
Questions to ask when buying a house: the full checklist
The questions that matter across the whole purchase, from the first viewing to the binding contract, grouped by who can answer them, with a checklist you can reuse for every house.
A spreadsheet or an app can both keep a house search organised, if they track the right things. Here is what to record for every home, how to set up a spreadsheet, and what a good house hunting tool should do.

A house hunting app and a house hunting spreadsheet do the same job: they keep every home you consider in one place, judged the same way. Track its full cost, how it meets your wish list, viewing notes and photos, and open questions. A spreadsheet suits a short search; an app suits longer searches and searching with a partner.
This guide covers what to track, how to set up a spreadsheet, and what to look for if you choose a house hunting app.
Saved listings, screenshots, notes on your phone, emails from agents and a partner's opinions in a message thread: after a few weekends of viewings, the details blur. Was it the second house or the third that had damp in the back bedroom? Which one had the long commute?
A system fixes three problems:
Whatever you use, record the same fields for every property:
| Field | Why it matters |
|---|---|
| Address and listing link | Listings change or disappear |
| Asking price | The starting point, not the total |
| Estimated buying costs | Tax, legal fees, survey, moving |
| Work needed and a rough cost | A cheaper house can cost more once work is added |
| Running costs | Energy rating, council tax band, service charges |
| Score against each must-have | Keeps the comparison honest |
| Viewing date and who went | So you know whose notes are whose |
| Notes and photos | Taken on the day, room by room |
| Red flags | Damp, cracks, roof, boundaries, anything to check |
| Questions for the agent | And the answers, with dates |
| Status and next step | Shortlisted, second viewing, ruled out, offer |
Tip
Write down why you ruled a home out. Over a long search, the reasons you say no tell you more about what you want than the homes you like.
A simple spreadsheet needs three tabs.
List your priorities in two groups:
Our guide to writing a house wish list shows how to separate the two.
Score every home against each must-have in the same way: met, not met or unknown. An unknown is a question to answer, not a pass. Our guide to comparing properties with priorities shows how to score homes against them.
One row per home, with the fields from the table above as columns. Add a column for each must-have, marked met, not met or unknown, a count of the must-haves met, and a total cost column that adds the buying costs and the rough cost of work to the asking price.
One row per viewing, linked to the property, with the date, who went, your notes and a link to the photos. Our list of questions to ask when viewing a house gives you the notes to take.
Watch out
Spreadsheets break quietly. A formula copied into the wrong row, two versions saved by two people, or photos kept in a separate folder that nobody can match to the right house. If you share a spreadsheet, agree who updates it and when.
| Question | Spreadsheet | House hunting app |
|---|---|---|
| Short search, a handful of homes | Works well | Works well |
| Notes and photos during a viewing on a phone | Awkward | Usually easier |
| Searching with a partner or family | Risk of versions | Shared list |
| Full cost of each home, not just price | You build the formulas | Look for it built in |
| Scoring against a wish list | You build it | Look for it built in |
| Carrying the chosen home into buying | Start a new file | Look for it built in |
| Full control over layout | Yes | Depends on the tool |
There is no wrong answer. The test is simple: after every viewing, can you see that home next to the others, against the same priorities and the same full cost, within a minute?

Mekozo compares the homes you are considering side by side against your Property Brief, showing which points each one meets, which it misses, and its price.
Try it free for 30 days, no card neededIf you choose an app, look for these, in this order:
Watch out
A tool that only saves listings is a bookmark list, not a system. The value is in your own notes, scores and costs, so check you can export or keep them.
Some facts are easy to look up before you spend a Saturday on a viewing. Record them against the home so they are there when you compare.
In the UK
On GOV.UK you can find an existing energy certificate for a property in England, Wales or Northern Ireland, by postcode, street or certificate number; Scotland has a separate register. You can check the long term flood risk for an area in England from rivers and the sea, surface water, reservoirs and groundwater, though GOV.UK says the service does not tell you how likely an individual property is to flood. HM Land Registry publishes Price Paid Data, the sale prices of properties in England and Wales submitted to it for registration. Other countries have their own sources; check the official ones where you are buying.
For the full journey from first search to offer, see our house hunting checklist. The HomeOwners Alliance viewing checklist suggests viewing a home two or three times, at different times of day, so give each visit its own row. For each viewing itself, tick these off:
On the Operation Sicily villa
From the villa in Sicily. Before Jonathan Smith, Mekozo's founder, bought his villa in western Sicily, he wrote down exactly what he was looking for: a detached house with a garden, at least two bedrooms, in a quiet spot near the sea, for under €100,000, that had been on the market a while and needed a complete renovation with room to add value. He searched an Italian property website, built a list of favourites, then spent three months travelling Sicily's coast and made more than 50 viewings. Two homes fell away late. A villa near Syracuse turned out, during negotiations, to have been built over an archaeological site that was left out of the documents, and a farmhouse outside Palermo had a hidden room in the cellar that was missing from every official plan; he walked away from both (Episode 8). Fifty viewings is a lot to hold in your head, and both near misses show why questions and answers belong with the home they relate to. Operation Sicily, where he films the renovation, has a guide to planning a property viewing trip to western Sicily that covers how to plan viewings abroad.
Playing loads YouTube’s external player.
Watch directly on YouTube ↗The method matters more than the tool:
For the whole first stage, see our guide to choosing a home, from wish list to shortlist. In Mekozo you can keep viewing notes, photos and a checklist in Viewing Mode, with every home in the same search.
This guide explains a method for organising a house search. It is not legal, survey or financial advice.
Either works if it records the same things for every home: the full cost, how it meets your wish list, your viewing notes and photos, and the questions still open. A spreadsheet suits a short, simple search. A house hunting app tends to suit longer searches, viewings on a phone and buyers searching with a partner.
One row per property, with the address, link, asking price, estimated buying costs, size, your score against each must-have, viewing date, notes, photos, red flags and next step. Keep your wish list on its own tab so every home is scored against the same priorities.
Look for a tool that keeps a wish list, lets you take notes and photos at a viewing on your phone, compares homes side by side against your priorities and the full cost, lets a partner see the same list, and carries the home you choose into the buying stage.
Add each home to your list before you go, with its price and link, then take notes and photos room by room on the day and mark each must-have as met, not met or unknown. Record the red flags, the questions for the agent and their answers, update the full cost, and write down why if you rule the home out.
On GOV.UK you can find an existing energy performance certificate for a home in England, Wales or Northern Ireland, check the long term flood risk for an area in England, and HM Land Registry publishes the sale prices of properties in England and Wales.
Real renovation experience and regional guidance from Operation Sicily.

The questions that matter across the whole purchase, from the first viewing to the binding contract, grouped by who can answer them, with a checklist you can reuse for every house.

Old houses are built differently from modern ones. What to check element by element, which permissions to confirm, the survey to ask for and how to turn what you find into a budget before you offer.

A 1 euro house in Italy comes with a deposit, a notary, taxes on the deed, design and permits, and a renovation with a deadline. Every cost heading, a method to budget one, and the official sources to check.
Budgets, quotes, payments, documents and decisions in one place
30 days free. No card needed.
Monthly, with no annual plan. The Terms of membership set out the details.