Planning a renovation

Loft conversion cost: how to budget yours, line by line

How to budget a loft conversion from your own loft rather than a headline average: the published UK rates, how the money splits, the fees people forget and a worked method.

A loft being converted, with new roof windows, bare blockwork and timber on the floor
Contents

Key points

  • A loft conversion is priced by its usable floor area: the HomeOwners Alliance puts the UK cost at around £1,250 to £2,500 per square metre (July 2026).
  • Which? suggests a loft budget splits roughly into labour 35 to 40%, materials 25 to 30%, fixtures 10 to 15%, planning and permissions up to 5%, and at least 10% contingency.
  • Structural types such as dormers and mansards cost more than a rooflight conversion, and Which? says a trussed roof (common after about 1970) can double the cost.
  • In England many loft conversions fall under permitted development, but every habitable loft conversion has to meet building regulations.
  • Budget fees, party wall costs, stairs, the bathroom if you add one, decorating and a contingency as separate lines, not inside one total.

A loft conversion is priced by the floor area you can actually stand up in. The HomeOwners Alliance puts the UK cost at around £1,250 to £2,500 per square metre, and Which? says structural conversions such as dormers cost more than rooflight ones. Budget your own by measuring the usable area, choosing the type, then adding fees, fit-out and contingency.

This guide shows you what drives the price, how the money usually splits, the costs that are easy to miss, and a step by step way to turn your own loft into a budget you can test against quotes.

How much does a loft conversion cost?

There is no single price, because two lofts of the same footprint can produce very different amounts of usable space. The most useful published figure is a rate per square metre of usable floor area:

MeasurePublished figureSource
Typical cost per square metre (UK)Around £1,250 to £2,500HomeOwners Alliance, updated July 2026
Basic stairsAround £1,000 to £1,500, more for custom stairsHomeOwners Alliance, July 2026
Planning application, if needed (England)£548 for a typical householder application, from 1 April 2026Planning Portal
Lawful development certificate for proposed work (England)Half the normal planning feeBradford Council fee schedule, April 2026
ContingencyNo less than 10%; 15% to 20% with structural workWhich?, April 2026

The HomeOwners Alliance says to calculate the cost by multiplying the usable gross internal area, meaning the area with headroom of 1.5 metres or more, by the finished build cost per square metre. It adds that very small conversions can be expensive per square metre, especially once you deduct the space lost on the floor below for the new staircase.

Cost by type of conversion

The type of conversion moves the price more than anything else. The published guides agree on the order, even where their figures differ:

TypeWhat changesRelative cost
RooflightRoof shape stays; windows set into the slopeLowest: the HomeOwners Alliance calls it the lowest cost option
DormerA box built out from the slope for headroom and floor spaceHigher: Which? says structural conversions cost more, and a large dormer almost twice a small one
Hip to gableA sloping end rebuilt as a vertical wall, often with a dormerHigher again, because more of the roof is rebuilt
MansardMost of the slope rebuilt near-vertical with an almost flat topHighest: the HomeOwners Alliance puts mansards at the top of the range

A trussed roof, common after about 1970, can double the cost of any type, Which? says. Use the per square metre range for a first figure, then ask for quotes for the type you need.

Watch out

A per square metre rate is a first figure, not a budget. It hides the choices that move the price most: the type of conversion, the roof structure, whether you add a bathroom and the finish you want.

What affects loft conversion cost?

The type of conversion

From least to most structural work:

  1. Rooflight conversion. The existing roof shape stays and windows go into the roof slope. The HomeOwners Alliance describes it as the lowest cost option.
  2. Dormer conversion. A box-shaped structure is built out from the roof slope to add headroom and floor space.
  3. Hip to gable. A sloping end of the roof is rebuilt as a vertical wall, often combined with a dormer.
  4. Mansard. Most of the roof slope is rebuilt to create a near-vertical wall and an almost flat top. The HomeOwners Alliance puts mansards, and converting a modern truss roof, at the top of the cost range.

Which? says a large dormer conversion will cost almost twice as much as a small one, so size matters as much as type.

The roof structure

Which? notes that houses built before 1970 tend to have open, self-supporting rafters that are easier to convert, while houses built after about 1970 often have roof trusses that span the roof. Converting trusses needs more work to keep the roof sound, which it says can double the cost. Look in your loft before you budget: a forest of diagonal timbers usually means trusses.

What the room is for

A bedroom with an en suite costs more than a home office, because of pipework, waste, waterproofing, ventilation and fittings. Decide the use first, then price it.

Where you live

Which? says costs are typically lower in Northern Ireland and higher in South East England and London, where labour and materials cost more.

Access and the work around the loft

Scaffolding, moving a water tank, rerouting pipes and cables, and making good the floor below where the stairs arrive all add cost. So does a party wall if your house is attached.

How a loft conversion budget splits

Which? suggests a loft conversion budget breaks down roughly like this, whatever the total:

Part of the budgetShare of the total
Labour35% to 40%
Materials25% to 30%
Fixtures and fittings10% to 15%
Planning and permissionsUp to 5%
ContingencyNo less than 10%

Use the shares as a check, not a target. If a quote puts labour at half the total, or leaves no room for fixtures, ask why.

Fees, permissions and the costs people forget

These are easy to leave out of a headline figure. Give each one its own line:

  • Design. Drawings from an architect or architectural technologist.
  • Structural engineer. Calculations for new beams, floor joists and any structural changes.
  • Building control. The fee for approval and inspections, or the cost of using registered installers.
  • Planning. An application if you need one, or a lawful development certificate if you want written confirmation that you do not.
  • Party wall. Notices to neighbours and, if they appoint a surveyor, the surveyor's costs.
  • Scaffolding and waste. Often priced separately from the building work.
  • Stairs. Standard or custom, and the work to the floor below.
  • Fit-out. Insulation, electrics, heating, plastering, flooring, doors and any bathroom.
  • Decorating and furnishing. Often forgotten until the room is finished.
  • Living costs. If the work disrupts the house, budget for it.

In the UK (England)

The Planning Portal says a loft conversion can be permitted development if the extra volume, including any earlier enlargement, is no more than 40 cubic metres for a terraced house or 50 cubic metres for other houses. Other conditions include materials similar in appearance to the house, no extension beyond the front roof slope where it faces a highway, no balconies or raised platforms, side windows obscure-glazed, and not being on designated land. Building regulations still apply: Which? says a habitable conversion must comply whether or not it needs planning permission, and GOV.UK warns that without approval you will not have the certificates of compliance you may need when you sell. If the work affects a shared wall, GOV.UK explains when and how to tell your neighbours. Wales, Scotland and Northern Ireland have their own rules.

Outside the UK

The same budget lines apply, but planning rules, building standards and the professionals involved differ by country. Check the official planning and building authority where the property is, and ask a qualified local professional before you commit.

How to budget a loft conversion, step by step

Step 1: measure the usable area

Measure the floor area where the finished headroom will be at least 1.5 metres. That is the figure the published rates use. If you are not sure what the finished height will be after insulation and new floor joists, ask a designer to check before you go further.

Step 2: choose the type and the use

Decide whether a rooflight conversion gives enough space, or whether you need a dormer or more. Decide what the room is for: bedroom, office, bathroom or storage. Our guide to writing a renovation scope helps you describe it so every quote prices the same job.

Step 3: make a first estimate

Multiply your usable area by the published range. As an illustration only, a loft with 25 square metres of usable floor at the HomeOwners Alliance range of £1,250 to £2,500 per square metre gives roughly £31,250 to £62,500. That is a range to test quotes against, not a price for your loft.

Step 4: build the budget line by line

Costs & spending in Mekozo, close up: whole project £8,300 plus one unpriced item, paid £2,000, still to pay £3,500, £12,000 in the plan

Mekozo's Costs & spending view shows the loft's costs so far, what is paid, what is agreed but still to pay, any line not yet priced, and the money in your plan.

Try it free for 30 days, no card needed

Break the first estimate into the lines above, then mark each one by how solid it is:

  1. Estimate. A published rate or your own guess.
  2. Quote. A written price for that line.
  3. Agreed. A quote you have accepted.
  4. Paid. Money that has gone.

Step 5: add a contingency from your own risks

Start from Which?'s guide of at least 10%, or 15% to 20% with structural work, then adjust for what you know about your loft: the age of the roof, a water tank to move, wiring in the way, or an attached neighbour. Our guide to renovation contingency shows how to size it from a list of risks.

Step 6: compare quotes on the same scope

Get several written quotes for the same drawings and specification. Which? suggests at least three, and a fixed-price contract so the price cannot change except in agreed circumstances. Our guide to comparing builders' quotes shows how to line them up item by item.

Tip

Ask every firm to list what is excluded. Decorating, flooring, the bathroom suite, building control fees and party wall costs are often left out of a "from" price.

Loft conversion or extension?

A loft conversion usually keeps your garden and works within the existing footprint, while an extension adds space at ground level. Both are priced in the same way: by area, type and finish, with fees and contingency on top. If you are weighing the two, budget both on the same basis before you decide. Our guide to house extension cost uses the same method.

On the Operation Sicily villa

From the villa in Sicily. The villa that Mekozo's founder, Jonathan Smith, is renovating has no loft to convert, but it shows the same idea of making the top of a house usable. In Episode 42 of Operation Sicily, he knocked through a walled-up doorway at the top of the stone tower onto the roof, which is about 100 square metres, to create a way out onto a future roof terrace and bring natural light down the tower. A staircase up to the roof and a full roof terrace are planned once the villa's water is connected (Episode 86). His budgeting approach, set out in Episode 14, applies just as well to a loft: break the budget into labour, materials, and permits and fees, then add a backup fund of 10% to 15% for the unexpected. His real-world breakdown of renovation costs in Sicily covers costs for an Italian project.

Playing loads YouTube’s external player.

Watch directly on YouTube ↗

Loft conversion budget checklist

  • Usable area measured (headroom of 1.5 metres or more)
  • Roof structure checked: rafters or trusses
  • Type and use of the room decided
  • First estimate made from a named, dated rate
  • Planning position checked for your country
  • Building regulations route agreed
  • Party wall position checked if the house is attached
  • Design, engineer, building control and scaffolding priced as separate lines
  • Stairs, fit-out, bathroom and decorating included
  • Contingency sized from your own risks
  • Quotes compared on the same drawings and specification

For the wider plan, see our guide to planning bigger projects such as lofts and extensions and how to set a home renovation budget. To keep the loft inside a whole-house budget, see the renovation budget tracker and how to build a whole-project budget in Mekozo.

This guide explains a budgeting method. Figures are published rates and shares, not quotes, and nothing here is planning, legal or financial advice; get written prices and check the rules for your own home.

Questions people ask

How much does a loft conversion cost in the UK?

It depends on the type, the size of the usable space and where you live. The HomeOwners Alliance puts the typical cost at around £1,250 to £2,500 per square metre of usable floor area, in a guide updated in July 2026. Multiply your own usable area by that range for a first figure, then replace it with quotes.

What is the cheapest type of loft conversion?

A rooflight conversion, which fits out the existing roof space with windows set into the roof slope, usually costs least because it needs the fewest structural changes. Which? says conversions that need structural work, such as a dormer or a mansard, cost more. A trussed roof, common in houses built after about 1970, can double the cost.

Do I need planning permission for a loft conversion?

In England, many loft conversions are permitted development, so no application is needed, as long as they meet conditions such as a volume limit of 40 cubic metres for terraced houses and 50 cubic metres for other houses. Designated land and earlier extensions change the answer. The Planning Portal gives the fee for a typical householder application in England as £548, and a lawful development certificate for proposed work is charged at half the normal planning fee.

Does a loft conversion need building regulations approval?

Yes, if you are turning the loft into a room you will use. Which? notes that a conversion must comply with building regulations whether or not it needs planning permission, covering structure, fire safety and sound insulation between floors. Without approval you will not have the certificates you may need when you sell.

How much contingency should I add to a loft conversion budget?

Which? recommends no less than 10% of the total, rising to 15% to 20% if structural work is involved. Size it from your own risks: an old roof, unknown joists, a water tank to move and access for materials all argue for the higher end.

Can I do a loft conversion myself?

For most homeowners, not the structural part. Which? says you need extensive knowledge of structural work and the conversion must meet building regulations, so it is best left to professionals. You can cut the labour bill by decorating the finished loft yourself.

Sources

  1. Which?, How much does a loft conversion cost in 2026? (BCIS data, 2025) · 23 April 2026
  2. HomeOwners Alliance, Loft conversion costs and how to reduce them · Updated 28 July 2026
  3. Planning Portal, Loft conversion: planning permission (England) · Checked 18 November 2026
  4. Planning Portal, How much does a planning application cost? · Checked 18 November 2026
  5. City of Bradford Metropolitan District Council, Scale of planning fees (from 1 April 2026) · Checked 18 November 2026
  6. GOV.UK, Building regulations approval: when you need approval · Page updated 20 October 2026, checked 18 November 2026
  7. GOV.UK, Party walls and building work · Page updated 20 October 2026, checked 18 November 2026
  8. Operation Sicily, Episode 42: Opening up the tower room to the roof · Checked 18 November 2026
  9. Operation Sicily, Episode 86: Tiling over existing floor tiles for the first time · Checked 18 November 2026
  10. Operation Sicily, Episode 14: How to budget for a renovation in Italy · Checked 18 November 2026
Jonathan Smith opening the gate of the villa in Sicily

About the author:

Jonathan Smith is the founder of Mekozo and Operation Sicily. Jonathan bought an abandoned villa in Sicily and is rebuilding it on camera, every week. Mekozo is the app Jonathan built to keep that renovation's money in one picture.

Related from Operation SicilyHow much does it really cost to renovate a house in Sicily? (2026)

Real renovation experience and regional guidance from Operation Sicily.

Blog

Related reading

A renovation budget by room: kitchen, bathroom, rewiring and one job not priced yet
Planning a renovation

Home renovation budget: how to set one, step by step

A home renovation budget is a spending limit, a scope and a list of every cost, with a contingency on top. Eight steps to set one, the lines people miss, and how to keep it honest once work starts.

All Blog posts →