A kitchen renovation budget covers far more than the units: worktops, appliances, fitting, plumbing, electrics, flooring, decorating, waste and a contingency. In UK prices collected by Which?, 12 kitchen units alone ranged from about £1,500 to £9,000, and labour adds roughly 20% to 30% of the final cost. List every line, price it, then add a contingency.
No single published total fits every kitchen, because the size, any change of layout and the quality you choose move the figure so far. That is why the honest answer is a figure built line by line from your own kitchen.
This guide answers how much a new kitchen costs, gives you the full list of lines with the published UK figures behind them, and shows how to keep the budget honest once work starts.
How much does a new kitchen cost?
How much it costs to renovate a kitchen depends on three things: how much of the layout changes, the quality of the units and worktops, and how much work sits around them. Which? bases its prices on a 15 square metre, 12-unit kitchen in a semi-detached house, and its figures show where the money goes (Which?, April 2026):
- Units: about £1,500 to £9,000 for 12 units across seven retailers, at prices collected in May 2025, including VAT.
- Appliances: from about £50 for a microwave to £290 for a Best Buy washing machine, each, at prices listed in November 2025.
- Labour: roughly 20% to 30% of the final spend if you do none of the installation yourself, based on Building Cost Information Service (BCIS) data.
- Everything around the units: one kitchen retailer told Which? to expect around 30% of the budget to go on plumbing, flooring, electrics and other expenses.
So a price for a new kitchen only means something once you know which of these lines it covers. The rest of this guide builds your own figure line by line, which is the only honest answer to how much your kitchen will cost.
Kitchen renovation budget: every line to include
| Line | What it covers | Often missed |
|---|
| Units | Base, wall and tall units, doors, handles, plinths, end panels | Cornices, pelmets, filler pieces |
|---|
| Worktops | Worktop run, upstands, cut-outs | Joints, edging, templating fees |
|---|
| Splashback | Tiles, glass or stone | Fitting and sealing |
|---|
| Sink and tap | Sink, tap, waste and trap | Boiling water tap supply |
|---|
| Appliances | Oven, hob, extractor, fridge-freezer, dishwasher, washing machine | Installation and removal of old ones |
|---|
| Fitting | Assembling and fixing units, worktops, appliances | Second visit for snags |
|---|
| Plumbing | New or moved water and waste pipes | Moving the sink to an island |
|---|
| Electrics | Sockets, lighting, appliance circuits | New circuits, consumer unit work |
|---|
| Gas | Hob connection or moving the supply | Gas Safe engineer visit |
|---|
| Extraction | Extractor and ducting to outside | Drilling through a solid wall |
|---|
| Flooring | Floor finish and preparation | Levelling the subfloor |
|---|
| Walls and ceiling | Plastering, making good, decorating | Repairs behind the old units |
|---|
| Waste | Skip or waste removal | Disposing of old appliances |
|---|
| Living costs | Eating out, temporary kitchen | Weeks longer than planned |
|---|
| Contingency | Unknowns | Everything above |
|---|
Step 1: decide the scope before you price it
The biggest cost driver is not the units; it is how much you change. Write down which of these apply:
- Same layout, new units. Plumbing and electrics stay roughly where they are.
- New layout. The sink, hob or appliances move, so pipes, waste, gas and circuits move too.
- Structural change. A wall comes out, an opening is made or a window moves.
Watch out
Moving a sink a short distance can mean a new waste route through a wall or floor. Moving a hob can mean a new gas run and a new extractor route. Price the services for the new layout, not the old one.
Our guide to writing a renovation scope shows how to describe the job so every quote covers the same work.
Step 2: price each line
Units
Which? secret-shopped seven kitchen retailers in May 2025 for a 12-unit kitchen, including handles, cornices, plinths, pelmets and end panels but not worktops, sinks, taps or appliances. Prices, rounded to the nearest £500 and including VAT and sale discounts, ranged from about £1,500 to £9,000 depending on the retailer and range (Which?, April 2026). Some of those prices included discounts of 50% or more, so the same kitchen can cost very different amounts depending on when you buy.
Appliances
Which? lists starting prices for appliances it rates as Great Value or Best Buys, as listed online in November 2025:
| Appliance | Great Value from | Best Buy from |
|---|
| Single oven | £160 | £190 |
|---|
| Hob | £100 | £200 |
|---|
| Cooker hood | £140 | £230 |
|---|
| Microwave | £50 | £50 |
|---|
| Fridge-freezer | £180 | £180 |
|---|
| Washing machine | £240 | £290 |
|---|
These are entry points, not averages. Built-in and premium appliances cost more, so price the exact models you want.
Fitting and labour
If you do no part of the installation yourself, Which? says labour makes up approximately 20% to 30% of the final spend, based on Building Cost Information Service (BCIS) data. It adds that labour costs tend to be higher for bespoke kitchens, which need more precision. Ask every fitter to break the price down: units, worktops, appliances, plumbing, electrics, tiling and making good.
Everything around the units
One kitchen retailer told Which? to expect around 30% of a kitchen budget to go on plumbing, flooring, electrics and other expenses. Whatever the share in your kitchen, give each of those its own line so it cannot be squeezed out of the total.
In the UK (England and Wales)
GOV.UK lists jobs that might need building regulations approval, including replacing fuse boxes and connected electrics, installing or replacing a heating system, and replacing windows and doors. You do not need to get approval yourself if the work is done by someone registered with a competent person scheme. For gas, Gas Safe Register says only Gas Safe registered engineers can legally do gas work, whether on appliances, flues or pipework. Scotland and Northern Ireland have their own building rules.
Step 3: turn the list into a budget with contingency
Once every line has a figure, mark how solid it is:
- Estimate. Your own guess or a published figure.
- Quote. A written price for that line from a supplier or trade.
- Agreed. A quote you have accepted.
- Paid. Money that has gone.
Then add a contingency for the unknowns: what is behind the old units, the state of the floor and walls, and anything still not decided. Our guide to renovation contingency shows how to size it from your own risks rather than a guess.
Tip
A quote for "supply and fit kitchen" is not a budget. Ask for the same breakdown from every fitter so you can compare like for like. Citizens Advice suggests a quote should have a fixed total, a breakdown of the work and materials, separate costs for each part, how long the price is valid and whether it includes VAT.
Worked example: how a kitchen budget is laid out
This shows the structure, not a recommended spend. Replace every figure with your own quotes.
| Line | Figure | Status |
|---|
| Units (12) | Your chosen range | Quote |
|---|
| Worktop and upstands | Your chosen material | Quote |
|---|
| Sink, tap, waste | Your choice | Estimate |
|---|
| Appliances | Six appliances priced by model | Estimate |
|---|
| Fitting | From fitter's breakdown | Quote |
|---|
| Plumbing changes | From plumber | Quote |
|---|
| Electrics and lighting | From electrician | Quote |
|---|
| Gas connection | From Gas Safe engineer | Quote |
|---|
| Extractor ducting | From fitter or builder | Unknown |
|---|
| Flooring and preparation | Supplier and fitter | Quote |
|---|
| Tiling and decorating | From trades | Estimate |
|---|
| Waste removal | Skip or collection | Estimate |
|---|
| Living costs during the work | Your weekly estimate times the weeks | Estimate |
|---|
| Contingency | Sized from your risks | Set aside |
|---|
Watch out
A line marked "unknown" is not zero. Leave it visible in the total until you have a figure, so the budget does not look smaller than it is.
Keeping a kitchen renovation on budget
The most reliable ways to protect the budget are about decisions, not discounts:
- Keep the layout if you can, so services stay where they are.
- Fix the specification before you get quotes, including appliance models and worktop material.
- Order long-lead items early and record each order and payment the day it happens. An invoice is the bill for agreed work; record it, then the payment against it, as our guide to keeping agreed prices, invoices and payments apart shows.
- Separate upgrades from unknowns. A better worktop is a choice to price, not a call on the contingency.
- Price changes before they happen. Every change after ordering costs more than the same decision made before.
Track every order and payment as it happens. Use the kitchen renovation checklist to put the jobs in order.