Jonathan Smith opening the iron gates of the villa in Sicily
The founder of Mekozo

Don't take my word for it. Watch me work.

I'm Jonathan Smith. I bought an abandoned villa in Sicily and I'm rebuilding it myself, on camera, every week. Mekozo is the app I built to keep that renovation's money in one picture.

Watch the journey
Try Mekozo free

30 days free. No card needed.

01 / 10Where it began: the iron gates of a villa nobody wanted.

As featured in

My story has been featured across the UK national and regional press.

The receipts

Figures from operationsicily.com, November 2026.

paid for the villa, listed at €100,000
€21,500
empty before I collected the keys
20 years
weekly episodes, filmed by me
92
views on YouTube
8.2M
people following the build
73,700+
Why I film everything

Anyone can say they understand renovation. I'd rather show you.

Every quote, every delivery, every setback and every small win from this villa is on film, one honest episode at a time. You can watch me get it right, and watch me get it wrong. Judge the person building Mekozo by the work, not by a sales page.

Watch me work on YouTube
Before the villa

From Manchester to Mazara del Vallo.

“I wanted a challenge. I wanted to learn new things, spend real time outdoors, meet different people, and build something that actually mattered. Moving to Sicily answered all of it at once.”

Jonathan Smith

I'm originally from near Manchester. For over fifteen years I worked in hospitality, and for a long time I loved it. Eventually the routine set in: the same cycle, the same conversations, the same track that someone else had laid out.

The search started online, mostly out of curiosity. I looked at Greece first, then Portugal and Spain. Then Sicily came up and something stopped me. It felt mysterious in a way I hadn't expected, and it still had its own everyday life, away from the crowds.

I looked at the €1 home schemes too, but those houses were gutted, structurally compromised and came with renovation bills far bigger than the price. Then I found the villa.

The villa's round stone tower and front wall, with Jonathan working at the top of a ladder
01 · The listing

A villa nobody wanted for five years.

It had been empty for twenty years and on the market at €100,000 for five of them. I offered €20,000, expecting a negotiation. The agent called back the same day: €21,500.

A large detached villa near Mazara del Vallo, with a round stone tower and around 1,000 square metres of land, not far from the sea.

“It's insane and it's a big detached villa. You wouldn't be able to get a garage for that in Manchester.”

Jonathan Smith
Read the villa's history
The abandoned dining room as found, with a long table, old chairs and closed shutters
02 · The reality

No electricity. No water. No gas. No drainage.

Collecting the keys felt like a victory. Walking back in five weeks later felt like something else. The previous owners' furniture was still there from twenty years before.

Every window needed replacing. Every floor. Every pipe. It was a full rebuild, not a renovation in the traditional sense.

“The sheer scale of the work ahead hit me like a ton of bricks. That was the moment I thought: have I completely lost the plot?”

Jonathan Smith
Watch the day I walked back in
Jonathan kneeling to lay large floor tiles inside the villa
03 · The work

One man. One phone. No builders. No TV crew.

I had no professional building experience. I left school with basic GCSEs. What I had was a tight budget, a willingness to learn and a plan to do as much of the work myself as I could.

The water well, the electrics, the walls, the windows, the terraces, the floors. Some weeks bring a breakthrough. Other weeks, the plumbing wins. I film all of it.

“A finished floor can make a job look straightforward; the episode shows the planning, cuts and mistakes that came first.”

Jonathan Smith
Start from Episode 1
Jonathan inside the renovated villa beside a stone wall and arched doorway
04 · The problem nobody films

The cuts and the bruises are easy to see. The money isn't.

Quotes arrived in messages. Prices ended up on scraps of paper. Deposits felt like progress, then the extras arrived. Keeping the whole picture together became a job of its own.

So I built the tool I needed: one place for every quote, price, payment and document, so the total is never a surprise. That tool is Mekozo.

“I bought a €21,500 villa in Sicily. I needed to stop it becoming a €200,000 project. Mekozo is the app I built to keep the plans and the money in one picture.”

Jonathan Smith
See how Mekozo works
Mekozo on the build

The villa is where Mekozo was born, and where it works hardest.

I built Mekozo for my own villa renovation here in Sicily. Every quote, price, payment and document from the build goes into it, so I can see the full total at any time, not just the deposit I paid last week.

When a job grows, an extra arrives or the plan changes, it is the first place I look to see what that does to the money. The camera shows the work. Mekozo shows what the work is really costing.

  • Every quote in one listSide by side, on the same scope, so the cheapest is not the only thing I see.
  • Estimated, agreed, paid, still to payThe four numbers that keep a €21,500 villa from becoming a €200,000 project.
  • Documents with the jobReceipts, guarantees and photos kept with the work they belong to.
  • The family can see it tooInvite the people you are building it for, at no extra cost.
Try Mekozo free

30 days free. No card needed.

See every feature
MEKOZO's costs screen for an example renovation, showing estimated, agreed, paid and still to pay
Mekozo's costs screen, shown with an example project.
The villa and its round stone tower in evening light, seen across the garden under the pine trees
The house before me

I thought I was starting a renovation. I'd stepped into a story.

From local records and conversations with my neighbours, the villa was built in the late 1960s by a Sicilian farming family: part farmhouse, part modernist experiment, with its curved front, tall tower and sweeping arches. Some time in the 1990s it fell silent. Shutters were rolled down, furniture left in place, documents boxed and stacked.

Among the dust I found a stack of carefully kept letters and certificates. One name kept appearing: Antonia Di Gregorio, born in Mazara del Vallo in 1899, a teacher who spent her life in small village schools, through war and rebuilding. I still don't know exactly how she was connected to the house, but her story has become part of it for me.

“Plates on the sideboard, chairs around the table, clothes, books, photographs, as if somebody had locked the door one day and never come back.”

Jonathan Smith
Read the villa's history
What the work has involved

Everything, by hand, on camera.

What the villa taught me

The lessons that became Mekozo.

The price is not the budget

“The €21,500 purchase price made my project possible. It did not make the work free. A purchase budget and a renovation budget are different things.”

Jonathan Smith

That is why Mekozo keeps what you have agreed, paid and still have to pay beside what you expected to spend.

The renovation budget tracker

Nothing arrives in one place

“Most suppliers don't have websites. A lot of it involves driving around, asking locals, and gradually building up a network of who stocks what and where.”

Jonathan Smith

Quotes, prices and contacts came from everywhere. Mekozo keeps them with the job they belong to.

See how Mekozo works

The plan keeps changing

“The sequence changes as each job reveals the next problem.”

Jonathan Smith

A renovation is never one fixed plan. Mekozo lets the plan change without losing track of the money.

Planning a renovation

“You don't need perfect timing, you don't need to be an expert, and you definitely don't need unlimited money. You just need to start.”

Jonathan Smith, founder of Mekozo and Operation Sicily
Who it's for

A home for my boys, and a different kind of childhood.

I have two sons, Hugo and Eithan. The plan is for the whole family to move to Sicily for good once the villa is habitable. One of the reasons behind all of this was giving the boys more time outdoors, learning how things actually work.

About Jonathan, in full

“Hugo just loves being outside, pottering around, climbing the trees, helping out and being a general kid. It's lovely to see.”

Jonathan Smith
Where the villa is now

Still being written.

  1. 29 May 2024Operation Sicily begins. The keys, an abandoned villa and a camera.
  2. NowInterior finishing, with the kitchen and bathroom going in.
  3. 25 December 2026Fully habitable inside, and my first night staying at the villa since buying it.
  4. June 2027The roof terrace, wooden spiral staircase, gardens and pool.
See the latest episode
Operation Sicily

Go deeper on Operation Sicily

The full story lives on operationsicily.com.

Visit operationsicily.com

Bring the whole picture home.

Budgets, quotes, payments, documents and decisions in one place

30 days free. No card needed.

Monthly, with no annual plan. The Terms of membership set out the details.