Planning a renovation

New roof cost: what to budget and what drives it

A new roof costs far more than the tiles. Published figures for pitched and flat roofs, what drives the price, the extras to price separately and how to hold a contingency for what stripping reveals.

A roofer at work on a tiled roof behind scaffolding and safety netting
Contents

Key points

  • Which? Trusted Traders surveyed in November 2025 priced a new tiled roof on an average three-bedroom house at £7,000 to £21,000, excluding VAT.
  • Size, pitch, complexity, covering material, access and what is found under the old covering drive the price most.
  • Labour can make up around 40% of a new roof budget, according to the Federation of Master Builders (November 2025).
  • Hold a contingency: the FMB suggests around 10% to 15% when the old covering is stripped and hidden defects may appear (September 2026).
  • In England and Wales, replacing roof coverings on pitched and flat roofs is listed among the jobs that might need building regulations approval.

How much does a new roof cost?

A new roof's cost depends on its size, shape, covering, access and what is found under the old covering. In a Which? survey of trusted roofers in November 2025, a new tiled roof on an average three-bedroom house cost £7,000 to £21,000 excluding VAT. A new felt flat roof on a single garage was £1,400 to £3,500.

The range is wide because no two roofs are the same. This guide shows what the published figures cover, what moves the price, the extras that quotes often leave out, and how to build a roof budget with a contingency for what stripping the old covering reveals.

Published new roof prices

These are the most useful published figures, each from a named source with its date. Treat them as a check on quotes, not as your budget.

JobPriceSource
New tiled roof, average three-bedroom house£7,000 to £21,000 (excl. VAT)Which?, survey of Trusted Traders, November 2025
New felt flat roof, single garage (6 x 3 m), existing structure kept£1,400 to £3,500 (excl. VAT)Which?, November 2025
New flat roof, single garage, new boards and EPDM or PVC£1,950 to £4,000 (excl. VAT)Which?, November 2025
Strip and retile, two-bedroom terrace (about 60 m²)£7,500 to £12,500FMB, November 2025
Strip and retile, three-bedroom semi (about 80 m²)£10,000 to £15,000FMB, November 2025
Strip and retile, four-bedroom detached (about 120 m²)£15,000 to £20,000FMB, November 2025

Sources: Which? (article updated 21 October 2026) and the Federation of Master Builders' new roof cost guide, which quotes figures from a firm of chartered surveyors. Which? adds that prices are likely to be at the upper end of the scale in London and the South East.

Tip

Roofers often give an estimate rather than a fixed quote, because, as Which? notes, they may not be able to see the condition of the structure until the tiles or slates are off. Ask how any extra work found will be priced before you agree.

What drives the cost of a new roof

  1. Size. More area means more stripping, underlay, battens and covering.
  2. Pitch and complexity. The FMB lists hips, valleys, abutments and dormers as features that add cutting, flashing and finishing work.
  3. Covering material. Concrete tiles are usually cheapest; clay tiles, natural slate and metal cost more (see the table below).
  4. Access and scaffolding. The FMB says scaffolding hire can cost from £400 a day, and a scaffold on a pavement or road usually needs a licence from the council.
  5. Labour and location. The FMB says labour can make up around 40% of a new roof budget, and areas with higher demand tend to have firmer prices.
  6. What is under the old covering. Rotten decking, split rafters and damaged fascias only show once the roof is stripped.

Roof covering costs compared

The FMB's roofing materials guide (prices updated October 2026) gives supply-only examples. They exclude labour, battens, underlay, fixings, scaffolding and waste.

CoveringSupply-only exampleTypical use
Concrete interlocking tilesAbout £25 per m²Modern homes, extensions
Plain clay tilesAbout £1.97 each, around 60 per m²Victorian and Edwardian homes, cottages
Natural slateAbout £4.74 per 500 x 250 mm slatePeriod properties, heritage work
Fibre-cement slateAbout £42 per m²A lighter slate-style finish
EPDM membrane kitAbout £31.55 per m²Flat roofs, dormers, garages

Watch out

The cheapest tile does not always make the cheapest roof. The FMB points out that a small plain tile can need around 60 pieces per square metre against 10 or 11 for a large interlocking tile, so more pieces have to be positioned, cut and fixed.

The extras a roof quote can leave out

Ask every roofer to confirm, line by line, what is included. The FMB suggests checking for these:

LineWhat it covers
Stripping and disposalRemoving the old covering, skip or licensed waste carrier
Underlay, battens and fixingsBreathable membrane, graded battens, nails and clips
Ridges, hips, verges and valleysDry-fix or mortar systems at every junction
FlashingsAround chimneys, rooflights and walls
ScaffoldingHire period, any licence, temporary weather protection
InsulationUpgrading while the roof is open
Gutters, fascias and soffitsReplacing them while the scaffold is up
Roof windowsNew or replacement rooflights and flashing kits
Structural repairsDecking, rafters or battens found to be damaged
Guarantees and VATProduct warranties, workmanship guarantee, VAT shown

Doing gutters, fascias and insulation while the scaffold is already up avoids paying for access twice. Our guide to comparing builders' quotes on the same scope shows how to line up quotes so the same lines are in each.

Country rules and prices

The method is the same everywhere: describe the roof, get quotes on the same specification, price the extras and hold a contingency. The rules and published prices differ, so they sit in these boxes.

In the UK (England and Wales)

GOV.UK lists "replace roof coverings on pitched and flat roofs" among the jobs that might need building regulations approval. Which? says significant roof work must either be done by a roofer registered with a roofing competent person scheme, who can self-certify the work, or you must notify your local authority's building control before work begins. The FMB adds that approval may be needed if structural alterations are made, a large part of the roof is replaced, or the new covering is 15% or more heavier than the old one. Listed buildings and conservation areas can restrict materials and colours. Scotland and Northern Ireland have their own building rules.

In the US

The Journal of Light Construction's 2025 Cost vs Value Report gives a national average job cost of $31,871 for its defined asphalt shingle roof replacement project, and $51,865 for the metal roof version (2025). Permits and prices vary by state and city, so check with your local building department.

In Italy

Mekozo's founder, Jonathan Smith, who films his villa renovation on Operation Sicily, gives in his 2026 renovation cost breakdown his own estimate of €6,000 to €18,000 for roof repair or replacement on a typical 80 to 120 square metre property in western Sicily, and €120 to €170 as a roofer's day rate. These are his figures from his own renovation, not an independent survey, so treat them as one owner's experience. The breakdown advises asking which parts need repair or replacement, how access and scaffolding will work, and comparing the waterproofing, insulation and drainage included rather than the headline price. Ask your geometra whether the work needs a building notification.

Repair or replace?

Which? says repairing a roof is almost always much more cost effective than replacing it, unless the repair is unlikely to solve the problem or will not last. A new roof may make sense where there is structural damage or extensive leaks. Its survey of Trusted Traders (November 2025, excluding VAT) gives some typical repair prices:

RepairPrice
Replace one to six broken or missing standard tiles£75 to £400
Replace a single ridge tile£80 to £300
Clean all gutters, front and back£75 to £350

Signs to have the roof looked at, from the same source:

  • Damp, staining on walls or ceilings, or leaks
  • Missing, slipped or cracked tiles
  • On a flat roof: splits at the edges, lumps or sagging
  • Gaps at the ridge, valleys or chimney
  • Daylight visible through the roof

Watch out

Do not climb onto the roof to inspect it yourself. The FMB cites the Health and Safety Executive, which says almost one in five deaths in construction work involves roof work. A competent roofer can inspect safely.

How to budget for a new roof, step by step

Costs & spending in Mekozo, close up: whole project £8,300 plus one unpriced item, paid £2,000, still to pay £3,500, £12,000 in the plan

Mekozo's Costs & spending view shows the roof's costs so far, what is paid and still to pay, any line not yet priced, and the money in your plan, so extra work found under the tiles has somewhere to go.

Try it free for 30 days, no card needed
  1. Get the roof inspected. Ask at least three roofers to look at it, as Which? suggests, and to say whether it needs repair or replacement.
  2. Write one specification. Covering, underlay, battens, ridge and hip system, flashings, insulation, gutters and any rooflights.
  3. Ask for itemised quotes. Every line from the extras table, with VAT shown.
  4. Price access. Scaffolding hire period and any licence.
  5. Add a contingency. The FMB suggests around 10% to 15% when the old covering is stripped. Our guide to sizing a contingency shows how to set it from your own risks.
  6. Agree how extras are priced. A day rate, a rate per square metre of decking, or a fixed price per rafter, in writing before work starts.
  7. Agree the payment stages. Which? says to agree a payment schedule before work starts, and to pay the last instalment only when you are satisfied and have the paperwork.
  8. Plan for the weather. Ask what happens in prolonged bad weather and how the roof is protected overnight.

Tie each payment to a stage you can check, such as the scaffolding up, the old covering stripped and the new roof finished, as our guide to how to pay a contractor explains.

On the Operation Sicily villa

From the villa in Sicily. When Jonathan viewed the villa he went on to buy, there was no staining on the ceilings, which suggested the roof was sound (Episode 9). It is a flat roof of about 100 square metres, reached through a doorway at the top of the tower that had been walled up and had to be knocked through (Episode 42). The roof had to be waterproofed before any solar panels could go up, so he bought a two-part liquid system: a fibre reinforced waterproof membrane and a reflective coat on top, two 20kg tubs (Episode 75). Even so, his cost breakdown records that roof sections which appeared sound turned out not to be, and needed unplanned spending. That is why a roof budget needs a contingency even when the roof looks fine from inside.

Playing loads YouTube’s external player.

Watch directly on YouTube ↗

New roof budget checklist

  • Roof inspected by at least three roofers
  • Repair or replace decided on their findings
  • One specification written for every quote
  • Quotes itemised, including stripping, waste and scaffolding
  • Gutters, fascias, insulation and rooflights decided while the scaffold is up
  • Building regulations, listed status and conservation rules checked
  • Contingency set for what stripping reveals
  • Extra work pricing and payment stages agreed in writing
  • Guarantees and certificates on the list before the final payment

For the wider plan, see our guide to planning the big jobs on an older house, what replacement windows cost, and what to check first when renovating an old house. To fit the roof into a home renovation budget and keep it there, see the renovation budget tracker and how to build a whole-project budget in Mekozo.

This guide explains a budgeting method. Figures are published averages and examples from the named sources, not quotes; get written prices for your own roof.

Questions people ask

How much does a new roof cost on a three-bedroom semi?

In a survey of Which? Trusted Traders in November 2025, replacing the whole tiled roof on an average three-bedroom house cost £7,000 to £21,000 excluding VAT, with prices likely to be at the upper end in London and the South East. Where your roof falls in that range depends on its size, pitch, covering and scaffolding, so compare at least three itemised quotes on the same specification.

What adds the most to the cost of a new roof?

The roof's size, pitch and complexity, the covering you choose, and scaffolding usually move the price most. Hips, valleys, dormers, chimneys and rooflights all add cutting and flashing work. Repairs to battens, rafters or decking found once the old covering is off can add more.

Do I need building regulations approval for a new roof?

In England and Wales, GOV.UK lists replacing roof coverings on pitched and flat roofs among jobs that might need approval. Which? says significant roof work must either be done by a roofer registered with a roofing competent person scheme, who can self-certify, or you must notify building control before work begins. Scotland and Northern Ireland have their own rules.

Is it cheaper to repair a roof or replace it?

Which? says repairing is almost always much more cost effective than a new roof, unless the repair is unlikely to solve the problem or last. A new roof may make sense when there is structural damage or extensive leaks. Have the roof inspected and get more than one opinion before deciding.

How much contingency should I allow for a new roof?

The Federation of Master Builders suggests around 10% to 15% when the existing covering is stripped and hidden defects may be uncovered. Roofers may give an estimate rather than a fixed quote for the same reason, so ask how any extra work will be priced.

Sources

  1. Which?, How much do roof repairs cost? (survey of 11 Which? Trusted Traders, November 2025) · 21 October 2026
  2. Federation of Master Builders, New roof cost UK: complete homeowner guide · 5 November 2025
  3. Federation of Master Builders, Roofing materials cost UK: which roof covering offers the best value? · 30 September 2026, prices updated October 2026
  4. GOV.UK, Building regulations approval: when you need approval · Checked 18 November 2026
  5. Health and Safety Executive, Roof work · Checked 18 November 2026
  6. Journal of Light Construction, 2025 Cost vs Value Report · 2025
  7. Operation Sicily, How much does it really cost to renovate a house in Sicily? (2026 real-world breakdown) · 2026, checked 18 November 2026
  8. Operation Sicily, Episode 75: Second fix electrics and marking out a rainwater tank · Checked 18 November 2026
  9. Operation Sicily, Episode 42: Opening up the tower room to the roof · Checked 18 November 2026
  10. Operation Sicily, Episode 9: How much I paid for my villa in Sicily · Checked 18 November 2026
Jonathan Smith opening the gate of the villa in Sicily

About the author:

Jonathan Smith is the founder of Mekozo and Operation Sicily. Jonathan bought an abandoned villa in Sicily and is rebuilding it on camera, every week. Mekozo is the app Jonathan built to keep that renovation's money in one picture.

Related from Operation SicilyHow much does it really cost to renovate a house in Sicily? (2026)

Real renovation experience and regional guidance from Operation Sicily.

Blog

Related reading

An old green wooden window with peeling paint in a white wall
Planning a renovation

Replacement windows cost: what to budget and why

Replacement windows cost depends on frame material, style, size, glazing and the work around each opening. Published figures, what moves the price, and how to turn a quote into a full budget.

A builder repairing an old brick wall by hand
Planning a renovation

Renovating an old house: what to check and budget for first

An old house rewards patience. Check the structure, roof, damp, services and paperwork before you plan finishes, do the work in the right order, use materials that suit how the house was built and give the unknowns their own budget.

All Blog posts →

Bring the whole picture home.

Budgets, quotes, payments, documents and decisions in one place

30 days free. No card needed.

Monthly, with no annual plan. The Terms of membership set out the details.