Replacement windows cost depends on frame material, style, size, glazing and the work around each opening. Published figures, what moves the price, and how to turn a quote into a full budget.

Replacement windows cost depends on frame material, style, size, glazing and how many you fit. Energy Saving Trust says a set of A-rated windows for a semi-detached house typically costs around £4,800. Per window, FMB Home Picks listed a 900 x 1,200 mm casement at about £615 in uPVC, £800 in aluminium and £1,850 in timber (November 2026).
Those figures are starting points, not quotes. This guide shows what moves the price, what the published figures cover, and how to turn a window quote into a full budget that includes the work around each opening.
FMB Home Picks, the consumer site of the Federation of Master Builders, publishes per-window prices for common sizes. These are its figures, with prices stated as correct in November 2026 (FMB Home Picks):
| Window (frame) | Smaller size | Larger size |
|---|---|---|
| Casement, uPVC | £525 (600 x 900 mm) | £670 (1,200 x 1,200 mm) |
| Casement, aluminium | £700 | £870 |
| Casement, timber | £1,630 | £1,975 |
| Sash, uPVC | £805 (600 x 900 mm) | £915 (900 x 1,200 mm) |
| Sash, timber | £2,450 | £2,775 |
| Tilt and turn, uPVC | £670 (800 x 800 mm) | £835 (1,200 x 1,200 mm) |
| Tilt and turn, aluminium | £875 | £1,085 |
For a whole house, FMB Home Picks' guide to double glazing a three-bed house puts a semi-detached home with about nine windows at around £7,350 in uPVC, £12,850 in aluminium and £18,100 in timber.
Tip
Use published prices to check whether a quote is in the right range, not to set your budget. Your windows are a particular size, in a particular wall, at a particular height, and only a survey of your openings gives a price for them.
Six things move the price more than anything else:
Watch out
The opening is the part nobody can price from outside. Until the old frame is out, nobody knows for certain what the lintel and reveals look like. Keep a contingency line for it, rather than assuming every opening is sound.
A quote for "supply and fit" can leave out the jobs that make the room usable again. Give each of these its own line:
| Budget line | What it covers | Often missed |
|---|---|---|
| Windows | Frames, glass, handles, trickle vents | Colour or finish upgrades |
| Doors | Front, back and patio doors if done together | Thresholds and locks |
| Fitting | Removing old frames, fixing and sealing new ones | Second visit for one late window |
| Sills | Internal and external sills | Stone or marble sills ordered separately |
| Making good | Plaster around reveals, filling, decorating | Repainting the whole wall |
| Structure | Lintels or reveal repairs found once frames are out | Not known until opening up |
| Access | Scaffolding or a tower | Hire for longer than planned |
| Waste | Taking away old frames and glass | Skip if not included |
| Blinds and curtains | Fitting to new frame sizes | New tracks and poles |
| Paperwork | Certificate of compliance | Guarantee registration |
| Contingency | Unknowns | Everything above |
Our guide to the home renovation budget shows how a windows line sits inside a whole-house budget, and our guide to sizing a contingency shows how to set the reserve from your own risks.
The method is the same everywhere: list every window, price the same specification from several installers, and add the work around the openings. Rules and published prices differ by country, so they sit in the boxes below.
In the UK (England and Wales)
GOV.UK lists "replace windows and doors" among the jobs that might need building regulations approval. You do not need to apply yourself if the installer is registered with a competent person scheme: they can self-certify the work and give you a certificate within 8 weeks of completion, which shows up in solicitors' searches when you sell. GOV.UK adds that without approval you will not have the certificates you may need when you sell. If you live in a listed building or a conservation area, Energy Saving Trust advises checking with your local planning office before replacing windows. Scotland and Northern Ireland have their own building rules.
In the US
The Journal of Light Construction's 2025 Cost vs Value Report prices a project replacing 10 existing 3 x 5 foot double-hung windows with insulated, low-E vinyl windows at a national average job cost of $22,073, and the same job in wood at $26,781 (2025). These are national averages for a defined project; local permit rules and prices vary by state and city, so check with your local building department.
In Italy
Mekozo's founder, Jonathan Smith, who films his villa renovation on Operation Sicily, gives in his 2026 renovation cost breakdown his own estimates of €350 to €1,200 for a standard double-glazed window and €5,000 to €12,000 for window and door replacement on a typical 80 to 120 square metre property in western Sicily. They come from his own renovation, not an independent survey. Whether replacement windows need a building notification depends on the work and the property, so ask your geometra to classify the full scope before you order.

Mekozo puts quotes side by side, with what each includes and excludes and its timing, so you can see which installer has left out the sills, the making good or the waste before you agree a price.
Try it free for 30 days, no card neededTwo window quotes can differ by thousands simply because they describe different windows. Before comparing prices, make sure every installer is pricing the same job.
Tip
When one quote is much lower than the others, look first for a missing line before assuming it is better value. Our guide to comparing builders' quotes on the same scope shows how to line them up.
Not every old window needs replacing. Energy Saving Trust notes that if condensation forms between the panes, the double glazed unit can sometimes be replaced rather than the whole window, and that secondary glazing can be an option where original windows must be kept, for example in a listed building (Energy Saving Trust, May 2026). It says well installed and maintained double glazing can last 20 to 35 years.
Signs it may be time to replace, from the same source:
Ask installers for both prices where it applies: replacing the sealed units and replacing the whole window.
On a bigger renovation, windows sit in the middle of the order of work, not at the end:
Our home renovation checklist puts the whole order of work in sequence.
On the Operation Sicily villa
From the villa in Sicily. At Jonathan's villa, the old metal windows came out long before the new ones went in. The first one had no visible fixings and was set into concrete, and once it was out the lintel above it needed replacing too: one job became two (Episode 58). The openings were boarded up with timber frames and OSB to keep out the weather and rodents while the plasterers worked. For the new windows, he asked window companies across Italy, Poland and Germany for quotes. Price mattered but was not a deal-breaker, and he changed details along the way, from colours and glass to handles and opening directions. Everything was made to measure: thermally broken aluminium, tilt and turn opening, 33.1 laminated safety glass with a 16mm argon cavity and 70/35 solar control glazing. One window waited: the bathroom window was left until the wall tiles were done, with the installers coming back in a few weeks to fit it (Episode 88). Each of those is a line worth tracking: the lintels, the boarding, the specification changes and the return visit. His real-world breakdown of renovation costs in Sicily puts purchases like this in context.
Playing loads YouTube’s external player.
Watch directly on YouTube ↗For the wider plan, see our guide to planning the big jobs on an older house, what a new roof costs, and how to estimate the cost of renovating a whole house. To keep the windows inside a whole-house budget, with quotes, payments and the certificate in one place, see the renovation budget tracker and how to compare quotes on more than price in Mekozo.
This guide explains a budgeting method. Figures are published averages and starting prices from the named sources, not quotes; get written prices for your own windows.
FMB Home Picks puts double glazing a three-bedroom semi with about nine windows at around £7,350 in uPVC, £12,850 in aluminium and £18,100 in timber. Energy Saving Trust says a set of A-rated windows for a semi-detached house typically costs around £4,800. Your own figure depends on the number, size and style of the windows, so get quotes on one specification.
Doing them together usually means one survey, one set of access equipment and one round of making good, and installers price a whole order rather than single visits. It also lets you match frames, colours and handles. If the budget will not stretch, replace the windows in the worst condition first and keep the same specification for the rest.
In England and Wales, GOV.UK lists replacing windows and doors among the jobs that might need building regulations approval. You do not need to apply yourself if the installer is registered with a competent person scheme, who will give you a certificate within 8 weeks of completion. Scotland and Northern Ireland have their own rules.
Energy Saving Trust says high-quality double glazing that is installed properly and well maintained can last 20 to 35 years, and sometimes longer. Condensation between the panes, draughts or windows that are hard to open are signs that units or windows may need replacing.
Often, yes. If the frame is sound and only the sealed unit has failed, which shows as misting between the panes, Energy Saving Trust notes that the double glazed unit can be replaced rather than the whole window. It is a smaller job, so ask for both prices.
Real renovation experience and regional guidance from Operation Sicily.

A new roof costs far more than the tiles. Published figures for pitched and flat roofs, what drives the price, the extras to price separately and how to hold a contingency for what stripping reveals.

What a good builder's quote includes, what to ask every builder to send back, and how to compare quotes like for like rather than by the total.

An old house rewards patience. Check the structure, roof, damp, services and paperwork before you plan finishes, do the work in the right order, use materials that suit how the house was built and give the unknowns their own budget.