Planning a renovation

DIY home renovation: what to do yourself and what to hire

A practical way to split a renovation between your own hands and qualified trades: which jobs suit DIY, which need a professional by law or by sense, and how to plan the mix.

A room mid-renovation with ladders, tools and materials on a dusty floor
Contents

Key points

  • DIY suits jobs that are low risk, easy to put right and do not need sign-off: stripping out, preparation, painting, simple carpentry and garden work.
  • Leave gas, most electrics, structural changes and asbestos to qualified people: in Great Britain gas work must be done by a Gas Safe registered engineer.
  • Work that needs building regulations approval still needs it when you do it yourself, and without approval you may lack the certificates you need to sell.
  • Plan DIY like a trade: give every job a scope, a date, a materials list and a budget line, including tools and the time you will lose.
  • The best mix is often hybrid: you do the preparation and finishing, qualified trades do the risky middle.

A DIY home renovation works best when you do the jobs that are low risk, easy to put right and need no sign-off, such as stripping out, preparation, painting and simple carpentry, and hire qualified trades for gas, most electrics, structural work and anything that might contain asbestos. Plan your own jobs exactly as you would a trade's.

This guide gives you a simple test for each job, a table of what usually suits DIY and what does not, and a way to plan the mix so your own work does not become the thing that holds everyone else up.

Can you renovate a house yourself?

Yes, a lot of a renovation can be done by a careful, patient homeowner, and many people do far more than they expected once they start. But "yourself" rarely means everything. Even the most hands-on renovations usually rely on qualified people for a few jobs, either because the law says so or because a mistake would be dangerous or expensive to undo.

The useful question is not "DIY or builder?" for the whole house. It is "who should do this job?" for each line of the plan.

The four-question test for any job

Ask these four questions about each job before you put your name against it.

  1. Is it legal for me to do it? Some work must be done by a registered or licensed person. In Great Britain, gas is the clearest example.
  2. Does it need approval or a certificate? If the work needs building regulations approval, it still needs it when you do it yourself.
  3. What happens if I get it wrong? A badly painted wall costs a weekend. A badly made electrical joint, a leaking pipe inside a wall or a removed support can cost far more, and can hurt someone.
  4. Can I do it in the time the plan allows? Your hours are part of the schedule. A job that takes you four weekends can hold up three trades waiting to follow you.

If the answer to the first two is "no" or "not sure", the job goes to a qualified person. If the third and fourth answers worry you, think about a trade, or a hybrid where you do the preparation and they do the skilled part.

Tip

Write the answers down beside each job. When you come back to the plan in three months, you will remember why you decided as you did.

What to do yourself and what to leave to the trades

This table is a starting point, not a rulebook. Your own skills, the age of the house and the rules where you live all change the answer.

JobUsually suits DIY?Why
Clearing, stripping out, removing old fittingsOften yesLow skill, but check for asbestos first in older homes
Filling, sanding, preparing surfacesYesTime-consuming, easy to redo, saves trade hours
Painting and decoratingYesLow risk and easy to put right
Fitting shelves, curtain poles, flat-pack furnitureYesSimple carpentry with clear instructions
Garden clearing, planting, simple pathsOften yesPhysical rather than technical
Floor and wall tilingWith practiceAchievable with patience; mistakes are visible
Laying flooringWith practicePreparation of the floor matters more than the laying
PlasteringHard to do wellA skilled trade; skimming large areas takes years to learn
Plumbing beyond simple swapsOften noHidden leaks cause expensive damage; may need approval
Electrical workMostly noDanger and, for many jobs, approval and certificates
Gas workNoIn Great Britain only Gas Safe registered engineers can do it
Removing or altering wallsNo, without professional adviceLoad-bearing walls need a structural design and approval
Roofing and work at heightUsually noFalls are a serious risk; roof coverings may need approval
Anything that might contain asbestosNo, without trainingDisturbing it releases fibres

In the UK (England and Wales)

GOV.UK says you might need building regulations approval to replace fuse boxes and connected electrics, install a bathroom that involves plumbing, change electrics near a bath or shower, replace windows and doors, replace roof coverings, or install or replace a heating system. You do not need to get approval yourself if you use someone registered with a competent person scheme. Without approval, GOV.UK warns you will not have the certificates of compliance you may need when you sell. For gas, Gas Safe Register says only Gas Safe registered engineers can legally do gas work. Scotland and Northern Ireland have their own building rules.

Watch out

HSE says it can be found in any building built before the year 2000, and its advice for members of the public is not to try to repair or remove asbestos materials yourself without training for non-licensed asbestos work. If you suspect it, stop and get it checked before you strip out.

Is it cheaper to DIY a renovation?

Sometimes, but not always, and rarely by as much as people hope. What you avoid is the labour charge on the jobs you do. What you add is easy to forget:

  • Tools you buy or hire for the job, and the ones you discover you need halfway through.
  • Materials you waste while you learn, such as the first boxes of tiles or a batch of adhesive that went off.
  • Time, which on a renovation is money if you are paying for somewhere else to live, or delaying a move.
  • Rework, if a job has to be stripped out and redone by a professional.
  • Knock-on delays, when a trade cannot start until your part is finished.

So price both options. For each job you are thinking of doing, write the DIY line (tools, materials, extra time and living costs) next to the trade's quote. Our guide to writing a renovation scope helps you describe the job so the quote is for exactly the same work.

Tip

Some trades will quote for "labour only" on part of a job, or for finishing work you have prepared. Ask, and make sure the quote says exactly where your part ends and theirs begins.

How to plan a DIY renovation

Step 1: list every job, room by room

Start from the whole house, not the job you are excited about. Go room by room and write down every job, from stripping out to the last coat of paint. Then add the jobs that cross rooms: rewiring, plumbing runs, heating, windows and the roof. A home renovation checklist helps you put them in the order they need to happen.

Step 2: decide who does each job

Run the four-question test on every line and mark it as DIY, trade or hybrid. Be honest about hybrids: if you strip a bathroom so the plumber can start, the plumber's start date now depends on you.

Step 3: give every DIY job a line in the plan

Example renovation finance: estimates, paid amounts and agreed costs still to payCosts & spending in Mekozo, close up: whole project £8,300 plus one unpriced item, paid £2,000, still to pay £3,500, £12,000 in the plan

Mekozo's Costs & spending view shows your renovation costs room by room or by piece of work, whether you or a trade is doing the job, with what is paid and still to pay.

Try it free for 30 days, no card needed

A DIY job needs the same four things as a trade's:

  1. A scope. What is included and where it stops.
  2. A date. When you will start and when you must finish so the next trade can follow.
  3. A materials list. Quantities, product choices and where you will buy them.
  4. A budget line. Materials, tools, waste disposal and any hire.

Step 4: put the trades in the right order

Your jobs and theirs have to interlock. A typical order is strip out, structural work, first fix of electrics and plumbing, plastering, second fix, then flooring and decorating. If you are doing the stripping out and the decorating, you sit at both ends of that sequence, so the trades in the middle are waiting on you at the start and you are waiting on them at the end.

Step 5: find and brief the trades early

Good trades are often booked weeks or months ahead. Ask for quotes on the same written scope, and check what Citizens Advice suggests a quote should include: a fixed total, a breakdown of the work and materials, how long the price is valid and whether it includes VAT. Our guide to comparing builders' quotes on the same scope shows how to line them up, and our guide to finding a good builder covers the questions to ask.

Step 6: track your own spending like a supplier's

DIY spending leaks. Small trips for screws, sealant and blades add up, and they are easy to forget. Keep every receipt and record each purchase against the job and the room the day you make it, so your home renovation budget shows the real cost of the work you are doing yourself.

Safety basics for DIY renovation

  • Isolate before you start. Turn off the power to the circuit and the water to the area, and check they are off.
  • Find what is in the wall. Pipes and cables are rarely where you expect in an old house. Use a detector and, if in doubt, do not drill.
  • Wear the right protection. Eyes, ears, lungs and hands, matched to the tool and the material.
  • Do not work at height alone. Use proper access equipment, not a chair or a stack of boxes.
  • Stop when you are unsure. A pause to ask costs far less than a repair.

On the Operation Sicily villa

From the villa in Sicily. The villa renovation that Mekozo's founder, Jonathan Smith, films for Operation Sicily is a working example of the hybrid approach. He had never laid a single tile before the project, and his first ever tiling job was over the villa's existing floor tiles. He tiled the lounge in stages, leaving each section for two to three days so there was always a way in and out (Episode 86). Early on he hired a notary, a geometra, an electrician and a digger operator, while cutting the wall chases and setting the back boxes for the electrics himself (Episode 18). For plastering, he sprayed green crosses on every wall and ceiling he wanted done so the plasterers could quote, with a fallback of skimming the walls himself if the price was too high (Episode 29). By Episode 86 every wall was plastered, the kitchen company was booked to install the kitchen it supplied, and the bathroom was next, done entirely by Jonathan from start to finish. His practical guide to renovating a house in Sicily covers how each stage was approached.

Playing loads YouTube’s external player.

Watch directly on YouTube ↗

DIY home renovation checklist

  • Every job listed, room by room, including jobs that cross rooms
  • Each job tested: legal, approval, risk of getting it wrong, time
  • Each job marked DIY, trade or hybrid
  • Asbestos checked before stripping out an older home
  • Building regulations and gas rules checked for your country
  • Every DIY job given a scope, dates, a materials list and a budget line
  • Trades quoted on the same written scope and booked in order
  • Every DIY purchase recorded against its job and room

For the wider plan, see our guide to deciding what to do yourself and what to hand to trades, how to set a home renovation budget and how much contingency to allow. Mekozo keeps your own jobs and the trades' jobs in one plan, with quotes for the trade work compared side by side; see how to compare quotes on more than price.

This guide explains a planning method. It is not safety, legal or building advice; check the rules where you live and use qualified people for regulated work.

Questions people ask

What renovations can I do myself?

Jobs that are low risk, easy to put right and do not need approval suit DIY best: stripping out, clearing, filling and sanding, painting and decorating, fitting shelves and simple carpentry, and garden work. Tiling and laying flooring are possible with patience and practice. Anything involving gas, structure, most electrics or asbestos is a job for qualified people.

Is it cheaper to do a renovation yourself?

You avoid labour charges on the jobs you do, but you add tools, materials you may waste while learning, and your own time, which often runs far longer than a trade would take. A job that has to be redone by a professional can cost more than hiring one in the first place. Price both options line by line before you decide.

Can I do my own electrical work in the UK?

Yes, for minor work such as replacing a socket or light fitting like for like. In England and Wales, notifiable work, such as a new circuit, a new consumer unit or work near a bath or shower, must be notified to building control before you start and then inspected, unless a registered competent person does it. Scotland has its own building standards.

Do I need building regulations approval for DIY work?

The rules cover the work, not who does it. If a job needs approval, it needs it whether you or a builder does it, and GOV.UK warns that without approval you will not have the certificates of compliance you may need when you sell. Check with a building control body if you are unsure.

What jobs should you never DIY?

Gas work, which in Great Britain must legally be done by a Gas Safe registered engineer; removing or altering load-bearing walls; most electrical work; roof work at height; and disturbing anything that might contain asbestos. HSE says not to repair or remove asbestos materials yourself without training.

Sources

  1. Planning Portal, Part P: Electrical safety (Approved Document P) · Checked 18 November 2026
  2. GOV.UK, Building regulations approval: when you need approval · Page updated 20 October 2026, checked 18 November 2026
  3. Gas Safe Register, Gas safety information for home buyers and sellers · Checked 18 November 2026
  4. HSE, Asbestos FAQs: members of the public · Checked 18 November 2026
  5. HSE, Asbestos · Checked 18 November 2026
  6. Citizens Advice, Before you get work done on your home (England) · Checked 18 November 2026
  7. Operation Sicily, Episode 86: Tiling over existing floor tiles for the first time · Checked 18 November 2026
  8. Operation Sicily, Episode 18: Finding a notary, geometra and electrician in Sicily · Checked 18 November 2026
  9. Operation Sicily, Episode 29: Marking walls for plaster quotes and reusing old drains · Checked 18 November 2026
Jonathan Smith opening the gate of the villa in Sicily

About the author:

Jonathan Smith is the founder of Mekozo and Operation Sicily. Jonathan bought an abandoned villa in Sicily and is rebuilding it on camera, every week. Mekozo is the app Jonathan built to keep that renovation's money in one picture.

Related from Operation SicilyRenovating a house in Sicily: my practical guide

Real renovation experience and regional guidance from Operation Sicily.

Blog

Related reading

Plan a renovation in order: scope, quotes, budget and schedule
Planning a renovation

Home renovation checklist: plan it in the right order

A renovation goes better when the decisions come in the right order. A phase-by-phase checklist from first idea to handover: what to decide, what to check, who to book and what order the work goes in, with the sources behind each step.

A paint roller rolling blue paint onto a white wall
Planning a renovation

How much paint do I need? Work it out room by room

A simple room by room method to work out how much paint you need for walls, ceilings and woodwork, with a worked example, the coverage figures to use and how to keep a whole-house paint list.

All Blog posts →

Bring the whole picture home.

Budgets, quotes, payments, documents and decisions in one place

30 days free. No card needed.

Monthly, with no annual plan. The Terms of membership set out the details.