Troubleshooting

Add Mekozo to your desktop or home screen

Add Mekozo to your desktop, taskbar, Dock or home screen so it opens in its own window, straight to your projects. It is the same web app and the same account.

What adding Mekozo does

Mekozo runs in your web browser. Adding it to your desktop or home screen gives it its own icon and its own window, without the browser's tabs and address bar, and it opens straight to Projects. It is the same web app you use in the browser, with the same account and the same projects. It is not a separate app from an app store.

When you are signed in, Mekozo shows Add to desktop at the top of the page, beside your account (on a phone, a small phone icon called Add to home screen). Your projects page also shows a one-time note, Keep Mekozo one click away, with the same button. Choose Not now to hide the note on that device. Once Mekozo is added, or when you open it from its icon, both disappear.

What happens next depends on your browser. Find yours below.

In Chrome or Edge on a computer

  1. Sign in to Mekozo and choose Add to desktop at the top of the page.
  2. Your browser shows its own box asking whether to install Mekozo. Choose Install.
  3. Mekozo opens in its own window. On Windows, right-click its icon on the taskbar and choose Pin to taskbar to keep it there. On a Mac, it is in your Dock and in Applications.

If the box does not appear, click the install icon at the right end of the address bar. Or open the browser's menu: in Chrome choose Cast, save and share, then Install page as app; in Edge choose Apps, then Install this site as an app. If Mekozo is already added, the browser offers to open it instead.

In Safari on a Mac

Safari does not show an install box, so Mekozo shows three short steps instead:

  1. Click File in the menu at the top of the screen.
  2. Click Add to Dock.
  3. Click Add. Mekozo appears in your Dock and in Applications.

Add to Dock needs macOS Sonoma (14) or later. On an older Mac, use Chrome or Edge, or keep Mekozo as a bookmark.

In Firefox on a computer

Firefox on a computer cannot add sites to the desktop as their own window. You can still keep Mekozo close:

  • Open Mekozo in Chrome or Edge and choose Add to desktop there.
  • Or bookmark it: press Ctrl+D (Cmd+D on a Mac).

On an Android phone or tablet

  1. Open Mekozo in Chrome and sign in.
  2. Tap the Add to home screen icon at the top of the page, or Add on your projects page.
  3. Your phone shows its own box. Tap Install.

If the box does not appear, open the browser's menu (⋮) and tap Add to home screen or Install app, then Install or Add. Other Android browsers, such as Samsung Internet and Firefox, have the same option in their menu.

On an iPhone or iPad

  1. Open Mekozo in Safari and sign in.
  2. Tap the Share button: at the bottom of Safari on an iPhone, at the top on an iPad.
  3. Scroll down and tap Add to Home Screen.
  4. Tap Add.

Mekozo appears on your home screen and opens like any app, straight to your projects. The first time you open it from there, you may need to sign in once.

Removing it again

Removing the icon never deletes your account or your projects.

  • Chrome or Edge: in the Mekozo window, open the menu at the top and choose to uninstall Mekozo.
  • Safari on a Mac: delete Mekozo from Applications. To take it off the Dock only, right-click it and choose Options, then Remove from Dock.
  • Android, iPhone or iPad: touch and hold the Mekozo icon and choose to remove it.

Common mistakes

  • Looking for Mekozo in an app store. It is not there. Add it from your browser as described above.
  • Opening it with a different account. The added Mekozo uses the account you sign in with, just like the browser. Check the email address on Your account if a project seems to be missing. See trouble signing in or finding your project.
  • Expecting it to work without the internet. Mekozo always loads your latest figures from your account, so it needs a connection, just like the browser.

Mistoqsijiet li n-nies jagħmlu

Is this a different app from the website?

No. It is the same Mekozo web app in its own window, with the same account and the same projects. Anything you change there is the same as changing it in your browser.

Why can I not see Add to desktop in Mekozo?

It is hidden once Mekozo has been added, and when you open Mekozo from its desktop or home screen icon. If you are in Firefox on a computer, the button opens a short guide instead.

Does it work offline?

No. Mekozo needs an internet connection, so you always see your latest figures and nothing is shown from an old copy.

Għadek mimli dubju? Ikkuntattja s-support

Ġib l-istampa sħiħa d-dar.

Baġits, kwotazzjonijiet, ħlasijiet, dokumenti u deċiżjonijiet f'post wieħed