
How to find the history of your house, step by step
A step by step method for tracing the history of your house, from the title register and old maps to census returns, local archives and planning files, and a way to keep what you find.
A home maintenance log is the dated record of every check, service and repair your home has had. What to record for each job, a layout to copy, and why buyers, their solicitors and warranties all care about it.

A home maintenance log is the dated record of every check, service and repair your home has had. For each job, record what was done, when, by whom, what it cost, what was found and where the paperwork is. Log clean checks as well as repairs. Buyers care because it backs up the certificates, guarantees and answers their solicitor will ask for.
A maintenance checklist tells you what to do. The log proves it was done. This guide shows what to record, gives you a layout to copy, and explains why the log matters most on the day you sell.
The two work together, but they are not the same thing.
| Maintenance checklist | Maintenance log | |
|---|---|---|
| What it holds | Jobs and how often they come round | Jobs actually done, with dates and results |
| Looks | Forward, to what is due | Back, at what happened |
| Changes | Rarely | With every job |
| Proves anything? | No | Yes, with its paperwork |
Our home maintenance checklist sets out the schedule month by month and year by year. This guide is about the record that sits behind it.

Mekozo's Property Record logs the work carried out, such as a boiler installation, with its room, what it cost and its documents, and keeps planned work separate.
Try it free for 30 days, no card neededEach entry in the log should answer the same eight questions:
Tip
If a check finds a problem, the repair becomes its own entry with its own date, price and paperwork. Do not leave it as a note on the check, where it is easy to lose.
It is tempting to only write down repairs. But "gutters cleared, no damage found" is useful twice: the next time water appears on a wall, and when a buyer's surveyor asks how the roof has been looked after.
The log is for work that has happened. Keep quotes and planned jobs elsewhere until they are done, so nobody mistakes a plan for a finished repair.
Whether you keep it on paper, in a spreadsheet or in an app, one line per job works best. Our guide to choosing a home maintenance app or spreadsheet covers the tools.
| Date | Room or system | Job | Who | Cost | Found | Next step | Paperwork |
|---|---|---|---|---|---|---|---|
| 14 Oct 2026 | Heating | Annual gas safety check and service | Gas Safe registered engineer | Your invoice total | Pressure low, topped up | Next service Oct 2027 | Service record, receipt |
| 10 Nov 2026 | Roof | Gutters and downpipes cleared | Gutter cleaner | Your invoice total | One downpipe joint loose | Refix joint | Receipt, photos |
| 18 Nov 2026 | Roof | Downpipe joint refixed | You | Cost of parts | Fixed | None | Photo |
Never overwrite an old line. The value is in the history.
Watch out
A log without paperwork is only your word. Keep the certificate, service record or receipt with every entry that has one.
When you sell, the questions about your home come from three directions: the property information form, the buyer's surveyor and any guarantees that come with the house. A log helps with all three.
In England and Wales
Sellers usually answer the Law Society's TA6 property information form. The Law Society's explanatory notes for the 6th edition list documents you may need, including planning permissions and building control consents, competent person certificates, any guarantees and warranties, and information about any works you have carried out. For the heating system, the notes say sellers should provide details of the installation and supporting documents together with the most recent inspection report. They also say that if you do not know an answer, you must say so, and that incomplete answers may delay the sale or cause the buyer to withdraw. Your solicitor or conveyancer will tell you exactly what is needed for your sale.
A log turns those questions from a search through old emails into a quick look-up.
This is the part most people miss. The Law Society's notes tell buyers that guarantee claims can often only be made if the item has been properly and regularly maintained and used in line with the supplier's instructions, and that this is often difficult to prove. A guarantee on a boiler, windows or a roof is worth more to a buyer when you can show the servicing that keeps it valid.
Gas Safe Register recommends an annual safety check and service for any gas appliance unless the manufacturer's guidelines say otherwise (Gas Safe Register). A log with a service entry every year, each with its record attached, is the proof.
GOV.UK warns that without building regulations approval you will not have the certificates of compliance you may need when you want to sell your home (Building regulations approval). Logging each job with its certificate the day it arrives means you are not chasing a contractor years later.
A buyer's surveyor may ask about the roof, the electrics, damp or past alterations. Electrical Safety First recommends that the electrics in an owner-occupied home are inspected every 10 years, and before selling (Electrical Safety First). If your log shows the last inspection and what it found, you can answer from the record rather than from memory.
Our guide to documents needed to sell a house covers the rest of the paperwork, from the energy certificate to the title.
Start with the systems that matter most to a buyer and cost most to put right.
Our guide to organising appliance manuals and warranties covers what to keep for each appliance.
You do not need to begin with a blank page.
Tip
Photograph work before it is covered up. A photo of pipes or cables before a wall is closed tells the next plumber, electrician or buyer exactly what is behind it.
A few habits keep a log readable after ten years:
On the Operation Sicily villa
From the villa in Sicily. One of the most useful entries in a home's record is the one that shows what is hidden behind a wall. When Jonathan Smith, Mekozo's founder, fitted the bathroom plumbing at the villa he films for Operation Sicily, he set recessed valves for the shower, shower head, bath, sink and a bidet spray, using a mock tile to get each valve to the right depth, and the pipework was flushed and pressure tested before the wall chases were filled. A bidet or bidet spray was also needed for the geometra to sign the bathroom off (Episode 79). A dated entry with photos of those pipes, the test and the sign-off is exactly the kind of record a future plumber or buyer will want.
Playing loads YouTube’s external player.
Watch directly on YouTube ↗Find the last boiler service record and make it the first line of your log: the date, the engineer, the cost, what they found and when the next one is due. Then add the next job the day it is done. For more on this stage, see our guide to keeping track of a home after you move in and how to keep manuals, warranties and home documents together in Mekozo, where each maintenance job sits in the home's history.
This guide explains how to keep maintenance records. It is not legal advice; your solicitor or conveyancer will tell you what your own sale needs.
A home maintenance log is a dated record of every check, service and repair carried out on a home. Each entry says what was done, when, by whom, what it cost, what was found and where the paperwork is. Over time it becomes the history of the house.
For every job, record the date, the room or system, what was checked or done, who did it with their contact details, the cost, what they found and what they recommended, and the paperwork: certificates, receipts, service records and photos. Record checks where nothing was wrong as well as repairs.
Records answer the questions a buyer's solicitor and surveyor raise about past work, certificates and guarantees. The Law Society notes that guarantee claims often depend on an item having been properly and regularly maintained, so a log of servicing helps show a guarantee still has value.
Keep them for as long as you own the home, and hand the relevant ones to the buyer when you sell. Certificates, guarantees and service records for the boiler, electrics, windows, roof and any building work are the ones most often asked for.
Yes. Start with what you can prove: gather the service certificates, invoices, guarantees and receipts you already have, and add one line for each with its date. Then ask installers or the previous owner for anything missing, and add every new job the day it is done.
Real renovation experience and regional guidance from Operation Sicily.

A step by step method for tracing the history of your house, from the title register and old maps to census returns, local archives and planning files, and a way to keep what you find.

A practical home maintenance schedule: what to check every month, every season, every year and every few years, with the UK guidance behind each check and how to keep a record of it.

What goes in a home file, how to organise it so you can find things fast, and which documents matter most when you repair, claim or sell.
Budgets, quotes, payments, documents and decisions in one place
30 days free. No card needed.
Monthly, with no annual plan. The Terms of membership set out the details.