you do first when renovating an old house?

Find out what the building needs before deciding what you want. Get a full survey, make the house safe and weathertight, then deal with structure, roof, damp and drainage before electrics, plumbing and heating. Finishes such as plaster, flooring, kitchens and decorating come last, so they are not damaged by the work that comes before them.

How much does it cost to renovate an old house?

There is no reliable single figure, because condition decides the cost. In the UK, the HomeOwners Alliance (September 2026) puts a full structural survey at £500 to £1,500 and dry rot treatment at £1,000 to £2,000, says underpinning can reach £50,000 in the worst case, and suggests a contingency of around 10%. Price each package from quotes, starting with what the survey finds.

Do you need to rewire an old house?

Not automatically. Electrical Safety First's guidance on when a house should be rewired turns on the condition of the installation rather than its age. An Electrical Installation Condition Report from a registered electrician tells you whether it needs repairs, a partial rewire or a full one.

Should you use lime or cement on an old house?

Historic England explains that traditional walls of stone, brick, earth or timber with lime mortars and plasters absorb and release moisture. Cement renders and impermeable finishes can stop that drying and lead to damp and decay. Ask a surveyor or builder experienced with traditional buildings which materials suit your walls before you repair them.

Is it worth renovating an old house?

It can be, if the price you pay leaves room for the work the building needs and you have time to do it in the right order. Work out the full cost before you commit: the purchase, the essential repairs, the improvements you want and a contingency. If the essential work alone does not fit the budget, it is a warning sign.

Do I need permission to renovate an old house?

It depends on the work, the building and the country. In England and Wales, GOV.UK lists jobs such as replacing fuse boxes and connected electrics, replacing windows, roof coverings or a heating system among those that might need building regulations approval, and listed buildings and conservation areas have extra controls. Check with your local authority, or the equivalent body where the house is, before work starts.

Sources

  1. HomeOwners Alliance, UK house renovation costs · 4 September 2026
  2. Historic England, Properties of traditional building construction · 24 June 2025
  3. Health and Safety Executive, Asbestos · Checked 18 November 2026
  4. GOV.UK, Building regulations approval: when you need approval · Updated 20 October 2026
  5. Electrical Safety First, How often should a house be rewired? · Checked 18 November 2026
  6. Operation Sicily, How much does it really cost to renovate a house in Sicily? (2026 real-world breakdown) · 2026, checked 18 November 2026
  7. Operation Sicily, Episode 14: How to budget for a renovation in Italy · Checked 18 November 2026
  8. Operation Sicily, Episode 57: Testing a cesspit soakaway system · Checked 18 November 2026
  9. Operation Sicily, Episode 59: Removing a kitchen window with failed lintels · Checked 18 November 2026
  10. Operation Sicily, Episode 70: Lime plaster before and after at the abandoned villa · Checked 18 November 2026
Jonathan Smith opening the gate of the villa in Sicily

About the author:

Jonathan Smith is the founder of Mekozo and Operation Sicily. Jonathan bought an abandoned villa in Sicily and is rebuilding it on camera, every week. Mekozo is the app Jonathan built to keep that renovation's money in one picture.

Related from Operation SicilyHow much does it really cost to renovate a house in Sicily? (2026)

Real renovation experience and regional guidance from Operation Sicily.

Blog

Related reading

An empty room in an old house with peeling wallpaper and a damaged floor
Choosing a property

What to look for when buying an old house

Old houses are built differently from modern ones. What to check element by element, which permissions to confirm, the survey to ask for and how to turn what you find into a budget before you offer.

All Blog posts →

Bring the whole picture home.

Budgets, quotes, payments, documents and decisions in one place

30 days free. No card needed.

Monthly, with no annual plan. The Terms of membership set out the details.